Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Pilot-Scale Industrial Microwave-IR Sorting of Porphyry Copper Ores

    By C. Dodds, R. S. Ferrari-John, The University of Nottingham, G. Dimitrakis, J. Katrib, A. R. Batchelor

    "Sorting technologies have the potential to reduce energy use in comminution by rejecting uneconomic ore before feed material enters the mill. However, a major challenge for sorting porphyry copper or

    Jan 1, 2016

  • CIM
    Rapid Development in Canada: Myth or Reality? An Underground Mining Contractor’s Perspective

    By P. Hickey, G. Hubert, P. Healy

    "J. S. Redpath Limited, an underground contractor with a worldwide presence, has implemented innovative techniques in various projects in Canada to shorten the development cycle. Conventional methods

    Jan 1, 2016

  • CIM
    Oil and Gas in Southwestern Ontario

    By W. A. Roliff

    The renewed interest of the past few years in the Appalachian and Michigan oil provinces has not, as yet, created any marked increase in activity in Southwestern Ontario. During 1960 development drill

    Jan 1, 1961

  • CIM
    Anode Furnace Off-Gas NOX Emissions Improvements at Rio Tinto Kennecott

    By Arsenio Enriquez, Adrian Deneys, Ryan Walton, Jenny Esker

    NOx emissions at the Rio-Tinto Kennecott Copper (RTKC) smelter, near Salt Lake City, Utah, are regulated to a compliance emission limit at the Main Stack of 15.9 kg/hr on an annual rolling average. Th

    Jan 1, 2019

  • CIM
    Hydraulic Pilot-Plant Hoisting and the Investigation of the Pipeline Transport of Crushed Magnetite

    By P. Kostuik

    "Recent interest in the pipeline transport of solid mate-als has been sparked by the idea that, in an inflationary onomy, pipeline costs are more stable than the costs of any other transport systems.

    Jan 1, 1966

  • CIM
    BLASTCAD - Noranda's three-dimensional computer-aided underground blast design system

    By P. Favreau

    "This paper describes the progress accomplished at the Noranda Technology Centre in the field of three-dimensional computer-aided underground blast design. Traditional methods of laying out undergroun

    Jan 1, 1993

  • CIM
    Corrosion Behavior of Sintered NdFeB Permanent Magnets

    By K. S. Raja, B. Pesic, S. Kshetri

    "We investigated the electrochemical corrosion behavior of commercial permanent magnetic material (NdFeB alloy) in 0.1 M NaH2PO4 solution (pH:4.75) containing 0 – 1000 ppm of chloride at room temperat

    Jan 1, 2012

  • CIM
    Pinchi Lake Mercury Reduction Plant

    By R. Bainbridge

    THE cinnabar deposits of the Consolidated Mining and Smelting Company's Pinchi Lake property, situated near Fort St. James, B.C., were discovered and reported on by a Dominion Government geologic

    Jan 1, 1945

  • CIM
    Portraying Geological Structure of Canadian Coalfields

    By B. R. MacKay

    Introduction Of all Canada's mineral resources, its coal deposits have probably received the most continued attention by the Geological Survey since its inception ninety years ago. A casual revi

    Jan 1, 1932

  • CIM
    Canada Fluorspar (NL) Inc. St. Lawrence Fluorspar Project – Project Description

    By M. A. Stogran-Baker, S. Cole

    "Fluorspar mining occurred in the St. Lawrence area from the 1930s until the mid 1980s. In 2013, CFI discovered a new ore body, the AGS vein, which proved amenable to more economic open pit mining met

    Jan 1, 2018

  • CIM
    Raglan project optimization and economics

    By T. F. Pugsley, D. Gignac

    "The historical background to the project dates back to the mid-30s with the discovery of surface sulphide showings in the Cape Smith-Wakeham Bay ultramafic belt. In the mid1950s, orderly exploration

    Jan 1, 1996

  • CIM
    Increasing Anode Thickness to Optimise Copper Production at the Kidd Metallurgical Site

    By M. R. Coffin

    In recent years, improved operation of the Kidd smelter has resulted in an increase in blister production capacity. Due to manpower and equipment limitations anode production and treatment rates could

    Jan 1, 2007

  • CIM
    Noise -Its Effect and Control in Mining Operations

    By A Walker

    The presence of high noise levels in many industries, together with the fact that countries are becoming increasingly concerned with the health of its citizens, has contributed to the importance of th

    Jan 1, 1963

  • CIM
    Mine 2-4D vs Minesched

    The 2-4D window shown above is the base startup window which allows you to begin a new project. ??Setting up the project is the first step ??The next step is to setup the properties to be used in th

    Feb 1, 2008

  • CIM
    Elements de Reflexion sur le Comportement Mecanique des Zones de Faille Dans un Modele 3D dem pour la Stimulation Hydraulique des Puits dans les Reservoirs Geothermiques

    By Arnold Blaisonneau, Théophile Guillon, Xavier Rachez, Sylvie Gentier

    "L’étude présentée ici vise à étudier l’influence, lors de stimulation hydraulique de puits dans les réservoirs géothermiques de type Enhanced Geothermal System (EGS), du comportement mécanique des zo

    Jan 1, 2015

  • CIM
    Analysis of Potential Failure Mechanisms during the Construction of a Rockfill Dyke on a Submerged Tailings Beach

    By Edouard Masengo

    A long dyke will be constructed in a lake with rockfill placed by end dumping method. Its crest will be at elevation 521.5 m compared to the nominal lake level at 520 m. In the first portion, its heig

    May 1, 2003

  • CIM
    Microseismic monitoring at Falconbridge Mine, Falconbridge, Ontario

    By G. R. Davidge

    "Falconbridge Mine has a history of significant microseismic activity dating back to 1955. Since mid-1981, a microseismic monitoring system has been operating in the area around the No .9 Shaft hoist

    Jan 1, 1984

  • CIM
    Measurement of Oxygen Transfer Rate with an EKATO Gassing Agitator in a 5 M3 Pressure Vessel

    By J. Ji

    Oxygen requirement during acidic pressure oxidation of sulphide concentrates can he as high as 800 kg/(m3.h) in the first compartment of an autoclave when the total oxidation residence time is shorten

    Jan 1, 2004

  • CIM
    Summary of Investigation into Mechanical Loading, Transportation, etc., in Great Britain, Germany, and Holland, 1947

    By L. Frost

    Physical Conditions Great Britain The physical conditions in the mines investigated in Great Britain are similar to those found in the mines of the Dominion Steel and Coal Corporation, with the

    Jan 1, 1948

  • CIM
    Nutrien Allan Potash Shaft Concrete Liner Remediation

    By D. R. Murray

    "In 2017, Nutrien Allan Potash remediated a portion of the concrete liner in the production shaft. A set of underslung work platforms and collection boxes were used in conjunction with hydraulic split

    Jan 1, 2019