Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    New Initiatives in Swedish Mining Research and Development

    By Göran Bäckblom

    The Swedish mining companies LKAB and Boliden, the equipment supplier Atlas Copco, the general contractor NCC and the specialist company Reflex joined forces in 2005 to advance the field of rock techn

    May 1, 2006

  • CIM
    A Comparison of Roasting Technologies for Arsenic Removal from Copper Concentrates

    By C. H. Lee, K. Adham, D. Lemieux, J. P. Mai, A. M. S. Hussein, S. Francey

    Copper concentrates contain an increasing amount of arsenic, as the older sources of cleaner ores are depleted. At the same time, the market-determined price penalties on arsenic rich concentrates are

    Jan 1, 2019

  • CIM
    Advances in Precious Metal Trace Element Analyses for Deportment using LAM-ICP-MS

    By Paul J. Sylvester, Yeonuk Choi, Mike Nelson, Louis J. Cabri, Mike Tubrett

    "The development and characterization of sulphide standards containing as many as seven precious metals has increased the efficiency and comprehensiveness of micro-analyses for deportment studies usin

    Jan 1, 2010

  • CIM
    The Impact of Coastal and Marine Mines on Seabed Biological Resources: Engineering Needs for Sustainable Recovery and for Use of the Resources after Mining Ceases.

    By Derek V. Ellis

    Coastal and marine mines affect the seabed?s biological resources, eg fisheries, when large volume wastes such as tailings are placed on the seabed, and by the extraction processes from marine mining.

    May 1, 2002

  • CIM
    The Effect of Choke Feeding a Gyratory Crusher on Throughput and Product Size

    By Dave Rose, Jacques McMullen

    "The Detour Lake mine is located 200 km northeast of Timmins, Ontario, Canada.The mill processes a free milling gold ore using both a gravity circuit and leaching with a state-of-the-art carbon-in-pul

    Jan 1, 2017

  • CIM
    Bumps in No. 2 Mine, Springhill, Nova Scotia (6b22a26e-d82e-4ce9-8c21-9da88f205566)

    By Walter Herd

    For the past eight years, No. 2 mine of the Cumberland Railway & Coal Co., Springhill-a subsidiary of the Dominion Coal Co., Ltd.-has had an unenviable reputation for bumps. As the workings extended i

    Jan 1, 1929

  • CIM
    Dragline monitoring, control, and navigation

    By J. Hansen

    "ABSTRACTThe paper addresses the application of automated monitoring, control, and navigation to improve dragline performance. SummaryImproving dragline performance in the Canadian coal mines is criti

    Jan 1, 2000

  • CIM
    Circuit Modifications at Westmin Resources Myra Falls Operations

    By C. Veloo

    "Westmin Resources operates a mine/mill complex at Myra Falls and produces copper and zinc concentrates with minor associations of gold, silver, and lead from a polymetallic, massive sulphide orebody.

    Jan 1, 1992

  • CIM
    Social and Economic Aspects of Reducing Mercury Pollution in Artisanal Gold Mining

    By Simon D. Handelsman

    ?Artisanalmining ?Application of human energy (e.g. pick & shovel) directly to produce minerals ?majority no technical skills and lack adequate working tools ?Small-scale mining ?Application of mo

    May 1, 2006

  • CIM
    Mechanical Properties of a Composite Backfill Material

    By Alfred Annor

    Deep mining requires innovative approaches in ground control technology and the search for new ground support materials including backfill. There is a need to look at mine waste materials that may be

    May 1, 2003

  • CIM
    Combining Dynamic Logistics Simulation with Process Modeling to Support Capacity Expansion Studies: Experience at ArcelorMittal Mines Canada Pellet Plant

    By Jean-Pierre Côté, Alexandre Noiseux

    "Hatch and ArcelorMittal Mines Canada have combined their expertise to develop a dynamic model of the latter’s Iron Ore Pellet Plant in Quebec, Canada. This model was used to predict the benefits of d

    Jan 1, 2010

  • CIM
    Stope Sequence Optimization for Narrow Vein, Long Term Mine Planning

    By André van Wageningen

    Long term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    Oct 1, 2004

  • CIM
    Probabilistic practical optimization of production scheduling for multi-element deposits

    Optimizing production scheduling in open pit mines is important for managing cash flows of mining operations. This paper describes a new, probabilistic, mixed integer programming (MIP) formulation whi

    Jan 1, 2006

  • CIM
    SPOC Project Software and Manual

    By R. F. Pilgrim

    "This first chapter of the SPOC Manual 1s intended as a general introduction to all the other chapters in which the mineral process evaluation and optimization methodology is presented. This chapter a

    Jan 1, 1986

  • CIM
    The Princess Colliery Man-Rake Rope

    By Gordon S. Farnham

    THIS paper summarizes the results of investigations carried out at Sydney Mines, N.S., and at Ottawa, following the disaster at Princess colliery, December 6th, 1938. The Honourable Minister of Mines

    Jan 1, 1939

  • CIM
    Rock Strength Characterization for Excavations in Brittle Failing Rock

    By B. H. Kim

    It is hypothesized that the standard approach adopted to characterize the ground and to determine the rock strength properties at depth are flawed and generally tend to underestimate the rock strength

    May 1, 2009

  • CIM
    Tyrethane for Screening Fabrication

    By S. L. Aaroe

    "TYRETHANE PRODUCTSTyrethane® is the family brand name which has been adopted by The W. S. Tyler Company of Canada, Limited to identify its polyurethane products. Since we have been manufacturing Wove

    Jan 1, 1976

  • CIM
    Improving Silica Dust Controls for Metal/Nonmetal Mining Operations in the United States

    By Jay F. Colinet

    Researchers at the Pittsburgh Research Laboratory (PRL) of the National Institute for Occupational Safety and Health (NIOSH) work to reduce respirable dust exposures in mining operations. One focus o

    May 1, 2007

  • CIM
    Reverse Osmosis Desalination Plant at the Bougrine Zinc-Lead Mine, Tunisia

    By Ammar Henchiri, Godfrey McDonald

    "Breakwater Tunisia S.A.’s Bougrine mine is located in a semi-arid region of Tunisia characterized with Triassic salt domes. Due to extensive agricultural land-use in the mine area, a zero-discharge t

    Jan 1, 2003

  • CIM
    Grinding Circuit Final Grind Control at Agnico Eagle Meadowbank Mine

    By Pathies Nawej Muteb, Tom Strombotne, Karl Leetmaa, Irma Gabric, Keith Darby

    "Continuous control of the final grinding product size is important to optimize gold liberation for Gold Milling operations. At Meadowbank Mine an on-line Particle Size Monitor has been employed succe

    Jan 1, 2017