Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Identify, Convert and Sustain – Resource Development in the Pilbara – The Rio Tinto Way

    By G Danckert

    The key technical theme of ‘orebody knowledge’ has been applied by Rio Tinto in the Pilbara iron ore precinct from 1966, when operations first started there. It forms the basis of present day applicat

    Jul 11, 2011

  • AUSIMM
    The Geology and Mineralisation of the Carina Iron Deposit, Yilgarn Mineral Field,Western Australia

    By J Lea, D C. Kettlewell

    The Carina iron ore deposit lies 105 km northeast of Southern Cross, WA. The area designated the Yilgarn Iron Ore Project (YIOP) is comprised of five prospects along an east-southeast trending greenst

    Jan 1, 2009

  • AUSIMM
    Experimental Study on Extinguishing Characteristics of Coal Fire in Confined Space

    By B Wu, B W. Lei, B J. Duan

    When a coalmine fire occurs, it is crucial to judge the developing trends inside the fire area by analysing the changes of gas concentration in order to formulate the proper rescue measures. At presen

    Aug 31, 2015

  • AUSIMM
    Consideration of asymmetric drive geometry and conditions on the loading capacity of pastefill barricades

    By M Revell, B Sainsbury, D Sainsbury

    This paper extends the existing knowledge associated with the design and placement of prefabricated pastefill barricades through a consideration of asymmetric drive geometry and conditions. The load c

    Nov 29, 2022

  • AUSIMM
    The development of optimised pulp lifter design for the Ahafo SAG mill using discrete element method modelling

    By E Asakpo, S Chaffer, A Heath

    Newmont has had continuous production at their Ahafo operations, Ghana, since 2006. In 2013, Ahafo initiated an efficiency programme to improve mill performance and reduce energy consumption. Followin

    Aug 29, 2018

  • AUSIMM
    Trials, Tribulations and Triumphs of Unmanned Aerial Vehicle Surveying at St Ives Gold Mine

    By R Steven

    "Surveying, and as a result, surveyors, have been around since the start of time, and it has been said that so has their methodology!The theodolite and tape have been the backbone of a time-tested pra

    Nov 15, 2016

  • AUSIMM
    Justifying Slope Design Risks and Costs

    By N M. Player, R P. Varden, E Jones

    "An effective geotechnical design provides an accurate and appropriate assessment, balanced with a mining company’s risk profile. Justifying the cost of slope assessment requires an understanding of t

    Nov 15, 2016

  • AUSIMM
    Investigating psychosocial incidents and gendered violence for enhanced mine safety outcomes

    By D Flint, K Vague

    The Work Health and Safety Act 2020 (WA) (WHS Act; DMIRS, 2020) and associated Work Health and Safety (Mines) Regulations 2022 (WA) (WHS Regulations; DMIRS, 2022), supporting guidance materials and ot

    Apr 16, 2024

  • AUSIMM
    Airborne contaminant monitoring strategy and technology

    By J H. J Holtzhausen

    Never has there been more focus on the health, safety, and well-being of our employees at the workplace. Ever evolving expectations of individuals, companies and clients are shaping regulatory reviews

    Oct 12, 2022

  • AUSIMM
    Fast, Safe and Fully Mechanised Installation of High-Tensile Chain-Link Mesh for Underground Support

    By V Louchnikov

    Ever increasing depth of mineral extraction presents a challenging environment for hard rock underground mines. High in situ stresses and associated seismicity with potential rock burst hazards are th

    Mar 21, 2011

  • AUSIMM
    Development and implementation of a long tendon bolting system utilising resin grouting technology

    By T Sprague, D Pateman

    "The Gosowong Gold Project is owned and operated by PT Nusa Halmahera Minerals (PT NHM), an Indonesian company 75 per cent owned by Newcrest. It is located on Halmahera Island, in the North Maluku Pro

    Oct 16, 2017

  • AUSIMM
    In Plant Sampling for Gravity Recoverable Gold - ABSTRACT ONLY

    The implementation of robust, reliable and accurate sampling systems is the key to the successful management of any mineral processing plant. The representative sampling of a mineral processing plant

    Aug 1, 2010

  • AUSIMM
    Bituminous Geomembranes in Mine Construction

    By R McIlwraith, B Breul

    "This paper discusses the successful use of bituminous geomembranes (BGMs) in mining applications since their development in 1974. It explains and illustrates the structure of a BGM composite, which i

    Jul 27, 2015

  • AUSIMM
    Case Study – Engineering Design for a Slurry Preparation Plant for a Paste Application in West Africa

    By G du Toit, P L. Gillot, M Swanepoel

    Randgold Resources’ Loulo-Gounkoto Complex is one of the largest gold mining operations in Mali, West Africa. The mine, which is situated on the western border with Senegal, treats more than 4 Mt/a of

    Sep 1, 2014

  • AUSIMM
    Application of Ground Penetrating Radar to Testing Tunnel Integrity

    By J Karlovšek

    Civil engineering infrastructures are often subjected to different types of natural and mechanical activities. These influences may result in serviceability or even in stability of structures due to m

    Mar 8, 2011

  • AUSIMM
    Mine Ventilation Model Validation - ItÆs not Rocket Science!

    By J Rowland

    "Ventilation models are invaluable tools for both prediction of routine daily ventilation changesin an operating mine to circuit performance expectations at the mine in 20 yearsÆ time. Arguably ventil

    Jun 1, 2012

  • AUSIMM
    Reconciliation – Outcomes and Expectations

    By W J. Shaw

    Mining operations must become more predictable to overcome the volatility that has characterised the mining industry. Comparisons of production against predictions will become more consistent as minin

    Aug 18, 2014

  • AUSIMM
    Geological Aspects of the Discovery of Important Minerals in Australia - Nickel Sulphide Deposits of Western Australia

    The discovery of nickel sulphide deposits at Kambalda in 1966 heralded the development of ò an industry with a capital value of over $1.5 billion producing about 10% of the western world's nick

    Jan 1, 1988

  • AUSIMM
    Waste Not, Want Not – Rethinking the Tailings and Mine Waste Issue

    By S Joyce, Z Agioutantis, D van Zyl, D Shields

    Over the past 15 years, the mining industry has begun to incorporate the concepts of sustainable development and sustainable mining practice across the life cycle of mineral operations. This requires

    Jul 27, 2015

  • AUSIMM
    Modelling Dust Plume Movement Resulting from Surface Blasting Operations

    By S Bhandari

    A model for predicting dust plume dispersion from blasting operations using the Eulerian mathematical algorithm has been developed. This model considers atmospheric stability, and wind velocity and di

    Nov 8, 2011