Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Sand Mining Restoration on the Swan Coastal Plain using Topsoil – Learning from Monitoring of Previous Rehabilitation AttemptsBy E J. B van Etten
This paper reports on the results of several years of monitoring rehabilitation at a silica sand mine on the Swan Coastal Plain, south of Perth. Mining here occurs below the regional watertable and le
Oct 5, 2011
-
Impact of Initiation Mode of Explosives on Energy Release CharacteristicsBy P K. Singh
Recent advancements in understanding the detonation process are noteworthy, but they are still based on somewhat hypothetical situations. The actual variables that are essential parts of normal blasti
Nov 8, 2011
-
The Practicalities of Implementing Net Volume Licensing of Water Use in Mines and Quarries - A Discussion Based on Victorian Case StudiesBy A Horne, Z Graszkiewicz, D Dettrick, R Evan, B Neal
"Most of VictoriaÆs rivers and aquifers are already fully allocated or reaching full allocation. In regions without a well-established water market, access to water entitlements to facilitate new deve
Nov 26, 2013
-
Flotation Optimisation Studies of the Perilya Broken Hill Lead CircuitBy B Kilgariff
Flotation has been in use at Broken Hill for nearly 100 years, and the process has gone through many different optimisation studies over that time. This paper reviews the current flotation practice at
Jan 1, 2005
-
Precharging Sublevel Shrinkage Production Rings in Hot and Reactive Ground with Electronic Blasting SystemsBy B Crowdey, J Wall
The particular underground operation relating to this paper is a gold producer and has an orebody predominately consisting of rhyolite and marcasites pyrite. The ore has been identified as being react
Mar 24, 2014
-
Thin Spray-on Liners Potential in Reducing Dilution of In Situ Gas in Underground CoalminesBy Z Li, D Chalmers, J M. Tenney
This paper presents the findings and analysis of the investigation of effectiveness of thin spray-on liners (TSLs) as a gas management tool in underground coalmines. The project involves spraying TSL
Aug 31, 2015
-
Embracing Modern Ecological Methods - Monitoring and Modelling for Mine Closure, not ComplianceBy A M. Lechner, S Arnold, M J. Gillespie, P D. Erskine, D R. Mulligan, A T. Fletcher, A Gordon
Mine ecological monitoring schemes are often conducted only to address compliance and in some cases do not have the sufficient statistical power or understanding of ecological systems to assess, quant
Jul 10, 2012
-
SAG mill optimisation and increasing throughput at the Phu Kham Copper-Gold Operation – a success storyBy D Baas, J Le, R Braun, R Chandramohan, K Hollis, G Lane
The Phu Kham Copper-Gold Operation (Phu Kham) is located in northern Laos, approximately 140 kilometres from the capital, Vientiane. The operation is a producing asset for Australian-based copper and
Aug 29, 2018
-
The CSA ventilation upgrade – geotechnical challenges and learningsBy T M. Brettell, D Sidea
The CSA Mine is located in Cobar, New South Wales and is operated by Glencore. Large scale underground production started from 1965, with zinc, lead, silver and copper extracted in the past. The curre
Oct 16, 2017
-
Long-Term Water Management - The Forgotten Legacy of Mine ClosureBy G Byrne
Long-term water management is typically ignored in mine closure planning. A review of 73 mine closure plans dating from 2007 to 2013 shows that, on average, relinquishment is proposed to be achieved i
Nov 26, 2013
-
The Impact of Pile Loading on Adjacent Metro Tunnels – Barangaroo South, AustraliaBy P K. Wong, D A. F Oliveira, F M. Azad
In situations where foundation piles are located in proximity to existing or future tunnels, it is typical for the tunnel owner to require that sleeving of the piles be carried out to at least the inv
Sep 17, 2014
-
Reducing Bench Turnover Time and Improving Shovel DigabilityBy D Kavanagh, C Michaud
"A continuous improvement initiative was identified at Kalgoorlie Consolidated Gold Mine’s (KCGM) Fimiston open pit with the goal of reducing bench turnover time and increasing shovel digability by im
Nov 15, 2016
-
Assessing bulk sorting suitability at the New Afton mineBy H Kurth, L Balzan
On-belt analysers have been used since the early 1980s in the coal sector to measure ash content in real time for diverting material on conveyors to remove waste, bypass beneficiation and allow suitab
Sep 11, 2017
-
Research Needs in Regard to Design, Performance Criteria, Construction, Maintenance Assessment and Repair of Coal Mine SealsLegislation introduced for Queensland and New South Wales Coal mines provides different levels of prescription regarding specification of mine seals û generally in relation to capacity to withstand ov
Jan 1, 2005
-
Coal - Paper No. 7 Permian Sedimentation In The Newcastle Coalfield, N.S.W.By Johnson M. W
Factual data about the sedimentation in the Newcastle Coal. Measures are presented. Data concerning the total coal measure sequence (isopachs, sand /shale ratio and total coal thickness variation),
Jan 1, 1969
-
Ventilation Officers or Mine Managers? Who should Ultimately be Responsible for Mine Ventilation? A Comparison between Western Australia and QueenslandBy A Halim
"There is still debate about who should ultimately be responsible for the ventilation system in anunderground mine. The Queensland Coal Mining Safety and Health Regulation 2001, states that adedicated
Jun 1, 2012
-
Analytical Fingerprint of Columbite-Tantalite (Coltan) Mineralisation in Pegmatites - Focus on AfricaBy A Gerdes, H BrStz, E GSbler, D Davis, F Henjes-Kunst, S Dewaele, T Graupner, T Oberthnr, M Sitnikova
Following the United Nations initiative to fingerprint the origin of conflict materials, the German Federal Ministry for Economic Cooperation and Development has decided to fund a pilot study on colta
Jan 1, 2008
-
The Use of Integrated Web-Based Solutions in Productivity ImprovementBy P Cooper
Continuous improvement using six sigma methodologies commonly follows the DMAIC methodology of define, measure, analyse, improve and control. A key requirement in the use of this approach is to ensure
Jul 11, 2011
-
Controlled Blasting for Civil Construction in an Urban EnvironmentBy R Domotor
Brisbane’s Airport Link is Australia’s largest road infrastructure project, worth a total value of A$4.8 billion. The project is using surface and underground blasting to excavate hard volcanic r
Nov 8, 2011
-
Corporate Growth by Exploration - the BHP ExampleBy Blain CF
For all mineral resource-based companies, it is important to reach the right balance of investment between acquisition and exploration to allow the best chance of achieving long-term corporate goal
Jan 1, 1986