Observations on the Mineral Constitution of the Broken Hill LodeThe occurence of high silver values in the oxidised zone of the main lode at Broken Hill is well known as a large factor in achieving the early fame of Broken Hill, and the minerals of this zone form
Jan 1, 1926
-
Unlocking value chain optimisation with a digital mining systemBy S Gulati, N Sarkar, T Vink, S Battersby, L Okada
This paper examines a successful project implemented by BHP Mitsubishi Alliance (BMA) and the Polymathian team at Deswik, aimed at enhancing short-term scheduling processes to reduce vessel turn times
Sep 1, 2024
-
Acid Generation Behaviour of Chalcopyrite and Pyrite Under Column Leach ConditionsBy A R. Gerson
Pyrite, chalcopyrite and mixed sulfide samples, with and without quartz (5 wt per cent S), were subjected to column leaching to mimic natural weathering (cyclic wetting and drying). The pH and SO4 2-
Jan 1, 2003
-
Elasto-Plastic Finite Element Structural Stability Analysis of Room and Pillar Mine WorkingsBy Porter I, Singh RN
An advanced elasto-plastic finite element model adopting a modified Von Mises yielding criterion was used to simulate progressive failure of the rock strata surrounding a room and pillar mine struc
Jan 1, 1992
-
An Assessment Of Swelling On Reduction Methods For Iron Ore PelletsAn assessment has been made of six reported methods for the determination of the swelling of iron ore pellets on reduction. The methods are discussed on the basis of apparatus requirements, reducti
Jan 1, 1974
-
Getting the most from existing processes: using cleverly designed experiments to optimise the line 3 AG mill at Boyne Smelters LimitedBy T G. Vizcarra, T J. Napier-Munn, A T. Karbowiak, M G. Hart
Squeezing extra performance from existing equipment (‘sweating the assets’) is key to continuous improvement initiatives, particularly during times of cost cutting where the option of spending additio
Aug 29, 2018
-
Spoil Pile Erosion Prediction - How Far Have We Advanced?By Aspinall T. O, Loch R. J, Bell L. C
Design of reshaped spoil surfaces is an important pan of rehabilitation of spoil piles resulting from open-cut coal mining. To achieve the optimum design, it is necessary to make accurate predictions
Jan 1, 1992
-
Thoeretical Analysis of the Countercurrent Gas-Solid Heat Transfer During the Drying of Brown Coal Briquettes with Circulating GasBy Sharpin PC
The countercurrent gas-solid-heat transfer during the drying of brown coal briquettes in the pilot carbonization plant at Morwell has been analysed and theoretical gas and solid temp-erature distribut
Jan 1, 1963
-
Overburden Removal Activities Associated with the Yallourn Open Cut Township FieldBy Fraser C. J
The township of Yalloum was established in 1921 to provide accommodation for the work force on the sites of the power station and open cut which were to become the basis of Victoria's electricity
Jan 1, 1992
-
Geologic Evolution of the Stringer Zone Underlying the Hellyer Volcanogenic Sulphide Deposit. TasmaniaBy Large RR
Underlying the 15 million tonne, high grade Hellyer volcanogenic massive sulphide deposit of western Tasmania is an extensive, well developed, and well preserved stringer system. Pervasive alteration
Jan 1, 1990
-
Geology - Paper No. 1 Computer-Assisted Geological MappingBy Marshall B, Gee R. D
Geological data processing by machine enables'an increased rate of coverage, better supervision and control of field programmes, increased effectiveness of field operators, and vastly improved
Jan 1, 1969
-
Pyrrhotite - The Matrix of Nickel Sulphide MineralizationThe economic significance of a fundamental understanding of the mineral pyrrhotite is dis- cussed. Particular emphasis is placed on the relationship of other sulphide minerals to the pyrrhotite whe
Jan 1, 1972
-
Making Safety Simple, Useful and EffectiveBy M E. Webb
Safety is a key value in most leading mining companies. Despite years of effort, and significant expense in ‘programs’, operating sites seem to have been left with no real improvement in either the el
Jun 22, 2016
-
A Review of Geotechnical Considerations in Narrow Vein Mining in a High Stress EnvironmentBy Dight P. M
The challenge of narrow vein mining is to produce ore with as little dilution as possible, at the least cost -commensurate with the increasing degrees of safety being demanded for mine workers by the
Jan 1, 1993
-
Universal Reconciliation – A Multidisciplinary Approach across the Entire Mining Value Chain to Identify Loss of Value and Maximise Operational PerformanceBy R Hargreaves, C Morley
The authors often see problems on mine sites that are due to insufficient feedback between technical discipline silos as the realities on the ground fail to inform the models and plans used to drive r
Aug 18, 2014
-
Characteristics and Mechanisms of Highwall Failures in Surface Coal Mines, Bowen Basin, QueenslandBy Wooltorton B
Highwall failures in surface coal mines in Queensland occur as circular slips through weak and weathered material, or as bilinear slides on sub-horizontal surfaces and steeply dipping joints. Weak
Jan 1, 1981
-
CIP ù Who Needs It? A Combination Circuit of Gravity, Flotation and Intensive Leach May Provide the Optimal Environmental and Cost Outcome for Gold Plants ù Stage II ù ResultsBy A McCallum, J Abols, G Patrick, G Johansen
The authors challenge the traditional thinking that whole ore cyanidation followed by Carbon in Pulp (CIP) or Carbon in Leach (CIL) should be applied as a standard process in the majority of gold proc
Jan 1, 2004
-
Developing the Foundation Communication Infrastructure to Support Remote and Automated Mining Initiatives in Underground MinesBy D Kent, R Paine
"Automated mining systems are increasingly being seen as a key requirement for a productive mining operation in the future. The importance of an integrated communication network infrastructure to supp
Mar 24, 2014
-
The Use of Models in Solving Support Questions in Pillar ExtractionPhysical model testing at Bergbauforschung is done in two rigs, a roadway rig and a longwall rig. The loading of such models, in scale relation to the con- ditions in the collieries provides valuable
Jan 1, 1974
-
Liberated 0 - 10 ¦m Particles From Sulfide Ores, Their Production and Separation ù Recent Developments and Future NeedsThe general types of industrial behaviour of liberated valuable sulfide minerals in the 0 - 10 ¦m size fraction are described and tests to explore on site at a concentrator the general nature of any d
Jan 1, 2005