Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Toppling failure — A proposed analytic solution

    By J. I. Mathis

    "The failure that was utilized for developing this model was a double bench-scale failure, approximately 20 m in height, in the Misery pit at BHP Billiton’s EKATI mine site. The bench that failed was

    Jan 1, 2004

  • CIM
    Safe Rapid Drifting - Support Selection

    By Fidelis T. Suorineni

    Rapid drifting enables quicker access to orebodies, higher production rates and a resultant reduction in production cost. The Mining Innovation, Rehabilitation and Applied Research Corporation (MIRARC

    May 1, 2004

  • CIM
    Automating Delay Reporting to Deliver Effective Maintenance

    By Shaun Booth

    Automating Delay Reporting to Deliver Effective Maintenance Corporate Background: Technology Company: Matrikon Inc. Global software and service provider of Information Technology and Control Solut

    May 1, 2003

  • CIM
    Case Studies on Circuit Design Using Flotation Columns

    By Glenn S. Dobby, Glenn A. Kosick

    "Column flotation circuit engineering has matured to a good level of understanding regarding testing, scale-up and design. Some of the factors important to the process of implementing columns are addr

    Jan 1, 1995

  • CIM
    Perspectives on the scientific and engineering principles underlying flow of mineral pastes

    By Michael Li, Arie Moerman

    "Paste backfill as a means of supporting underground mining is gaining popularity. Despite this trend, engineering and design of mine paste backfill systems are still largely based on empirical method

    Jan 1, 2002

  • CIM
    Model-based control of column flotation: Toward industrial application and real-time optimization

    By André Desbiens, Jocelyn Bouchard, René del Villar

    "The metallurgical performance of the column flotation process is determined by the concentrate grade and recovery. Although the former can be continuously measured using an on-stream analyzer, the la

    Jan 1, 2003

  • CIM
    Requirements for Underground Mine Backfill Monitoring

    By David O. DeGagné

    While mine backfill plants are becoming increasingly more automated and instrumented, especially with paste fill operations, underground backfill distribution systems have hardly changed over the year

    May 1, 2001

  • CIM
    Newcrest’s Industry First Application of Eriez Hydrofloattm Technology for Copper Recovery from Tailings at Cadia Valley Operations

    By L. Vollert

    In August 2018, the first full-scale HydroFloatTM cells for the recovery of coarse composited copper and gold were commissioned at Newcrest’s Cadia Valley operation in New South Wales, Australia. The

    Jan 1, 2019

  • CIM
    Environmental consequences of the placement of radium-barium sludge in tailings areas

    By K. L. Murphy, G. Multamaki, P. M. Huck

    "A preliminary evaluation, based on existing data, has been made of the implications of placing radium-barium sludge in tailings areas. The study was restricted to a consideration of possible increase

    Jan 1, 1982

  • CIM
    Supergene Mineralization at the Kori Kollo Gold Mine, Bolivia

    By C. M. Clapperton, K. E. Darke, A. J. Boyce, C. M. Rice, S. D. Redwood

    "Abstract - The Kori Kollo gold deposit is hosted by a c.15 Ma sericitized dacite stock in the La Joya district on the Bolivian Altiplano. The mineralization is of the Bolivian polymetallic vein (BPV)

    Jan 1, 1997

  • CIM
    Supergene Mineralization at the Kori Kollo Gold Mine, Bolivia (5a50eab3-2567-48d0-8c87-7819113638f7)

    By C. M. Clapperton, K. E. Darke, A. J. Boyce, C. M. Rice, S. D. Redwood

    "The Kori Kollo gold deposit is hosted by a c.15 Ma sericitized dacite stock in the LaJoya district on the Bolivian Altiplano. The mineralization is of the Bolivian polymetallic vein(BPV) type, with a

    Jan 1, 1997

  • CIM
    Beneficiation of Marine Sands from Les Iles-De-La-Madeleine

    By Alain Dorval

    "''Purification of marine sands from Les Iles-de-la-Madeleine''This paper presents the results of the work that has been done at CRM pilot plant for «Les Silices du Golfe Inc.». Essentially the purpos

    Jan 1, 1994

  • CIM
    Stepped Frequency GPR Field Trials for Determining the Ideal Frequency Bandwidth for Use in Potash Mines

    By W. Greg Maybee

    Separations, which form along stratigraphic boundaries in the roofs of potash mines, pose a serious safety concern. If these separations go undetected they can lead to falls of ground. The current met

    May 1, 2004

  • CIM
    Modeling extrusion of alumina and silicon carbide reinforced aluminum metal matrix composites

    By A. Saigal

    A finite element analysis based investigation using DEFORM software was undertaken to model the extrusion of 15% alumina and 15% silicon carbide reinforced aluminum metal matrix composites. The study

    Jan 1, 2004

  • CIM
    From the Ground up ? Aber - 2005 Charting its own Unique Course in Response to its Unique Position ? Mining Rocks

    By Robert Gannicott

    ??A mining company without the burden of operating a mine ??Management focused on marketing a high-quality, run-of-mine range of Canadian diamonds ??Robust revenue stream ??Specialist diamond know

    Apr 1, 2005

  • CIM
    Determination of Metal and Mineral Flotation Performance at one of Falconbridge’s Base Metal Operations

    By Dominic Fragomeni, Tony DiFeo, Martyn P. Hay

    "As part of an investigation into flotation modelling of industrial scale operations, Falconbridge Ltd organised a “blind” test of the SUPASIM flotation model developed by Eurus Mineral Consultants (E

    Jan 1, 2006

  • CIM
    Environmental Control Design at Shebandowan Mines

    By T. Peters, W. C. Ferguson

    "Shebandowan is about 600 miles west of Sudbury and 50 miles west of Thunderbay close to the trans Canada highway. Shebandowan Lake is about 38 miles long. The ore body is located between No. 1 and No

    Jan 1, 1975

  • CIM
    MLA: The New Sherlock Holmes of the Mining and Metallurgical Engineering Industry

    By Paul Miranda, Corby Anderson

    "The Center for Advanced Mineral and Metallurgical Processing (CAMP) has recently obtained a Mineral Liberation Analyzer (MLA). CAMP has utilized the technology for several projects with excellent res

    Jan 1, 2007

  • CIM
    Reducing Miners? Exposure to Diesel Particulate Matter Using Real-time Measurement

    By Michel G. Grenier

    Compliance with Diesel Particulate Matter (DPM) exposure regulation is currently performed using timeweighted average (TWA) sampling on underground mine workers. These samples are collected in the spa

    May 1, 2010

  • CIM
    Water Problems in the Cape Breton Coal Mining Districts

    By J. L. Bowlby

    Introduction In the following discussion, boiler-feed and mine waters will be considered from the point of view of the problems arising from the chemical nature of the mineral and gaseous impurities

    Jan 1, 1934