Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Chemical Basis of Flotation (4f77fd10-2462-403e-873d-32f147f6cfd3)

    Dr Wark said: I have not come to Broken Hill to tell you how to conduct flotation operations; indeed, during my short stay here I have already learned much concerning the process, of the many difficul

    Jan 1, 1994

  • AUSIMM
    Black Rock Cave (BRC) – overcoming challenging ground conditions and mitigating the impacts to production

    By H Wright

    Black Rock Cave (BRC) is a sublevel cave which was developed in 2018–2020 and has been in production since November 2020. BRC is part of the Mount Isa Mines complex and extracts a leached orebody comp

    Mar 29, 2023

  • AUSIMM
    Aluminothermic production of silicon using different raw materials

    By M Zhu, G Tranell, N Simkhada, K Jakovljevic, M Wallin

    Silicon is a vital element in many products today, such as electronic components, solar devices, high-quality alloys, and many others. The growing global demand highlights the need for the development

    Jun 19, 2024

  • AUSIMM
    Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming

    By Y Li, S Ramazan, E Topal

    A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or t

    Nov 24, 2014

  • AUSIMM
    The Application of Value Engineering Principles to Mining Studies

    By T Schrimpf, I Bryan

    The life cycle of a mining project begins with initial regional exploration and ends with mine closure and rehabilitation. Between resource definition and the commencement of mine construction is the

    May 24, 2012

  • AUSIMM
    Risk-based approach for minimising tailings dam failures

    By M Barker, H Li

    The total number of tailings accidents has reduced from over 50/decade in the 1960s-1980s to less than 30/decade in the 2000s to 2010s. However, the rate of significant tailings dam failures has not

    Jul 23, 2018

  • AUSIMM
    Critical and Deleterious Metal Deportment in Sulfidic Waste Rocks, Baal Gammon, North Queensland

    By A Parbhakar-Fox, B G. Lottermoser, N Fox

    "Determining the deportment of economic and environmentally significant elements in sulfidic mine materials (eg ore, gangue and waste) requires the use of advanced microanalytical techniques, includin

    Jun 15, 2016

  • AUSIMM
    Understanding Mineralisation Controls – A Case Study of the Chesney Deposit

    By J Channell, G Phillips

    "The Chesney deposit, located 4 km south-east of Cobar consists of three copper-gold rich shoots that lie within a larger, copper dominant lode. A fourth gold rich shoot is located adjacent to the mai

    Aug 18, 2014

  • AUSIMM
    Design considerations for an iron tailings filtration plant and their conveying and disposal systems

    By C Garrido, J Barrera, H Alvarez, L Perez, S Ramirez

    In recent years, there has had a greater recurrence of studies and projects that consider tailings filtration followed by dry stacking to reduce the consumption of fresh water, the space required for

    Nov 8, 2021

  • AUSIMM
    Vibration control blasting for low stability final walls

    By G Wyartt

    In the Pilbara region of Western Australia, an iron ore mine is undertaking a high wall cut-back to improve stability and allow access to deeper ore deposits. Several sections of the wall have been cl

    Nov 30, 2018

  • AUSIMM
    Evolution and technical considerations to manage tailings at the RPP- 140 mining title (Antioquia - Colombia)

    By García B., Wolff E.

    In Colombia, northeast of Antioquia, there is a gold deposit that has produced continuously since the middle of the XIX century, located within mining title RPP-140, property of Gran Colombia Gold Seg

    Jun 17, 2024

  • AUSIMM
    The effect of vane shear rotation speed on the estimation of tailings undrained strength

    By B Wentzinger, Y Keulemans

    This paper presents the results of a field study designed to assess the impact of vane rotation speed on the estimated undrained strength for two Australian bauxite tailings storage facilities. The va

    Jul 1, 2021

  • AUSIMM
    Anglo American Research LaboratoriesÆ (AARL) Experiences with Flotation Plant Modelling

    By V Ser, R Crosbie

    To date, Anglo American Research Laboratories (AARL) has carried out several projects, based on the techniques developed in AMIRA International LimitedÆs (the mineral industries research association)

    Jan 1, 2005

  • AUSIMM
    Developing Process Control Standards for Optimal Plant Performance at PanAust Limited

    By D Baas, D Bennett

    This paper describes how Brisbane-based PanAust Limited develops process control strategies that are implemented at all operations and are used in functional descriptions for plant upgrades and new pr

    Sep 1, 2014

  • AUSIMM
    Sampling for Grinding Pilot Plant Test - The Effect of Size Distribution Variability

    By S Brochot

    During the development of a mining project, samples are taken for metallurgical tests. The sample can be a composite sample made of material coming from a selection of various drilling products or a s

    Aug 21, 2012

  • AUSIMM
    Microanalytical Evaluations of the Savage River Old Tailings Dam, North-?west Tasmania

    By A Hughes, J Agius, T Ferguson, A Parbhakar-Fox, D Lester, L M. Jackson

    Management of historic tailings is a major challenge facing the mining industry and its regulators. However, through improved mineralogical and chemical characterisation of such materials the opportun

    Jul 27, 2015

  • AUSIMM
    Mid Sampling and Reserve Estimation Practice in the Base Metal Orebodies

    The Mount Isa mine in North West Queens- land produces a total of nearly 10 million t/yr from separate copper and silver lead zinc orebodies. Sampling information is mainly obtained from diamond dr

    Jan 1, 1987

  • AUSIMM
    In support of frontline leaders

    By A Kite

    Frontline leaders play a critical role in the safe and productive operations of Australia’s mining, resources and heavy industries. These leaders set the workplace culture, especially during night shi

    May 5, 2022

  • AUSIMM
    Controlled Blasting for Twin Tunnels with a Shallow Cover under an Operating Railway Line

    By G Gopinath, R Balachander, H S. Venkatesh

    This paper describes in detail the controlled blasting adopted and the measurements undertaken for the successful excavation of large twin tunnels under a shallow cover for a six-lane highway project

    Aug 24, 2015

  • AUSIMM
    Resource Estimation Using Reverse Circulation and Blasthole Samples in a Bedded Iron Ore Deposit

    By C Boyle

    Brockman 2 mine is located in the Pilbara of Western Australia and is operated by Rio Tinto Iron Ore. Mineralisation is hosted by synclines where there is structural complexity to focus fluid flow. Mi

    Jul 11, 2011