Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Evaluation of the Ernest Henry Cu-Au Deposit Mineral Resources

    By A J. Ryan

    The Ernest Henry copper-gold Mineral Resource is the major asset heldby Ernest Henry Mining Pty Ltd, comprising A$6.4 billion of containedmetal. The case history presented below describing the evoluti

    Jan 1, 1998

  • AUSIMM
    New Developments in High Productivity Excavators

    By Haase W. C

    The content of this paper will identify recent developments in walking dragline technology including utilisation of planetary swing dnves, high voltage generators, unique bucket configurations and inc

    Jan 1, 1992

  • AUSIMM
    Optimisation of Complex Gold Processing Plants with Multiple Unit Operation Constraints – the Newcrest Planning Scheduler

    By D R. Seaman, R P. Tooher, B A. Seaman

    "Several mine scheduling tools exist for use in optimising and scheduling the reserve according to in situ value. These tools generally value the ore on a per block basis according to regressed recove

    Oct 10, 2016

  • AUSIMM
    Improved iron ore processing through digitalising conveyed ore flowsusing representative real time multi-elemental analysis

    By H Kurth

    High specification Prompt Gamma Neutron Activation Analysis (PGNAA) has been successfully applied to conveyed flows at iron ore operations since 2002 to representatively measure ore quality for improv

    Sep 18, 2023

  • AUSIMM
    Development of the Burra Mine Museum

    The Barra Mine was the most significant mine of Australia's earliest mining era, which took place in South Australia between 1841 and 1851, the decade prior to discovery of gold in eastern Austra

    Jan 1, 1993

  • AUSIMM
    Getting the Most out of Technology to Drive Mine Productivity Improvements

    By K Sommerville, J Parkinson

    "Open pit mines today have more technology and data available. The challenge is to effectively use resources to analyse and identify mine productivity improvements. AMC Consultants Pty Ltd (AMC) has c

    Nov 15, 2016

  • AUSIMM
    Empowering mining communities – the importance of local business hubs for skills development

    By L Mackinlay

    The Apeketon Business Hub in Lihir, Papua New Guinea, emerged in 2019 through a partnership between Australian Business Volunteers (ABV) and Lihir Gold Limited (LGL), a subsidiary of Newmont Corporati

    Sep 1, 2024

  • AUSIMM
    Sustainable production from rehabilitated coal mine pastures in southern Queensland’s Brigalow Region – Acland grazing trial results

    By J Eberhard, C Paton, J Bennett, C Baillie, A Melland, J F. Clewett, T Newsome

    A central aim of rehabilitation is to ensure that disturbed land is returned to a post-mine condition that is safe, stable and self-sustaining. This paper describes initial results from a grazing tria

    Jul 25, 2018

  • AUSIMM
    Grade engineering at Gramalote gold deposit, Colombia: an example of industry – research collaboration, Part 2

    By N Clarke, J Hunt, A Barros, N Guerrero, L Keeney

    Grade Engineering® (GE) involves a range of integrated technologies and operating protocols for improving effective feed grade through early rejection of low value material prior to costly processing

    Nov 10, 2020

  • AUSIMM
    Grade control and deleterious materials in polymetallic deposits

    By R J. Goldie

    The Monty Copper Gold Deposit is an ultra-high grade mine in Sandfire Resource’s Doolgunna region which was completely drilled out and developed within two years of commencing mine development. During

    Mar 22, 2022

  • AUSIMM
    In-pit backfilling as part of integrated life-of-mine waste scheduling, closure planning and AMD risk management – Martabe Mine as a case study

    By K Grohs, A Satriawan, S R. Pearce

    Martabe gold and silver mine is operated by PT Agincourt Resources (PTAR) and is situated in northern Sumatra and comprises several deposits in steep terrain, and in a tropical climate, that are requi

    Aug 2, 2023

  • AUSIMM
    Modelling Blast Movement for Grade Control

    By O Handayani, R Barr, E Isaaks

    The mining industry has focused a great deal of attention recently on the impact of blast movement on grade control. Although the problem of blast movement and its contribution to dilution and ore los

    Aug 18, 2014

  • AUSIMM
    Leaching Behavior of Gold in Iodide Solutions

    By Qi P. H

    Gold dissolution can be achieved with a number of complexing ligands, all with varying degrees of stability. Processes based on the use of halogens have been known for many years. Beside providing t

    Jan 1, 1991

  • AUSIMM
    Cornish Beam Engines in Early South Australian Mining

    South Australia was founded as late as 1836, forty- eight years after New South Wales, yet within five years had announced the first discovery of metals in Australia. Throughout the 1840s the mining

    Jan 1, 1987

  • AUSIMM
    Construction of the Seven Thousand Tonne per Day – Big Gossan Production Shaft

    By N Herault

    PT Freeport Indonesia recently completed preproduction development and construction of the Big Gossan underground copper and gold mine, located in the Ertsberg mining district of Papua, Indonesia. Pro

    Mar 21, 2011

  • AUSIMM
    Role of Oily Bubbles in Enhancing Bitumen Flotation

    By J Masliyah, Z Xu

    The largest oil sand deposit in the world is located in Alberta, Canada, with a total proven reserve of 2.5 trillion barrels of oil. The water based extraction process is currently being used in comme

    Jan 1, 2005

  • AUSIMM
    Benchmarking – Does it have a Role in Improving the Performance of Mining Geology?

    By M Berry

    Many mining companies routinely use benchmarking to review their operational activities and associated costs. The aim is to measure operational performance against industry norms, and identify areas w

    Aug 18, 2014

  • AUSIMM
    Automated Loading and Hauling Experiences at De Beers Finsch Mine

    By R Grobler, D Burger, L Alberts

    The current climate in the mining industry is allowing mining companies to further broaden their views and investigate technologies to improve the safety, efficiency and cost-effectiveness of their op

    Jan 1, 2008

  • AUSIMM
    The Path to Best Practice at Geita Gold Mine

    By M Monaghan, B S. Gregory

    The Geita Gold Mine is located 80 km southwest of the town of Mwanza in the north-west of Tanzania and is 100 per cent owned by AngloGold Ashanti Limited. Open pit mining commenced at Geita in 2000. I

    Sep 18, 2012

  • AUSIMM
    Should the Blast Exclusion Zone Be Based on a Qualitative or Quantitative Analysis? A Practical Implementation Conundrum

    By K Muller, T Oosthuizen

    Blast exclusion zones are instrumental in protecting equipment and personnel. When there is no constraint in footprint, the exclusion zone can be enormous, practically eliminating the hazard of flyroc

    Aug 24, 2015