Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Murrin Murrin CCD1 Rake Mechanism Modification: the Decision and the Result (cec1ce81-ec33-4e69-ab4a-ed843ba61e4f)By B. Hewitt
Murrin Murrin Operations has not had a successful beginning. Numerous reliability and operability issues many of which are the result of design decisions have been addressed through mechanical and ope
Jan 1, 2004
-
Engineering techniques to optimize an Arctic mineBy Alan E. Renshaw
"This paper is a practical overview of ways to reduce cost in the design and operation of an Arctic mine. The economically important issues of the Arctic mine that will be addressed include: permafros
Jan 1, 1996
-
Aspects of Sustainability Following Closure of the Steep Rock Iron Mines, OntarioBy Victor A. Sowa
"Abstract - In 1938, a body of goethite and hematite was discovered beneath Steep Rock Lake near Atikokan, northwestern Ontario. This was at the time the largest and richest undeveloped iron ore body
Jan 1, 2003
-
Migration of Exchangeable Rare Earth and Aluminum in Leaching Process of Weathered Crust Elution-Deposited Rare Earth OreBy Ruan Chi, Zhenyue Zhang, Zhengyan He
In order to understand what governs the leaching of exchangeable rare earth (RE) and impurities and enhance the RE leaching process, the effects of the concentration of ammonium sulfate, pH and leachi
Jan 1, 2016
-
Coke breeze addition to Fire Lake pellets in regular operationBy C. Desmeules
"Carbon addition in the oxide pelletizing process is a big concern at the Sidbec-Normines pelletizing plant since 1976.Laboratory pot-grate testing carried out before the initial start-up of the Port-
Jan 1, 1983
-
Emergency Plan Methodology for Mine Fire Simulations in Chuquicamata Underground MineBy J. E. Carrasco, J. D. Stinnette, R. A. Alvarez
"Chuquicamata Underground Mine is one of the main projects for the Chilean government copper company (CODELCO). Underground mine project has been under construction since 2013 and presents a solution
Jan 1, 2019
-
Troubleshooting Lonmin Rom Mill Treating Ores Produced by Two Mining Methods (ff932186-0b59-41f9-83e2-8d971c0ed7ba)By E. V. Manlapig, U. Erol, V. Ross, K. Tshimanga
Lonmin RoM ball mills are treating two types of feed ore produced by conventional mining and mechanised mining methods. It was reported that reduction in mill throughput was observed when treating the
Jan 1, 2012
-
Study on the Fabrication Process of Advanced Radiation Resistant Oxide Dispersion Strengthened Steel TubeBy Gae On Kim, Ki Baik Kim, Suk Hoon Kang, Tae Kyu Kim, Sanghoon Noh
"Advanced radiation resistant oxide dispersion strengthened steel (ARROS) is being developed as a fuel cladding tube material for future nuclear reactor system applications. The research activities co
Jan 1, 2017
-
A Study on Extraction Rate of Lanthanides with Microcapsules Containing Extractant P507By Jianhong Xu, Hailong Hou, Yu Jing, Yundong Wang
Microcapsules containing extractants have been applied to the extraction of metal ions, organic acid, pesticide, and herbicide. The difficulties of conventional liquid-liquid extraction in phase mixin
Jan 1, 2014
-
Age of Mineralization and Post-Ore Hydrothermal Alteration at Copper Mountain, B.C.By W. H. White, A. J. Sinclair
"Unaltered biotites from three samples of monzonite and gabbro from the Copper Mountain stock and a single sample from a pegmatic biotite-chalcopyrite vein cutting the Triassic Wolf Creek formation ha
Jan 1, 1968
-
Deep-well dewatering at Gibraltar MinesBy T. L. Carpenter
"The presence of excessive water in the Gibraltar East Stage 1 pit initiated studies into the ground-water conditions that might be expected in mining the Granite Lake and Pollyanna pits. Hydrologic i
Jan 1, 1980
-
Cost Control at LamaqueBy W. Zieman
"The low consumption of reagents can probably be attributed to a good clean type of ore. The cyanide level is kept at 0. 8 lb/ ton of solution and the lime at 1. 8 to 1.9 lb per ton of solution (pH 12
Jan 1, 1964
-
Aspects of Wear in Mill Circuit PumpsBy C. I. Walker
Field tests at a number of large mineral processing operations have been undertaken to better understand the wear life impact of different aspects of pump design, materials of construction and mainten
Jan 1, 2012
-
Mining REDD+ for a Green Economy - Good business, climate stabilization, shareholder value, and reducing riskIn-Country Business Development Agenda ?Siting/Permitting/Operational Planning ?Securing, maintaining, enhancing social license to operate ?Biodiversity conservation and ecosystem services ?IF
Aug 1, 2013
-
Operational Strategy At Chagres Smelter, Maximizing Installed CapacityBy R. Bonifaz
The Chagres Smelter, part of the Anglo American plc group situated 80 Km north of Santiago in Chile, completed a series of operational improvement in 2005 resulting in an optimum capacity in its opera
Jan 1, 2007
-
Arsenic in Pyrometallurgical OperationsBy J. N. Cram
"The comments given are to help allay generally accepted ideas that the handling of arsenic as arsenic-trioxide (As2o3J in and from off gas pyrometallurgical operation fumes is difficult, hazardous an
Jan 1, 1979
-
Everybody Needs Us Nobody Wants UsBy Ray Collier
MINING TODAY l EXTENSIVE AND EXPENSIVE PERMITTING PROCESSES WITH UNKNOWN RESULTS l GENERAL AND IMPASSIONED RESISTANCE TO RESOURCE BASED INDUSTRY l SOPHISTICATED, ORGANISED, AND WELL FUNDED OPPOS
May 1, 2002
-
Iron Ore Company of Canada: Greenhouse gas reduction efforts in the current regulatory environmentBy J. Farrell
The Canadian government ratified the Kyoto Protocol in December 2002 and, prior to ratification, committed to equitable distribution of the burden of implementation. The Federal government's Larg
Jan 1, 2004
-
Evaluation of Copper Losses Using Flow Patterns in the Cl-Furnace of the Mitsubishi ProcessBy H. Sakurai, M. Kato, F. Tanaka
The Mitsubishi Continuous Copper Smelting/Converting Process employs an electric furnace (CL- furnace) for settling the slag/matte mixture formed in the smelting furnace. The conditions in the CL- fur
Jan 1, 2019
-
LIFAC - economical solution to SO2 controlBy D. W. Smith, J. J. Koskinen, T. A. Enwald, M. E. Ball
"A full-scale demonstration unit of Tampella's LIFAC desulphurization process was tested at SaskPower's Poplar River Power Station Unit No. I. The test program included a series of parametri
Jan 1, 1993