Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Water Supply Options for the PilbaraBy K Zic, P Pickering, P Fraser
Water is a defining feature of the Pilbara. Its management was and remains vital for the pastoral industry which European settlers established when they first came to the Pilbara, and for the mining i
Jan 1, 2009
-
Survey Procedures for Urban Underground ConstructionThe advantages of coordinate geometry in design and construction of underground works are apparent for reasons of flexibility, security, computer operations, survey error analysis, and the use of n
Jan 1, 1976
-
New Technology for Refractory Gold OresThis paper reviews hydrometallurgical processing technology for refractory gold ores, which form an increasing resource stock for gold. The reasons fQr ore refractoriness and pressure, chemical and
Jan 1, 1992
-
Reliability Centered Maintenance for Mining EquipmentBy Granholm S
The current emphasis within the mining industry to reduce the cost of production has stimulated interest in the field of maintenance and operational reliability of capital intensive mining equipue
Jan 1, 1988
-
Peanuts and Tunnel Stuffing - The Brightwater Conveyance System East ContractBy M E. Trim, J J. Johnson, W Cranston
The Brightwater conveyance system is located near Seattle, Washington in the north-western United States. The East Contract portion of the system consists of a 4.3 km long, 5.9 m diameter tunnel in so
Jan 1, 2008
-
Drying Technologies for Mineral Processing ApplicationsBy T Muri
The drying operation of materials from particulate solids, through slurries and suspensions, to continuous sheets represents an important part of several processes in the chemical and mineral industri
Jan 1, 2006
-
Mechanised Tunnelling Technologies for Mining ApplicationsThe increasing global demand for rough materials forces almost every mine to look at the mechanisation in their processes. This will not onlyimprove performance but with safety issues becoming more an
Jan 1, 2008
-
Unsupervised Methods for Assessing Domain HomogeneityBy D Lawie
Prior to resource modelling, sample scale data is normally grouped into spatial domains that reflect zones of homogenous properties. These domains are usually based on a combination of grade and other
Sep 5, 2011
-
Working Capital Requirements for Resource ProjectsBy Bowra N
Working capital is best described as money that must be supplied from a company's treasury to buy inventories for raw materials and finished products and to provide credit to customers who ha
Jan 1, 1986
-
Queensland Minerals for the 21st CenturyThis paper will examine the prospects for Queensland's non-fuel mineral industries as we approach the 21st century. The opportunity for growth is unprecedented. Exploitation of recent discoveri
Jan 1, 1997
-
Drilling and Blasting for Underground SpaceBy A Robertson
Australia has been slow in adopting the use of underground space as a part of our urban planning process. Australia has one of the highest levels of tunnel advance per capita per annum in the world, y
Jan 1, 2007
-
Mineral Reserve Reporting For Government RequirementsBy Morrison J
Considerable confusion is to be found in the methods of estimating mineral reserves. The solution appears to be more cooperation between industry and government to agree upon a classification syste
Jan 1, 1979
-
The Options for Cooling Deep MinesBy Van Rensburg C S J
The options that are open to engineers for cooling mines are limited and are primarily dependent upon the thermophysical properties of coolants. These properties are carefully analysed in the cont
Jan 1, 1988
-
Approaches to Plant Design for SustainabilityIn the mining and minerals industry, development, introduction and construction of new plant designs, to meet sustainability objectives, face a series of major hurdles. Typical are the long investment
Jan 1, 2004
-
A Strategy for Mineral Industry TrainingIn order to formulate appropriate and useful education and training policies and practices, it is crucial to firstly consider the demographic environment of our workforce-and the direction in whic
Jan 1, 1986
-
The Flash-Point Test for LeadIF lead be heated with concentrated sulphuric acid two distinct actions will usually be observed. In the first, bubbles begin to be evolved more or less rapidly from the lead, and in the second, which
Jan 1, 1930
-
Pisces-a Symbol for the FutureBy King MN, Travis IC
PISCES - the Planning and Information System for Coal Export Services has been developed by Port Waratah Coal Services (PWCS) to ensure the efficient and economic operation of the Hunter Valley Co
Jan 1, 1987
-
Coking for the Australian Steel IndustryThe majority of coke in Australia is made in by-product slot ovens at steelworks in Port Kembla, Newcastle and Whyalla. Most of the coals for these plants come from New South Wales but a regular prop
Jan 1, 1975
-
Management Education for Mining Engineering UndergraduatesThis paper looks at the development in management education for engineers at the undergraduate level with particular reference to mining engineers. The management core content of the engineering d
Jan 1, 1986
-
Resource Modelling in an Evolving Mine - CSA Mine, Cobar, New South WalesBy E Haren, A Winchester
The CSA Mine has a long and varied history from initial discovery in 1871 through to the present. Lead-zinc mineralisation was mined historically near the surface. Today copper and silver are extracte
Jan 1, 2006