Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Review of Gold Deposits in the Archaean Greenstone Belts of Western Australia

    By Ho SE, Neil Phillips G, Houstoun SM

    There are numerous individual gold deposits in the Archaean greenstone belts of Western Australia, but only 26 have productions and/or quoted reserves in excess of 10 tonnes Au. Most gold producti

    Jan 1, 1986

  • AUSIMM
    Developing Process Control Standards for Optimal Plant Performance at PanAust Limited

    By D Baas, D Bennett

    This paper describes how Brisbane-based PanAust Limited develops process control strategies that are implemented at all operations and are used in functional descriptions for plant upgrades and new pr

    Sep 1, 2014

  • AUSIMM
    Common Infrastructure Project ù Development for the Future of PT Freeport Indonesia

    By B Mennie, R Poedjono, G Coad

    PT Freeport Indonesia operates a large copper and gold mining operation near Tembagapura, Papua (formerly, Irian Jaya), Indonesia. This is a remote location with its own set of unique operational char

    Jan 1, 2005

  • AUSIMM
    In support of frontline leaders

    By A Kite

    Frontline leaders play a critical role in the safe and productive operations of Australia’s mining, resources and heavy industries. These leaders set the workplace culture, especially during night shi

    May 5, 2022

  • AUSIMM
    Microanalytical Evaluations of the Savage River Old Tailings Dam, North-?west Tasmania

    By A Hughes, J Agius, T Ferguson, A Parbhakar-Fox, D Lester, L M. Jackson

    Management of historic tailings is a major challenge facing the mining industry and its regulators. However, through improved mineralogical and chemical characterisation of such materials the opportun

    Jul 27, 2015

  • AUSIMM
    Controlled Blasting for Twin Tunnels with a Shallow Cover under an Operating Railway Line

    By G Gopinath, R Balachander, H S. Venkatesh

    This paper describes in detail the controlled blasting adopted and the measurements undertaken for the successful excavation of large twin tunnels under a shallow cover for a six-lane highway project

    Aug 24, 2015

  • AUSIMM
    Resource Estimation Using Reverse Circulation and Blasthole Samples in a Bedded Iron Ore Deposit

    By C Boyle

    Brockman 2 mine is located in the Pilbara of Western Australia and is operated by Rio Tinto Iron Ore. Mineralisation is hosted by synclines where there is structural complexity to focus fluid flow. Mi

    Jul 11, 2011

  • AUSIMM
    Settling Pond Design and Construction for the Malvern Hills Coal Project, Canterbury

    The Malvern Hills coal project is now in an advanced stage of development with the stripping of overburden from above former underground workings in which a 3 m seam of subbituminous C coal with very

    Jan 1, 2003

  • AUSIMM
    Exploration Possibilities for Diamonds in Victoria

    Diamonds occur in N.S.W., Victoria and north west Tasmania. Diamonds from different areas appear to have their own characteristics, lending weight to the suggestion that three or four different sou

    Jan 1, 1979

  • AUSIMM
    Redevelopment of the Morning Star Gold Mine - ABSTRACT ONLY

    Morning Star Gold aims to enter the ranks of Australia's gold producers, revitalising the Eastern Victorian Goldfi elds in the second half of 2010 - the fi rst gold production in around 50 years

    Aug 1, 2010

  • AUSIMM
    Introduction of and Experience Gained with Cemented Hydraulic Fill at the Gossan Hill Mine, Western Australia

    By E M. Jones

    On 26 June 2000 a hydraulic fill retaining barricade failed at the Bronzewing mine in Western Australia. The barricade failure resulted in the release of 19 000 m3 of saturated hydraulic fill into the

    Jan 1, 2008

  • AUSIMM
    The Use of Glass-Fibre Reinforced Plastic on the Northern Sewerage Project Stage 1 – Design and Construction Considerations

    By S Goff

    The Northern Sewerage Project (NSP) is a $650 M infrastructure project that will increase the capacity of the sewerage system for Melbourne’s growing northern suburbs while also helping to protect the

    Mar 8, 2011

  • AUSIMM
    Redevelopment at Northparkes Following Significant Drive Closure

    By J Samosir, L A. Snyman

    Northparkes is located 27 km north of the township of Parkes in central New South Wales, Australia. The operations consist of underground block cave mines and an ore processing plant that produces hig

    Nov 5, 2014

  • AUSIMM
    Cost Management Optimisation

    By B King

    Processing expansion options and mining fleet purchases are major cost items that receive due focus in most cost management analyses. If these items are not needed, they can significantly reduce a pro

    Nov 24, 2014

  • AUSIMM
    Stope Design Within a Final Pillar Retreat Sequence at Xstrata Copper's Mount Isa Copper Mines

    Xstrata CopperÆs Mount Isa Copper Operations is located in mineral rich north-west Queensland and is one of the largest sources of copper in the world. This world-class underground operation is planne

    Jan 1, 2007

  • AUSIMM
    Mining a Narrow Tabular Reef at Depth with Reference to Rock Breaking and Associated Support Systems

    By Rosenblatt M, Gilroy J. A C Cunningham C V B

    Vaal Reefs Exploration and Mining Company Limited operates one of the largest producing gold mines in the world. The annual production of 76 tons of gold from 12 million tons of ore treated is obtai

    Jan 1, 1995

  • AUSIMM
    Rehabilitation of Pasminco Broken Hill Mine North Operation

    By J Burgess, G Scanlan

    In 1993 after over 110 years of mining operations, production ceased at the Broken Hill North Mine. Following the cessation of operations a rehabilitation program was developed to satisfy the requirem

    Jan 1, 1998

  • AUSIMM
    Management of High-pressure Groundwater in Underground Development at Ernest Henry Mine

    By T Purvis, J Calverd, A-K Greve

    The Ernest Henry Mining (EHM) underground mine is situated adjacent to the Great Artesian Basin in North Queensland and within a fracture zone. Underground development commenced in February 2008 and h

    Mar 24, 2014

  • AUSIMM
    Development of a cold bonding technology to high-grade iron ore concentrate

    By J Caron, M Athayde, F Lavoie, R Joyce

    Decarbonisation has become a major challenge for the global steelmaking industry, turning towards new technologies aimed at carbon footprint reduction, which on its own accounts for approximately 9 pe

    Nov 8, 2021

  • AUSIMM
    Grade engineering at Gramalote gold deposit, Colombia: an example of industry – research collaboration, Part 1

    By N Clarke, J Hunt, A Barros, L Keeney

    The Gramalote orebody is a large low-grade gold deposit situated in the San Roque municipality, 124 km north-east of Medellin in Antioquia, Colombia. It is jointly owned by AngloGold Ashanti (AGA) and

    Nov 10, 2020