Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Regional Planning for the Extraction of Mineral Resources
By I Grant
On the 1 June 1978, the Town and Country Planning Act 1953 was replaced by the revised and more comprehensive Town and Country Planning Act 1977. The new act brings in some substantial changes to the
Jan 1, 1978
-
Recognition of Wall Rock Alteration Surrounding Central Victorian Gold Deposits
By E House, V Lisitsin
Recent whole-rock geochemical data from nearly 900 fresh drill core and underground samples taken from seven central Victorian gold deposits confirm the presence of distinct and identifiable primary a
Jan 1, 2008
-
Magnetic Methods in the Search for Iron Ore
Magnetic methods have for a long time been used in the search for iron ore. In fact the first recorded geophysical prospecting was the use of a magnetic compass to locate iron ore in the Kuruna region
Jan 1, 1951
-
Stabilization Methods For The Reclamation Of Tailing Ponds
By Bilbrey J. H
Land utitized duxting the past 45 yeans by the mining industty in the United States con all puxpos ez to tal4 neatly 4 million sexes. Ob this axes, 13 pexeent is used bon dL4posal ob bLne -sized
Jan 1, 1976
-
Production Scheduling Optimisation in a Nickel Laterite Deposit:MIP and LP Applications and Infeasibility in the Presence of Orebody Variability
By R Dimitrakopoulos
Optimisation and mathematical formulations for open pit design and long-term production scheduling have been available since the 1960s. There are two main concerns in the application of existing mixed
Jan 1, 2003
-
The Consultant Contribution to Major Australasian Mining and Mineral Processing Projects
The last decade has seen a dramatic change in the. size and complexity of mining and mineral processing projects in Austral- asia. Major projects of today are vastly different from major projects of
Jan 1, 1975
-
Physical and Chemical Evolution of Placer Gold Deposits During Rise of Antiformal Ranges, Central Otago, New Zealand
By D Craw
Quaternary warping and uplift of antiformal schist ranges in Central Otago, New Zealand, has resulted in recycling of alluvial gold from widespread, generally weakly auriferous, Miocene fluvial gravel
Jan 1, 1995
-
Gold Exploration in Australia How Long Will The Honeymoon Last?
The Australian gold industry has in recent years experienced a tremendous growth period, though not to levels prevailing at the turn of the century. There are, however, a number of dynamic factors at
Jan 1, 1986
-
Exploration and Development History of the Batman Gold Deposit, Mt Todd Project, Northern Territory
The Mt Todd Project is located 42 km northwest of Katherine in the Northern Territory. The identified mineral resource estimate for the Batman gold deposit is 66.7 million tonnes (Mt) grading 1.4 gr
Jan 1, 1994
-
Optimisaiton in the Resources Industry : A Financial Perpective
Management at all levels continually strive to optimise, or make the most of resources available to them. Daily, decisions are being made on how to most efficiently locate and exploit an ore body, t
Jan 1, 1991
-
Perspectives and initiatives for the future of mining
By O J. Restrepo Baena, S Nowosad, R Webber-Youngman, N Mojtabai, P Foster, A Binder, S Hazuria, erson, S Raval, L Liu
As the mining industry faces times of change, new challenges arise to ensure raw material supply for the younger and future generations. Different scenarios are currently shaping the way we mine and t
Sep 1, 2024
-
Exposing Uncertainty in Schedules for Proactive Stockpile Planning
By C Standing, R Lacourt Rodrigues, C Q
The value of iron ore depends on the grade of the contaminants. Scheduled iron, and the associated contaminants, provides mine planners with a measure of stockpile feed and blending requirements. Blen
Jan 1, 2005
-
Underground Infrastructure Requirements for Underground Cave Mining Operations
By A G. L Pratt, G F. Dunstan, A Leonforte
The selection of the material sizing and mine dewatering systems are important elements in the development of a large-scale, high tonnage (greater than 4 Mt/a) underground hard rock mine. The sizing s
Jan 1, 2008
-
Prominent Hill Concentrator - Designed for Operators and Maintainers
By G Yeowart, P D. Munro
The Prominent Hill copper-gold concentrator of OZ Minerals Limited in South Australia was built in 2008 and commenced commercial production in early 2009. It has a design ore throughput of eight milli
Jan 1, 2009
-
Planning for Large Scale Bulk Port Development Projects
This paper discusses design concepts in planning a large modern bulk terminal. The need is emphasised for a studied master plan, in-built materials handling flexibility and staged development. An
Jan 1, 1983
-
AMIRA - Successful R & D for the Mineral Industry
The Australian Mineral Industries Research Association, set up by the mineral industry in 1959, acts as a research and development broker and manager for the industry. In 1984/85 it contracted out
Jan 1, 1986
-
Properties of Commercial Iron Oxides for COREX Process
By V Sahajwalla, S Shin
Research activities to classify the quality of iron oxides have a long history but most of such activities are for the existing processes such as blast furnace or DR plant. Therefore the newly develop
Jan 1, 2000
-
Feasibility Study for a Silicon Industry in Southland
By D S. Nicholson, T Marshall
Reserves of high-grade quartz gravel, lignite and timber suitable for the production of silicon metal and ferrosilicon on large scale occur within 40 miles of Bluff Harbour. Undeveloped hydroelectric
Jan 1, 1971
-
Characterising the Mining Environment for Underground Mass Mining
The purposes of defining the mining environment for underground mass mining and the uses of characterisation data are outlined. The requirements for data in the areas of geology, surface and groundwat
Jan 1, 2000
-
Benchmarks of Performance for Truck and Loader Fleets
The cost of production from truck and loader fleets is influenced by management development of the culture of the organisation, work practices, systems and procedures of the production and maintenance
Jan 1, 1992