Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Case study of joint structure and the design and performance of open pit walls at the Kanmantoo copper mine

    By B J. Hutchison, S Gannon, J Chambers, D Oko-oboh

    The Kanmantoo copper mine is located in the Adelaide Hills area of South Australia and is owned and operated by Hillgrove Resources (HGO). The mine is a drill and blast, truck and shovel operation min

    Sep 20, 2017

  • AUSIMM
    Recent Developments and Applications of Bucket Wheel Excavators in Australia

    By Bunting HR

    Developments since 1959 in major excavators to meet the high outputs of overburden and coal under the changing nature of the Morwell Coal Deposits of the Latrobe Valley are described. Particular refe

    Jan 1, 1970

  • AUSIMM
    The Real Goal of Project Development is Building Businesses, Not Projects

    All too often engineers and project teams focus on building æthingsÆ, and they tend to see the key goals as meeting the project cost and schedule targets. We frequently compound the problem by unknowi

    Jan 1, 2002

  • AUSIMM
    The Implementation of Snowden's Reconciliation Software - A Case Study from Telfer

    By J Gotte, C Morley, J Froud

    Newcrest Mining LimitedÆs Telfer Mine is a world-class gold and copper producer, situated in the Great Sandy Desert, in the north west of Western Australia. The mine has a number of distinctive charac

    Jan 1, 2007

  • AUSIMM
    Development Of Equipment For Narrow Vein Mining

    Conventional narrow vein mining, utilising hand held methods, is expensive and requires specialised miners who are becoming a rarity. Hand held mining techniques (shrinkage stoping, leading stopin

    Jan 1, 1987

  • AUSIMM
    The Effect of Weak Acid Dissociable Cyanide on Gold and Silver Flotation in Hidden Valley Mine

    By Y Peng, B Guo

    In gold processing plants, the water from the cyanidation stages is treated to detoxify cyanide species and this recycle water becomes the main part of the process water. Despite the low concentration

    Sep 26, 2013

  • AUSIMM
    Modelling of the Ventilation System of a Deep Uranium Mine

    By S C. Bhowmik, R Gupta

    This paper presents the ventilation problem faced by Jaduguda uranium mine, operated up to a depth of 905 m. The first two stages of the mine workings are up to 555 m, which are nearly exhausted. The

    Jan 1, 2005

  • AUSIMM
    Coal - Paper No. 12 Coking With A Seven Cubic Foot Capacity Coke Oven

    A new test coke oven of seven cubic foot capacity is described. The oven was designed to simulate conditions in a central section of a battery oven and a special feature is the achievement of unidi

    Jan 1, 1969

  • AUSIMM
    Blast Monitoring : From Detonation to Impact

    The intention of this paper is to examine the practical and technical aspects associated with the measurement of blasting related phenomena. The emphasis is directed towards the acquisition of quan

    Jan 1, 1990

  • AUSIMM
    Dynamic Simulation in Iron Ore Pelletising Plants

    By P Navarra, R Kuhne

    Dynamic simulation (discrete event simulation) is the preferred methodology to evaluate the impact of dynamic aspects of processing plants on the overall plant capacity. This tool can be used to: iden

    Jan 1, 2009

  • AUSIMM
    The Use of Seismic Methods for the Detection of Dykes

    By Cocker J, Urosevic M

    Seismic methods have become common for the detection of low-throw faults ahead of underground coal mining. Surface seismic methods cannot theoretically be used where dykes occur, because seismic waves

    Jan 1, 1998

  • AUSIMM
    Acidic Airport Drainage, 20 Years and $20 Million Worth of Experience

    Transport Canada (Federal Government) constructed the Halifax International Airport (HIA) near Halifax, Nova Scotia, Canada in the late-1950s. Site location criteria were primarily; direct access to t

    Jan 1, 2003

  • AUSIMM
    Jacked Box Versus Cut and Cover Technique for the Pedestrian Underpass Construction in Brisbane

    By A Purwodihardjo

    Evaluation of the construction method used for the pedestrian underpass construction at Ipswich Road, Brisbane, Australia is presented in this paper. The pedestrian underpass was constructed through t

    Mar 8, 2011

  • AUSIMM
    Characterisation of Large Size Flotation Cells

    By F H. Henrfquez, A G. Oroz

    Design and operating conditions of large size mechanical flotation cells were evaluated by comparing them with actual operating conditions in a plant. The objective was to determine the time scale-up

    Jan 1, 2005

  • AUSIMM
    Innovative Approach to Open Pit Edge Protection

    By N Redwood, N Fowkes, A Bassom, S Durkin

    "It is well known that from time-to-time a vehicle will interact with a bund or windrow and often the barrier is insufficient to safely arrest that vehicle. The result of such an incident is often cat

    Nov 15, 2016

  • AUSIMM
    Recycling of Zinc-Bearing Materials: A Valuable 'Land Mine' for Zinc Smelters

    Societal influences, needs, and uses for recyclable materials are becoming increasingly important business and economic factors in the traditional natural resource companies. Several metals (such as

    Jan 1, 1993

  • AUSIMM
    Technical Note - A Test and Comment on Taylor's Rule of Mine Life

    By Schaap W

    A test on Taylor's rule of mine life using published data on open pit porphyry copper mines confirmed that mine life is, on average proportional to the fourth root of reserve tonnage. Deviations

    Jan 1, 1984

  • AUSIMM
    Brecciation, Mineralisation and Alteration of the Kidston Gold Deposit

    The Kidston breccia pipe is situated approximately 280 km west northwest of Townsville, north Queensland. It is currently Australia's largest gold producer with production varying between 8,0

    Jan 1, 1987

  • AUSIMM
    Discrete Element Modelling of Blast Fragmentation of a Mortar Cylinder

    By D Johansson, C Yi

    Blasting techniques are widely used to fragment rock masses into smaller pieces. Numerical modelling is an efficient method employed by many researchers in the blasting field. It is difficult for a co

    Aug 24, 2015

  • AUSIMM
    The Pima II: A New Technique for Field-based Alteration Mapping

    By Cocks T

    The 15-year long debate between the industry, Government and Aboriginal people about the rights and wrongs of Land Rights, the right of Aboriginal people to control development on their land and the

    Jan 1, 1994