Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Some Aspects of Industrial Safety in British Columbia

    By W. K. A. Congreve

    Introduction Less than a hundred years ago the engineer was able to do his job without concern for the science that underlay his practices or for the men who operated his machines. But toward the e

    Jan 1, 1948

  • CIM
    The Use of Aurix®100 Resin for the Selective Recovery of Gold and Silver from Copper, Gold and Silver Solutions

    By Tim Hughes, A. H. (Sandy) Gray, Jennifer Abols

    "The selective recovery of gold and silver from solutions containing other metals such as copper is possible using AuRIX®100 resin in conjunction with the Gekko Resin Column. Selectivity is driven by

    Jan 1, 2006

  • CIM
    Graphical-Analytical Model of the Generation of Methods and Variants of Methods of Digging, respectively of the Technologies and Technological Variants of the Execution of the Underground Mining Work

    By Nicolae Dobritoiu

    The literature in this field and the practical activity record that a method, respectively the technology used for an underground mining work have many components which, in order to be applied, demand

    Oct 1, 2009

  • CIM
    Developing Solutions to Complex Flotation Problems

    By B. K. Gorain

    "Mining of low grade deposits along with the necessity to design and operate flotation plants with high throughput presents unique metallurgical and environmental challenges that need to be addressed

    Jan 1, 2013

  • CIM
    Mocca: A Grinding Circuit Control Application

    By C. Larsen, D. Fragomeni, A. Vien, D. G. Fisher

    "MOCCA is a Multivariable Optimal Constrained Control Algorithm developed specifically for non-square industrial control applications with practical difficulties such as interactions, time delays, con

    Jan 1, 1991

  • CIM
    Reducing maintenance costs through predictive fault detection

    By Y. Faitakis

    In the mining industry, maintenance is a key priority and a major expense. As mining equipment is large in scale, high in cost, and difficult to tow, it is key to maintain equipment on a timely basis.

    Jan 1, 2004

  • CIM
    Reducing maintenance costs through predictive fault detection (c13d7cbc-4e81-4449-b672-3dadc240a5a9)

    By Y. Faitakis, G. J. Powley, C. Mackenzie

    "In the mining industry, maintenance is a key priority and a major expense. As mining equipment is large in scale, high in cost, and difficult to tow, it is key to maintain equipment on a timely basis

    Jan 1, 2004

  • CIM
    Capturing unrealized capacity

    By M. W. Lewis, B. Sambirsky, J. Werner

    A mine’s inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. The inh

    Jan 1, 2004

  • CIM
    Mineral Process Plant Monitoring at Greens Creek: By Looking at the Minerals Themselves

    By R. Haecker, S. Bajic, R. Thorpe, A. Palko, M. Kalstrom

    "Historically, mineral processors have used inferential data like plant instrumentation, assays, and grind sizes to monitor the performance of their plants. The ability to monitor the minerals themsel

    Jan 1, 2014

  • CIM
    Contributing to Community Sustainability during Mineral Exploration: Lessons Learned From Mesoamerica (CIM Journal | Vol. 6, No. 2)

    By J. M. Ríos

    "Without conscious effort and understanding, a number of factors unique to mineral exploration often hinder building sustainability in host communities. These include the episodic and transitory prese

    Jan 1, 2015

  • CIM
    Processing of Refractory Sulphides at Mantos de Oro, Chile

    By John G. Peacey, Leoncio Sevilla G., Ford. Kevan J. R., Erling Villalobos C.

    "Kinross Gold Corporation’s Mantos de Oro (MDO) gold/silver mine in northern Chile currently processes 15,000 tpd of oxide ores through a mill, whole ore cyanide leach plant followed by a Merrill-Crow

    Jan 1, 2009

  • CIM
    Simulating the Iron (III) Precipitation Rate during Medium Temperature Chalcopyrite Oxidation in Batch and Continuous Autoclaves

    By J. D. T. Steyl

    "This paper presents a phenomenological model of the rate of iron(III) precipitation in batch and continuous autoclaves at medium temperature operating conditions. The rate expressions are based on in

    Jan 1, 2012

  • CIM
    Selection and Training of Mining Operators at Barrick Veladero; Strategic Factor for Mining Sustainability

    By Zetti Gavelán

    Lack of skilled workforce in mining industry during the current decade has been a serious concern for most mining organization globally. At the beginning of this decade the major envisioned difficulty

    May 1, 2010

  • CIM
    Evaluation of the Tower Mill as Regrind Machine

    By J. M. Menacho, J. M. Reyes

    "Batch and continuous regrind tests were conducted in 3 kW and 15 kW tower mill units, respectively. Single particle size classes of a chilean copper sulphide concentrate were employed in the batch te

    Jan 1, 1989

  • CIM
    Chemical Additives for Improving the Wet Grinding of Ores

    By R. Samuels, R. Klimpel

    "IntroductionLaboratory and industrial grinding tests have shown that the process of size reduction of metal containing ores can be significantly influenced by chemicals added to the slurry being grou

    Jan 1, 1979

  • CIM
    Application of a Model-Based Predictive Controller on a Vacuum Heat-Exchange Network for the Bayer Process

    By Yannis Faitakis, Simon Bergeron

    "This paper describes the implementation of model-based predictive control (MPC) on a vacuum heat exchange network at Alcan's Jonquière Complex. The plant produces alumina from bauxite ore using the B

    Jan 1, 2003

  • CIM
    Improved Production Forecasting through Geometallurgical Modeling at Iron Ore Company of Canada

    By Dave Bulled, Jim Thompson, Tim Leriche, Mark Blake, Troy Wilkie

    "A commitment to a core testing, plant modeling and reconciling technique has shown substantial economic benefits to IOC in terms of accurate production forecasting, smoother operation of the mill, im

    Jan 1, 2009

  • CIM
    Capturing unrealized capacity

    By M. W. Lewis

    A mine's inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. Th

    Jan 1, 2004

  • CIM
    A Geometallurgical Approach to Flotation Process Design Using Optimised Grade-Recovery Curves

    By D. Hatfield

    "Flotation plants typically aim to maximise recovery at or above a target grade. As the ore from the mine varies, operators increase or decrease the mass pull in different flotation banks by adjusting

    Jan 1, 2013

  • CIM
    An Expert System Supervisor of a Flotation Circuit

    By A. L. Mular, R. P. Edwards

    "The operation of flotation circuits is often regarded as a combination of art and science. Expert systems offer a method by which the art may be captured and supervisory control of flotation circuits

    Jan 1, 1991