Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Analysing reduced conveying capability of the orepass systems in Malmberget mine

    By T Wettainen, G Shekhar, M Stromsten, B Skawina

    The aim of a transportation system in an underground mine is to move the rock masses from one location to another in the most preferable manner by minimising the long and short-term operational costs.

    Mar 15, 2021

  • AUSIMM
    The Product Quality System at Cliffs Natural Resources – Koolyanobbing Iron Ore Operations

    By A L. Wills

    Cliffs Natural Resources Pty Ltd (Cliffs) operates iron ore mines in the Koolyanobbing region of Western Australia. Ore is mined from three separate hubs and trucked to Koolyanobbing. There it is crus

    Jul 11, 2011

  • AUSIMM
    Quantifying Uncertainty in a Narrow Vein Deposit – An Example from the Augusta Au-Sb Mine in Central Victoria, Australia

    By A Fowler

    The unpredictability of the location, grade and width of narrow-vein deposits presents difficulties for mine geologists and engineers attempting to estimate, schedule, forecast and mine their deposit

    Aug 22, 2011

  • AUSIMM
    Reply to Contributed Discussion (this issue) by John Shepher and L. Keith Rixon

    By ALAN J. HARGRAVES

    It is normal that Shepherd and Rixon, in their contributed discussion (this issue) see differences with Hargraves (1983), as it exemplifies the present uncertain situation worldwide, a situation expec

    Jan 1, 1983

  • AUSIMM
    All-Flotation at North Broken Hill Limited

    IN this paper the author's intention is to convey a brief resume of the lead flotation treatment and lead flotation machines, which have replaced the May jigs and Wilfley tables at the plant of t

    Jan 1, 1930

  • AUSIMM
    Optimum Blasting? Is it Minimum Cost Per Broken Rock or Maximum Value Per Broken Rock?

    In most mining operations the ore undergoes several processes such as drilling, blasting, loading, hauling, crushing, grinding and liberation to become the final salable product. Drilling and blasting

    Jan 1, 2001

  • AUSIMM
    Development of the Primary Ventilation System at Mount Isa: I. Mining Considerations

    During the last 12 years the dominant theme at Mount Isa has been production expansion. Production rate of 3,200 tons per mine day in 1953 increased to 11,000 tons per mine day in 1960, completing the

    Jan 1, 1967

  • AUSIMM
    Ore Ageing Test Work for the Ok Tedi Skarns

    By M Morey

    Ok Tedi Mine is located eighteen kilometers from the Irian Jaya border in the Star Mountains, Western Province, Papua New Guinea. Sequential flotation concentrators produce a copper / gold concentrate

    Aug 8, 2011

  • AUSIMM
    Conveying of Paste Backfill ù Focusing on Zero Harm on the Environment at Cannington

    The BHP Billiton Cannington Mine uses paste as the principal method of backfill. The paste consists of mine tailings and cement. The pastefill process at Cannington includes a surface plant where the

    Jan 1, 2002

  • AUSIMM
    Quantification of Drill Hole Deviation – Century Mine Case Study

    By C D. Pocock

    Maintaining catch berm capacity in open pit mines through controlled blasting prevents production delays associated with managing risks associated with wall instability. A method has been developed to

    Nov 8, 2011

  • AUSIMM
    Evaporation and Salt Transport Under Variable Climatic Conditions

    By T Baumgartl, B Richards

    The association of specific plants and plant communities with soils developed over underlying superficial orebodies and mineralisation has been long recognised. It has given rise to the use of plant i

    Jul 10, 2012

  • AUSIMM
    Integrated Landforms for the Storage of Tailings and Waste Rock at Magnetite Mines in Western Australia

    By D R. Anstey

    The mining of magnetite iron ore in Western Australia will generate large volumes of waste rock and tailings over many decades. The need to dispose of these materials will result in massive waste land

    Jan 1, 2009

  • AUSIMM
    Machine learning at a gold-silver mine: a case study from the Ban Houayxai Gold-Silver Operation

    By P Stewart, S Cowie, A Offer, J Carpenter, E Jones

    The Ban Houayxai Gold-Silver Operation is a producing asset for Australian-based copper and gold producer, PanAust Limited. The Operation lies within PanAust’s 2600 square-kilometre Phu Bia Contract A

    Nov 21, 2018

  • AUSIMM
    Rock Fall Protection Barrier at Mill Area of PT Freeport Indonesia - ABSTRACT ONLY

    The mill area of PT Freeport Indonesia is located in a valley surrounded by steep natural slope, characterised by extreme topography with mountains rising to above 4500 m within 100 km from the seasho

    Nov 25, 2010

  • AUSIMM
    NO2:NOx Ratios in Australian Road Tunnels

    By P Gehrke, S O’Gorman

    The precise measurement of NO2 was historically difficult in road tunnels, hence criteria and design analysis was based on converting from NOx concentrations via a set NO2:NOx ratio. The reliable dire

    Sep 17, 2014

  • AUSIMM
    Lessons learnt in geotechnical investigation and stability analysis for upstream tailings storage facility raise design

    By C Armstrong, B Wentzinger

    Upstream embankment raises often represent the lowest cost option for increasing the capacity of tailings storage facilities (TSF), but also pose the highest stability risk due to constructing on top

    Jul 23, 2018

  • AUSIMM
    Implementation of Split to Estimate the Size Distribution of Rocks in Mining and Milling Operations

    By Kanchibolta S. S, Brunton I, Tapia-Vergara F

    The Split digital image processing system has been implemented in three Australian mines for analysing the size distribution of rocks from the images taken from muckpiles, conveyor belts and tipping

    Jan 1, 1998

  • AUSIMM
    Challenging the Norm – Alternative Excavation Method in Mining

    By R Burke, G Ramage, C Donnelly

    Over the decades, Redpath has undertaken a multitude of tunnelling and underground excavation projects for civil and mining clients both domestically and internationally. These projects have been unde

    Mar 24, 2014

  • AUSIMM
    A Fractal Approach for Mineral Breakage

    By J A. M Luz, A T. Bernardes

    HukkiÆs law is an empirical law, which does not take into account several events of energy loss during the fragmentation processes. Since experimental results are very difficult to obtain, for a large

    Sep 26, 2011

  • AUSIMM
    Fly-In, Fly-Out in the Western Australian Resources Sector û Trends in Responsible Management

    Western Australia has often been referred to as the fly-in, fly-out capital of the world. Fly-in, fly-out is a commonly used practice in Western Australia due to the geographic size and isolated locat

    Jan 1, 2008