Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Operative Expert Estimation of Innovative Policy of Mining Enterprise Technological Development using Sustainable Development Principles

    In this paper the system of an operative expert estimation of innovative policy of mining enterprise technological development on sustainable development principles, created in the laboratory of econo

    Dec 6, 2010

  • AUSIMM
    Enabling Technologies – The Role of New Communications Technologies

    By C Fischer

    The introduction of digital communications technologies into the underground mining industry, in both coal and hard rock mining, has enabled high bandwidth applications to be applied in the mining ind

    Nov 22, 2011

  • AUSIMM
    Tunnel Design in an Alliance for Waterview Connection, New Zealand

    By D Maconochie, S Pradhan, M Reed

    The Waterview Connection will provide a high-quality strategic alternative to State Highway One and complete Auckland’s Western Ring Route connecting State Highways 20 and 16. The project includes twi

    Sep 17, 2014

  • AUSIMM
    In-Pit Crushing and Conveying Bench Operations

    By T Atchison

    In-pit crushing and conveying (IPCC) systems have come under growing scrutiny as a perceived mitigation to fuel and equipment price fluctuations, labour shortages and the need to move everincreasing v

    Jul 11, 2011

  • AUSIMM
    Mount Carlton comminution circuit design, start-up and optimisation

    By B Putland, I Lovatt, D Schwann, A Cervillin

    The Mount Carlton project in Queensland's North East sits on a high-sulphidation epithermal style deposit rich in gold, copper and silver. Mt Carlton is an open pit mining operation with ore proce

    Aug 29, 2018

  • AUSIMM
    A Due Diligence Approach to Environmental and Social Business Performance Assessment

    The modern resource extraction enterprise is a complex capital intensive business operating in a world of constantly evolving social, environmental and economic scrutiny. Investors, government, media

    Jun 1, 2010

  • AUSIMM
    Rock stress measurements – a site geotechnical toolkit

    By P B. Hills

    Increasingly over the past couple of decades, the importance of understanding the in situ stress regime in underground hard rock mines has become accepted by all. Providers have responded to this requ

    Nov 29, 2022

  • AUSIMM
    Mine Real-Time Personal Respirable Dust and Diesel Particulate Matter Monitoring

    By H W. Wu, T Harvey

    An overview is given of two new developments in mine atmospheric monitoring. A new personal dust monitor (PDM) that gives real-time respirable dust readings is discussed. The unit is mounted within th

    Jan 1, 2008

  • AUSIMM
    Rock Pressure Control in Development of Heading Face

    The problem of stability of the development working at the great depths of coal winning is of great seriousness. Numerous researches of the problem were carried out in the USSR, the results of which d

    Jan 1, 1991

  • AUSIMM
    Managing Human Rights and Sustainable Development - Effective Corporate-Community Relationships

    This paper identifies the challenges and opportunities for mining companies and communities in investing in human rights compatible, credible, effective and representative company-community relationsh

    Jun 1, 2010

  • AUSIMM
    Exploration of the Horn Island Gold Deposit, Torres Strait

    The Horn Island gold and mineral field produced 194 kilograms of gold in the 4 years subsequent to its discovery in 1894, from an area of shallow workings 1.5 kilometres x 0.5 kilometres. Gold deposit

    Jan 1, 1986

  • AUSIMM
    Effect of Iron Removal and Reduction on Gold and Silver Extraction by Thiourea Leaching of a Pressure Oxidation Product

    By Woodcock J. T, Zhu T, Sparrow G. J

    A lead-zinc-pyrite flotation middling was pressure oxidised to give residues containing iron hydroxy sulphates (a mixture of basic iron sulphate (BIS) and a hydrated iron sulphate (HIS)) and lead su

    Jan 1, 1991

  • AUSIMM
    Mine geology standardisation – providing the foundation to consistent short-term geometallurgical product predictions in a complex multimine and supply chain environment

    By B L. Sommerville

    "The theme of this International Mining Geology Conference is ‘Setting New Standards’. Rio Tinto’s iron ore operations include a complex integrated supply system to deliver ore from 15 mine operations

    Sep 20, 2017

  • AUSIMM
    Rock Stresses at Ok Tedi, Papua New Guinea

    By L Mollison, K W. Mills, N R. P Baczynski, M F. Lee, I A. de Bruyn

    This is the first of two papers concerned with rock stress inputs to various mine design issues at the large Ok Tedi open pit mine in Papua New Guinea. The companion paper (also published at this conf

    Nov 5, 2014

  • AUSIMM
    Validation of Resource Models - Myths, Materiality and Modern Approaches

    We are moving into an era where we experience the consequences of the skills crisis û namely many resource models have been generated by inexperienced people under pressure to deliver high quality res

    Jan 1, 2009

  • AUSIMM
    Dynamic Pit and Waste Dump Schedule Optimisation at Tropicana Gold Mine

    By S Graskoski, S Craig, C Myburgh

    Too often in mine planning, maximising revenue-generating material takes precedence over minimising costs. The ability to target both revenue and cost optimisation enables mine plans to fulfil corpora

    Sep 26, 2013

  • AUSIMM
    In-Line Pressure Jig Preconcentration Plant at the Pirquitas Mine

    By A H. Gray

    Gekko Systems Pty Ltd engaged in the test work, design, manufacturing and commissioning of the pre-concentration plant at Silver Standard Resources Inc’s Pirquitas mine in the north western Jujuy prov

    Aug 8, 2011

  • AUSIMM
    Experiences from developing a road map to attractive, inclusive and safe mining workplaces

    By L Abrahamsson

    The aim with this paper is to discuss experiences from the ongoing research project ‘Attract: A roadmap to attractive, inclusive, and safe mining workplaces’. The project’s aim is to analyse possibili

    Sep 1, 2024

  • AUSIMM
    Comparing Energy Efficiency in Grinding Mills

    By E Niva

    The IsaMillÖ is challenging the way that plants are designed and operated. This paper challenges existing designs of concentrator flow sheets, particularly focusing on magnetite circuits.   From

    Jan 1, 2008

  • AUSIMM
    Optimum Equipment Management Through Life Cycle Costing

    Large mining operations need equipment that consistently performs as expected. The most effective way of ensuring this is to have a defined life cycle with an optimised maintenance strategy. The deter

    Dec 6, 2010