Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Errington and Vermilion Lake Mines

    By William C. Martin

    "Consolidated Sudbury Basin Mines Limited owns two mines, 4 miles apart, near the southwest end of Sudbury Basin. The Errington mine lies close to the north boundary of Creighton Township and about 18

    Jan 1, 1949

  • CIM
    Les Mines Selbaie Story Underground mining

    By Yve Fourmanoit

    "This paper discusses the exploitation of shallow underground deposits in a very altered geological environment. The methods, their adaptation to local conditions, their evolution, dilution control an

    Jan 1, 1990

  • CIM
    Genetic Model and Exploration Guidelines for Kaolin Beneath Unconformities in the Lower Cretaceous Fluvial Chaswood Formation, Nova Scotia

    By D. J. W. Piper, T. Hundert, G. Pe-Piper

    "Abstract - Potentially commercial deposits of kaolin are found in the fluvial Lower Cretaceous Chaswood Formation, the sedimentologically proximal equivalent of deltaic sediments of the offshore Scot

    Jan 1, 2006

  • CIM
    Integration of Uncertain Real-Time Logistics Data for Reactive Scheduling Using Fuzzy Set Theory

    By K. Szczesny

    This paper considers the integration of uncertain real-time logistics data for reactive construction scheduling. In order to manage a construction project efficiently, an accurate schedule representin

    Aug 1, 2013

  • CIM
    Protection of Magnesium Alloys by Keronite Plasma Electrolytic Oxidation

    By S. Shrestha

    Magnesium-based alloys are of growing interest for many industrial applications due to their favourable strength-to-weight ratio and excellent castability. Mass reduction has advantages in many indust

    Jan 1, 2006

  • CIM
    Reprocessing Of Historic Tailings from the Aunor Mine in Timmins

    By M. A. Tomlinson, A. Di Feo, T. C. Cheng

    "Goldcorp is evaluating the potential for economic reprocessing of historic tailings at several sites, including the Aunor A facility located in Timmins. The overall project is investigating the abili

    Jan 1, 2019

  • CIM
    Mining - What it Means to Canada

    By John L. Bonus

    "WITHIN THE BROAD PARAMETERS implied by the title of my speech, I propose to deal more particularly this evening with a subject the many aspects of which have constituted the essential elements of one

    Jan 1, 1971

  • CIM
    Radium In Mining Effluents: Promising Water Treatment And Environmental Monitoring

    By J. Schick, V. Granger

    Nowadays, all French former uranium mining sites are remediated and redeveloped. If needed, mining waters containing radium have to be treated before discharged into the environment. Classical radium

    Jan 1, 2020

  • CIM
    Resisting wear attack in oil sands mining and processing

    By R. Llewellyn

    "Wear damage is responsible for very high maintenance costs and significant production losses in the oil sands industry of northern Alberta.It affects all areas of operations and involves a panoply of

    Jan 1, 1997

  • CIM
    Diesel generators: electrical considerations for equipment selection and operation

    By F. Hampshire

    "IntroductionThis paper is intended to cover questions raised by operating staff at various installations and is not intended to give comprehensive coverage of power plant and power system design. The

    Jan 1, 1986

  • CIM
    Mapping by the Bureau of Geology and Topography (c5632fc6-fe7a-48bf-a0c3-ceb17c4f4de0)

    By K. G. Chipman

    IN 1936, the Department of Mines and Resources was formed by the amalgamation of the former Departments of Mines, Interior, Indian Affairs, and Immigration. In the amalgamation, the Geological Survey

    Jan 1, 1944

  • CIM
    Mining Data in a Longwall Coal Mine: An Integration of Rock Mechanics & Data Mining to Predict Intersection Stability

    By P. R. La Pointe, J. Clark

    "Studies have shown that the roof in coal mines is nearly twice as likely to fail at intersections as at entries due to enlarged roof spans, stress redistribution and other factors. However, the relat

    Jan 1, 2015

  • CIM
    Deformation Behavior of AZ and AE Cast Magnesium Alloys at High Strain Rate Loading

    By H. Asgari, A. G. Odeshi, J. A. Szpunar

    In the present study, the dynamic response of AZ and AE cast magnesium alloys to shock loading, are compared for strain rates ranging between 900 and 1200 s-1. Texture measurements showed that after s

    Jan 1, 2014

  • CIM
    Design of Extra-Large Coal Preparation Plant in China

    By Minghui Li

    China is the largest coal producer in the world. In 2012, the coal production in China is 3.65billion tonnes, accounting for approximately 49% of global coal production. The raw coal production in 201

    Aug 1, 2013

  • CIM
    Progress in the control of underground diesel emissions

    By A. Lawson

    "Continued and expanded use of underground diesel-powered equipment is considered desirable in order to achieve necessary production capability, particularly when coal becomes increasingly in demand a

    Jan 1, 1981

  • CIM
    Seeking Consensus ? How Many Samples and What Testwork is Required for a Low Risk SAG Circuit Design

    In Canada and other countries, legislation dealing with accurate factual disclosure for mining projects is being expanded to include more metallurgical design information. Grinding characteristics, me

    Jan 1, 2012

  • CIM
    Tailings Disposal of No. 12 and No. 6 Concentrators at Brunswick Mining and Smelting Corporation Limited

    By G. W. Neumann

    "In order to avoid pollution of water in Flemming Brook and Little River, which drain the area in which the Brunswick No. 12 Mine and Concentrator are located, the company has gone to considerable exp

    Jan 1, 1969

  • CIM
    Adsorption of Neodymium (III) by Silicate-Alginate Composite Beads Containing 2-Ethylhexyl Phosphonic Acid Mono-2-Ethylhexyl Ester

    By H. Z. Liu, J. M. Zhao, F. C. Wang

    "Novel silicate-alginate composite beads containing 2-ethylhexyl phosphonic acid mono-2- ethylhexyl ester (P507) were synthesized and applied for the adsorption of Nd3+ from aqueous solutions. The ads

    Jan 1, 2012

  • CIM
    Administration Building Miners? Change-Rooms and General Offices of the McIntyre Porcupine Mines, Limited

    By Angus D. Campbell

    Introduction In the Twentieth Annual Report of the Mcintyre Porcupine Mines, Limited, for the year ending March 31st, 1932, the General Manager, Mr. R. J. Ennis, said: "During the period under revie

    Jan 1, 1933

  • CIM
    Generating Station Coal Quality

    By D. A. Pirttinen

    The promotion of improved coal quality for thermal generation can benefit our national economy. The construction of electric generating facilities in Canada is expanding at a rapid rate to satisfy the

    Jan 1, 1961