Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Studies on the Scale-Up of Ball Mills

    By Whiten WJ, Narayanan S

    Data from ball mills of a wide range of sizes are analysed using detailed mathematical models and non-linear least squares fitting techniques. This analysis reveals that the relative power ineffici

    Jan 1, 1978

  • AUSIMM
    Investigation and Development of Pasminco No 5 Ventilation Shaft, Broken Hill

    By de Bruin J H

    A method new to Australia was used for sinking a vertical shaft at Broken Hill in the development of Pasminco Southern Operations No 5 Ventilation Shaft. The 6 m diameter shaft of 820 m depth was plan

    Jan 1, 1993

  • AUSIMM
    Realising the Potential of the Boolgeeda Iron Formation – Stratigraphy and Iron Mineralisation at McCamey’s North, Hamersley Province, Western Australia

    By P J. Howard

    Atlas Iron Limited’s McCamey’s North project lies at the eastern end of the Hamersley Basin, approximately 50 km east of Newman, Western Australia, and 3 km northeast of BHP Billiton’s Jimblebar Mine.

    Jul 11, 2011

  • AUSIMM
    Direct Reduction Technology - The Western Titanium Process for the Production of Synthetic Rutile, Ferutile, and Sponge Iron

    By Clements R. J, Davey J. M

    Development of the process from the pilot stage to the current operation of the Capel, W.A. plant is briefly described. The design criteria for a larger sized plant are discussed together with fact

    Jan 1, 1979

  • AUSIMM
    Strategic short-term geotechnical design

    By K T. Mandisodza, T J. Cartledge

    The principal objective of Geotechnical Engineers supporting operating mines is to provide safe working conditions and ensure that pit designs are geotechnically optimised to site conditions and pre-d

    Jun 22, 2022

  • AUSIMM
    Modelling of an Integrated Waste Storage Facility

    By P Edmondson, S Narendranathan, S Setchell

    The complexities of mining in current economic conditions, where ore extraction schedules are varied on a weekly basis so as to ensure constant supply to the process plant, can result in a number of s

    Jul 27, 2015

  • AUSIMM
    Challenges and opportunities in accelerating electrification of underground heavy haulage equipment

    By J Webb

    The mining industry is relatively niche and complex compared to other global industries in its safety and operating environment. Whilst some of the technology required to decarbonise the mining indust

    Mar 29, 2023

  • AUSIMM
    Mining Exploration Data, Information Theory, and Sampling Practices

    Methods for ore reserve estimation are classified. The amount of information needed to asses ore reserves is analysed. Reference is made to gold sampling. Consideration is given to nugget effects a

    Jan 1, 1997

  • AUSIMM
    Hierarchical Control Application to Flotation Columns

    By Yianatos J. B

    The advances in the study of control alternatives for flotation columns are reviewed. An integral solution to the control problem has to deal with problems associated with instrumentation, process m

    Jan 1, 1995

  • AUSIMM
    Nova copper-nickel project optimisation of the copper rougher-scavenger circuit through advanced measurement and control

    By M Thompson, N Vines, Z Hearne, S Lam, G A. Gomes-Sebastiaõ, D van der Spuy

    Construction and commissioning of the Nova Copper-Nickel project of Independence Group was completed in late 2016. The plant is in the Fraser Range of Western Australia, about 120km east of Norseman a

    Aug 29, 2018

  • AUSIMM
    Paper No. 120. Presidential Address. Reminiscence of Broken Hill.

    In taking the chair at this meeting of the Australasian Institute of Mining Engineers, I feel it my duty to thank you for the honour you have conferred upon me by electing me President for the current

    Jan 1, 1903

  • AUSIMM
    Seismic Design of Upstream-raised Tailings Storage Facilities in a Semi-arid, Low-seismicity Setting

    By D A. Williams, P J. Chapman

    Constructing upstream raises with tailings is an accepted and cost-effective practice in Western Australia, where the climatic conditions are favourable, desiccation (and hence overconsolidation) occu

    Jul 27, 2015

  • AUSIMM
    The Application of Safescape Ladders at the Cracow and Golden Grove Operations

    By B Hawkins, S Durkin, V Lawrence

    The requirement for secondary egress from underground workings has long been regulated in Australia. Escape way systems have evolved from simple airleg rising ladders and timber ladders to steel galva

    Mar 24, 2014

  • AUSIMM
    Geology - Paper No. 3 Applicaton Of Aerial Gamma Radiation Spectrometry In Australian Mineral Exploration

    In order to understand the technique, basic theoretical principles of radiation emission and in- strumentation theory are reviewed. Methods of surveying, reduction of data and interpretation are outl

    Jan 1, 1969

  • AUSIMM
    Instantaneous Outbursts of Coal and Gas

    The phenomenon of Instantaneous Outbursts, although not new to Australia, was sharply drawn to the attention of the local coal-mining industry by two isolated fatal occurrences on widely separated fie

    Jan 1, 1958

  • AUSIMM
    Design of mine workings under surface waters in New South Wales

    By Laxaminarayan Holla

    Significant coal reserves in New South Wales lie underneath major bodies of natural and stored surface waters. In order that mining can occur safely and without any adverse effect on the surface, vari

    Jan 1, 1987

  • AUSIMM
    Bulk sensing for effective ore sorting – learnings over 35 years

    By H Kurth, L Balzan

    The potential for bulk diversion was identified and quickly implemented following the development of bulk sensing technologies applied to conveyed flows. In the early 1980s real time analysis of ash i

    Nov 10, 2020

  • AUSIMM
    The Assessment of Rock Breakage and Damage in Crushing Machinery

    By Bearman R. A

    The majority of published material regarding the operation of crushing machinery is concerned with simulation of performance rather than design of equipment. The reason underlying the bias in publi

    Jan 1, 1995

  • AUSIMM
    The Lochiel Trial Pit Design and Excavation

    By Sullivan T. D

    The Lochiel Deposit is a large occurrence of soft brown coal about 130 km north of Adelaide. The deposit is undergoing continued evalua- tion of which an integral part was the excavation of a Trial P

    Jan 1, 1988

  • AUSIMM
    How to Prioritise Process Improvements

    By D J. Hill

    "Mining companies routinely invest in improvements to their processing operations, but often these enhancements do not work to full effect.Improvements can be ineffectual because underlying process pr

    Sep 1, 2014