Mocca: A Grinding Circuit Control ApplicationBy C. Larsen, D. Fragomeni, A. Vien, D. G. Fisher
"MOCCA is a Multivariable Optimal Constrained Control Algorithm developed specifically for non-square industrial control applications with practical difficulties such as interactions, time delays, con
Jan 1, 1991
-
The Use of Aurix®100 Resin for the Selective Recovery of Gold and Silver from Copper, Gold and Silver SolutionsBy Tim Hughes, A. H. (Sandy) Gray, Jennifer Abols
"The selective recovery of gold and silver from solutions containing other metals such as copper is possible using AuRIX®100 resin in conjunction with the Gekko Resin Column. Selectivity is driven by
Jan 1, 2006
-
Reducing maintenance costs through predictive fault detectionBy Y. Faitakis
In the mining industry, maintenance is a key priority and a major expense. As mining equipment is large in scale, high in cost, and difficult to tow, it is key to maintain equipment on a timely basis.
Jan 1, 2004
-
Reducing maintenance costs through predictive fault detection (c13d7cbc-4e81-4449-b672-3dadc240a5a9)By Y. Faitakis, G. J. Powley, C. Mackenzie
"In the mining industry, maintenance is a key priority and a major expense. As mining equipment is large in scale, high in cost, and difficult to tow, it is key to maintain equipment on a timely basis
Jan 1, 2004
-
Developing Solutions to Complex Flotation ProblemsBy B. K. Gorain
"Mining of low grade deposits along with the necessity to design and operate flotation plants with high throughput presents unique metallurgical and environmental challenges that need to be addressed
Jan 1, 2013
-
Capturing unrealized capacityBy M. W. Lewis, B. Sambirsky, J. Werner
A mine’s inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. The inh
Jan 1, 2004
-
Mineral Process Plant Monitoring at Greens Creek: By Looking at the Minerals ThemselvesBy R. Haecker, S. Bajic, R. Thorpe, A. Palko, M. Kalstrom
"Historically, mineral processors have used inferential data like plant instrumentation, assays, and grind sizes to monitor the performance of their plants. The ability to monitor the minerals themsel
Jan 1, 2014
-
Processing of Refractory Sulphides at Mantos de Oro, ChileBy John G. Peacey, Leoncio Sevilla G., Ford. Kevan J. R., Erling Villalobos C.
"Kinross Gold Corporation’s Mantos de Oro (MDO) gold/silver mine in northern Chile currently processes 15,000 tpd of oxide ores through a mill, whole ore cyanide leach plant followed by a Merrill-Crow
Jan 1, 2009
-
Selection and Training of Mining Operators at Barrick Veladero; Strategic Factor for Mining SustainabilityBy Zetti Gavelán
Lack of skilled workforce in mining industry during the current decade has been a serious concern for most mining organization globally. At the beginning of this decade the major envisioned difficulty
May 1, 2010
-
Evaluation of the Tower Mill as Regrind MachineBy J. M. Menacho, J. M. Reyes
"Batch and continuous regrind tests were conducted in 3 kW and 15 kW tower mill units, respectively. Single particle size classes of a chilean copper sulphide concentrate were employed in the batch te
Jan 1, 1989
-
Chemical Additives for Improving the Wet Grinding of OresBy R. Samuels, R. Klimpel
"IntroductionLaboratory and industrial grinding tests have shown that the process of size reduction of metal containing ores can be significantly influenced by chemicals added to the slurry being grou
Jan 1, 1979
-
Application of a Model-Based Predictive Controller on a Vacuum Heat-Exchange Network for the Bayer ProcessBy Yannis Faitakis, Simon Bergeron
"This paper describes the implementation of model-based predictive control (MPC) on a vacuum heat exchange network at Alcan's Jonquière Complex. The plant produces alumina from bauxite ore using the B
Jan 1, 2003
-
Tungsten Carbide Drilling at the Sullivan MineBy J. W. Reynolds
Introduction The Sullivan mine, at Kimberley, B.C., is the principal source of ore for the Consolidated Mining and Smelting Company of Canada, Limited. Current production amounts to about 2,500,000 t
Jan 1, 1951
-
Improved Production Forecasting through Geometallurgical Modeling at Iron Ore Company of CanadaBy Dave Bulled, Jim Thompson, Tim Leriche, Mark Blake, Troy Wilkie
"A commitment to a core testing, plant modeling and reconciling technique has shown substantial economic benefits to IOC in terms of accurate production forecasting, smoother operation of the mill, im
Jan 1, 2009
-
Sustainability in Plant DesignBy Ben C. McLellan, Philip J. Bangerter, Andrew Murphy, Glen D. Corder, Damien Giurco
Sustainability now forms a critical part of metallurgical plant design. In addition to compliance with requirements and corporate principles, design engineers must also consider how community and soci
Jan 1, 2015
-
Capturing unrealized capacityBy M. W. Lewis
A mine's inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. Th
Jan 1, 2004
-
An Expert System Supervisor of a Flotation CircuitBy A. L. Mular, R. P. Edwards
"The operation of flotation circuits is often regarded as a combination of art and science. Expert systems offer a method by which the art may be captured and supervisory control of flotation circuits
Jan 1, 1991
-
Bibliography of Canadian Contributions in the Field of Rock MechanicsBy F. L. Casey
"Part 1 – Published Papers Baria, G., and Boshkov, S., ""Insights into Undercuttingin Block Caving"", Proc. 5th Rock Mech. Symp.,Mines Br. - Information Canada, 41-58, 1970.Barron, K., Coates, D. F.,
Jan 1, 1971
-
A Geometallurgical Approach to Flotation Process Design Using Optimised Grade-Recovery CurvesBy D. Hatfield
"Flotation plants typically aim to maximise recovery at or above a target grade. As the ore from the mine varies, operators increase or decrease the mass pull in different flotation banks by adjusting
Jan 1, 2013
-
Pilot-Scale Frother Testing at Highland Valley CopperBy S. D. D. Welsby
"A pilot-scale flotation column was used to evaluate four polyglycol frothers at Teck’s Highland Valley Copper Mine. The column was fed with flotation plant feed from the grinding circuit cyclone over