Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Review of ISO 5802:2001 Industrial Fans - Performance Testing In Situ

    By K J. Lownie, T Rafferty

    The in situ testing of mine ventilation fan systems has been a contentious issue for many years. Site testing was generally undertaken by adapting standards that were developed for the laboratory test

    Jul 1, 2013

  • AUSIMM
    Improvement of Coal and Mineral Sizing Techniques at Nippon Steel Corporation

    Sizing is fundamental technology for each step of ironmaking process. The progress of sizing technology has greatly contributed to the development of ironmaking technology. As the purposes of ironm

    Jan 1, 1984

  • AUSIMM
    Implementation of the BIOX® process at the Runruno Gold project

    By J A. van Niekerk, J G. Jardine, J W. Olivier

    The Runruno Gold Project is located on the island of Luzon, approximately 200 miles north of Manilla in the Philippines. The mine is an open cut operation and uses the proven BIOX® and carbon-in-

    Sep 11, 2017

  • AUSIMM
    Getting underground: design and construction of a portal in a pit with moving walls

    By J Player, P Evans, G Sweby

    Achieving quick underground access after the completion of an open pit mine can be critical to maintaining project value and ensuring regular ore feed to the mill. This paper outlines the design and c

    Mar 15, 2021

  • AUSIMM
    From ‘closing a mine’ to ‘transitioning a community’ – evolving from specific post-mining land-uses to a holistic post-mining vision

    By A Maier, M Goldner, C Gimber

    Given the ongoing global crises of climate change and nature loss, with the World Economic Forum (WEF) identifying them as the top risks to global economies in terms of both likelihood and impact in t

    Aug 2, 2023

  • AUSIMM
    Accurately defining failure geometries and their variability

    By E J. Hancock, K H. B Chu

    Failures within hard rock underground excavations have historically been defined by a depth of failure, estimated in the field or through individual measurements, with a simplified failure geometry; s

    Nov 29, 2022

  • AUSIMM
    Effect of Coarse Particles in Mineral Flotation

    By Shunli Z, Jin X, Guanzhou Q

    Flotation behaviour can be controlled, due to diminishment of granula quality and extension of specific surface area, by adding coarse particles (high- grade concentrates) to condition pulp. It has

    Jan 1, 1993

  • AUSIMM
    Some Observations Regarding SAG Milling

    This paper summarises some observations regarding the way SAG and AG mills work based on the last ten years of pilot plant operation, grinding circuit design and operational reviews for various projec

    Jan 1, 2007

  • AUSIMM
    The Mufultra Sandplant

    By Russell F. M

    Following the accident in the Peterson section of Mufulira mine in September, 1970, a method had to be found of extracting up to 300 000 tonnes of ore per month from this area without inducing cavin

    Jan 1, 1973

  • AUSIMM
    Sampling the Settler of the Kalgoorlie Nickel Smelter

    By Reed M. E, Cloutt B

    Particulate samples were taken from the gas space in the settler of the Kalgoorlie nickel smelter using a vertical sampling probe and a specially designed isokinetic sampling probe which also quench

    Jan 1, 1991

  • AUSIMM
    Phanerozoic Ooidal Ironstone Deposits - Generation of Potential Exploration Targets

    By E R. Ramanaidou, M Wells

    The aim of this paper is to summarise all known Phanerozoic ooidal ironstone deposits worldwide, including Australian deposits such as the well-known channel iron deposits (CID). Nearly 400 occurrence

    Jan 1, 2009

  • AUSIMM
    Haul Truck Maintenance Procedures at Bougainville Copper Limited

    The procedure used for Truck Maintenance is described systematically in this paper. Emphasis is given to manpower required, work facilities, daily maintenance and oil sampling procedure. Scheduled

    Jan 1, 1982

  • AUSIMM
    The Flotation of Rare Earths - A Contribution to Industrial Hygiene (fd62bba4-516d-4e7e-9e0a-36823b462103)

    By Collins DN, Hollick CT

    Conventional processing of heavy mineral deposits containing radioactive rare earth minerals such as monazite and xenotime may cause industrial hygiene problems through atmospheric dust and contaminat

    Jan 1, 1990

  • AUSIMM
    Reconciliation of Orebody Model Predictions – System and People

    By T Burns, P Savory

    In 2013, Rio Tinto Iron Ore (RTIO) produced 251 Mt from 15 mines in Western Australia. Throughout the mines, Ore Reserve models are used for long-term and medium-term mine planning. Grade control data

    Aug 18, 2014

  • AUSIMM
    Open Cut Mine Machinery Automation – Going Beyond Global Navigation Satellite System with Locata

    By C Rizos

    Many of the ‘new paradigms in mining’ and notions of ‘sustainable mining’ have at their core the requirement for reliable, continuous centimetre-level positioning accuracy to enable increased automati

    Nov 22, 2011

  • AUSIMM
    A novel innovation for reconciliation

    By J R. Ruiseco, D La Rosa, L Julian, W Hunt

    The DeGrussa copper-gold deposit is located 900 km North of Perth. Copper-gold bearing massive sulfide lenses occur in lower greenschist facies meta-sedimentary and mafic volcanics of the Bryah Basin.

    Mar 22, 2022

  • AUSIMM
    Optimisation of Mines and Smelters by the Application of Improves Computing Systems

    By Quayle J. E

    This paper covers period from 1973 through to 1988 and the mines of West Coast Mines, Elur Mine, North Mine and Risdon Zinc Smelter, now all part of the Pasminco Group. During this period, optimisat

    Jan 1, 1991

  • AUSIMM
    A Decision-making Framework for Water Supply and Flood Protection Options in Net Present Value Terms

    By H J. J Boshoff, A J. Karrasch

    Mine planners frequently face the challenge of mitigating the impact of climatic events on mining operations, such as floods and droughts. Specific water management infrastructure can be implemented t

    Jun 28, 2016

  • AUSIMM
    Raisebore drill string recovery case study

    By M Andrew, D McTiffen, M Adams

    A major Ventilation Upgrade Project commenced at the Fosterville Gold Mine (FGM) in 2017 to service the ongoing ventilation requirements of the underground mining operation. The project consists of th

    Mar 15, 2021

  • AUSIMM
    Metallurgical Management Tools for Continuous Improvement

    By R Dunne, W McCallum

    Continuous improvement might be defined as seeking incremental improvement over time through improved equipment, processes, technology and the efforts of people. Most people working in ore processing

    Oct 29, 2012