Pilot-Scale Industrial Microwave-IR Sorting of Porphyry Copper OresBy C. Dodds, R. S. Ferrari-John, The University of Nottingham, G. Dimitrakis, J. Katrib, A. R. Batchelor
"Sorting technologies have the potential to reduce energy use in comminution by rejecting uneconomic ore before feed material enters the mill. However, a major challenge for sorting porphyry copper or
Jan 1, 2016
-
Rapid Development in Canada: Myth or Reality? An Underground Mining Contractor’s PerspectiveBy P. Hickey, G. Hubert, P. Healy
"J. S. Redpath Limited, an underground contractor with a worldwide presence, has implemented innovative techniques in various projects in Canada to shorten the development cycle. Conventional methods
Jan 1, 2016
-
Oil and Gas in Southwestern OntarioBy W. A. Roliff
The renewed interest of the past few years in the Appalachian and Michigan oil provinces has not, as yet, created any marked increase in activity in Southwestern Ontario. During 1960 development drill
Jan 1, 1961
-
Anode Furnace Off-Gas NOX Emissions Improvements at Rio Tinto KennecottBy Arsenio Enriquez, Adrian Deneys, Ryan Walton, Jenny Esker
NOx emissions at the Rio-Tinto Kennecott Copper (RTKC) smelter, near Salt Lake City, Utah, are regulated to a compliance emission limit at the Main Stack of 15.9 kg/hr on an annual rolling average. Th
Jan 1, 2019
-
Hydraulic Pilot-Plant Hoisting and the Investigation of the Pipeline Transport of Crushed MagnetiteBy P. Kostuik
"Recent interest in the pipeline transport of solid mate-als has been sparked by the idea that, in an inflationary onomy, pipeline costs are more stable than the costs of any other transport systems.
Jan 1, 1966
-
BLASTCAD - Noranda's three-dimensional computer-aided underground blast design systemBy P. Favreau
"This paper describes the progress accomplished at the Noranda Technology Centre in the field of three-dimensional computer-aided underground blast design. Traditional methods of laying out undergroun
Jan 1, 1993
-
Corrosion Behavior of Sintered NdFeB Permanent MagnetsBy K. S. Raja, B. Pesic, S. Kshetri
"We investigated the electrochemical corrosion behavior of commercial permanent magnetic material (NdFeB alloy) in 0.1 M NaH2PO4 solution (pH:4.75) containing 0 – 1000 ppm of chloride at room temperat
Jan 1, 2012
-
Pinchi Lake Mercury Reduction PlantBy R. Bainbridge
THE cinnabar deposits of the Consolidated Mining and Smelting Company's Pinchi Lake property, situated near Fort St. James, B.C., were discovered and reported on by a Dominion Government geologic
Jan 1, 1945
-
Portraying Geological Structure of Canadian CoalfieldsBy B. R. MacKay
Introduction Of all Canada's mineral resources, its coal deposits have probably received the most continued attention by the Geological Survey since its inception ninety years ago. A casual revi
Jan 1, 1932
-
Canada Fluorspar (NL) Inc. St. Lawrence Fluorspar Project – Project DescriptionBy M. A. Stogran-Baker, S. Cole
"Fluorspar mining occurred in the St. Lawrence area from the 1930s until the mid 1980s. In 2013, CFI discovered a new ore body, the AGS vein, which proved amenable to more economic open pit mining met
Jan 1, 2018
-
Raglan project optimization and economicsBy T. F. Pugsley, D. Gignac
"The historical background to the project dates back to the mid-30s with the discovery of surface sulphide showings in the Cape Smith-Wakeham Bay ultramafic belt. In the mid1950s, orderly exploration
Jan 1, 1996
-
Increasing Anode Thickness to Optimise Copper Production at the Kidd Metallurgical SiteBy M. R. Coffin
In recent years, improved operation of the Kidd smelter has resulted in an increase in blister production capacity. Due to manpower and equipment limitations anode production and treatment rates could
Jan 1, 2007
-
Noise -Its Effect and Control in Mining OperationsBy A Walker
The presence of high noise levels in many industries, together with the fact that countries are becoming increasingly concerned with the health of its citizens, has contributed to the importance of th
Jan 1, 1963
-
Mine 2-4D vs MineschedThe 2-4D window shown above is the base startup window which allows you to begin a new project. ??Setting up the project is the first step ??The next step is to setup the properties to be used in th
Feb 1, 2008
-
Elements de Reflexion sur le Comportement Mecanique des Zones de Faille Dans un Modele 3D dem pour la Stimulation Hydraulique des Puits dans les Reservoirs GeothermiquesBy Arnold Blaisonneau, Théophile Guillon, Xavier Rachez, Sylvie Gentier
"L’étude présentée ici vise à étudier l’influence, lors de stimulation hydraulique de puits dans les réservoirs géothermiques de type Enhanced Geothermal System (EGS), du comportement mécanique des zo
Jan 1, 2015
-
Analysis of Potential Failure Mechanisms during the Construction of a Rockfill Dyke on a Submerged Tailings BeachBy Edouard Masengo
A long dyke will be constructed in a lake with rockfill placed by end dumping method. Its crest will be at elevation 521.5 m compared to the nominal lake level at 520 m. In the first portion, its heig
May 1, 2003
-
Microseismic monitoring at Falconbridge Mine, Falconbridge, OntarioBy G. R. Davidge
"Falconbridge Mine has a history of significant microseismic activity dating back to 1955. Since mid-1981, a microseismic monitoring system has been operating in the area around the No .9 Shaft hoist
Jan 1, 1984
-
Measurement of Oxygen Transfer Rate with an EKATO Gassing Agitator in a 5 M3 Pressure VesselBy J. Ji
Oxygen requirement during acidic pressure oxidation of sulphide concentrates can he as high as 800 kg/(m3.h) in the first compartment of an autoclave when the total oxidation residence time is shorten
Jan 1, 2004
-
Summary of Investigation into Mechanical Loading, Transportation, etc., in Great Britain, Germany, and Holland, 1947By L. Frost
Physical Conditions Great Britain The physical conditions in the mines investigated in Great Britain are similar to those found in the mines of the Dominion Steel and Coal Corporation, with the
Jan 1, 1948
-
Nutrien Allan Potash Shaft Concrete Liner RemediationBy D. R. Murray
"In 2017, Nutrien Allan Potash remediated a portion of the concrete liner in the production shaft. A set of underslung work platforms and collection boxes were used in conjunction with hydraulic split