Search Documents
Search Again
Search Again
Refine Search
Refine Search
- 
                    
                Convergent Bitumen RecoveryBy Lee Nichols
Convergent Bitumen Recovery Context of discussion It should be noted that the CBR process is a conceptual bitumen recovery feed methodology, designed to provide supplemental bitumen to the oil sand
May 1, 2007
 - 
                    
                Syncrude’s tailings management practices from research to implementationBy B. R. List, E. R. F. Lord
The Syncrude open pit mine, located near Fort McMurray in northeastern Alberta, produces approximately 410 000 tonnes of oil sand feed daily, which, after undergoing a bitumen extraction phase, genera
Jan 1, 1997
 - 
                    
                Mining taxes and social policyBy Robert B. Parsons
"Exploration and development of mineral resources in developing countries by Canadian-based multinational mining companies is becoming increasingly common. One problem being encountered is that the ob
Jan 1, 1991
 - 
                    
                Mine Planning Efficiency: A Quest for ImprovementBy Alan D. Curtis
A standard planning block model for Phelps Dodge North America Operations has been developed to improve mine planning efficiency and performance in a skill starved environment. The model saves time on
May 1, 2007
 - 
                    
                The Boseto Copper ProjectBy Brad Sampson
Project Ownership ?Discovery Metals Limited ?ASX (DML), BSX (DML), AIM (DME) ?Market Cap AUD 195M ?Key assets ?Boseto Cu ?Dikoloti Ni The Boseto Copper Project ?Location ?Setting ?History
May 1, 2010
 - 
                    
                Case histories in tile use of Pulse EM from surface and boreholes as an aid in the detection and definition of deep ore depositsBy J. Duncan Crone
"A test surface Pulse EM(PEM) survey over a plunging massive sulphide lens, located in the Snow Lake area of Manitoba, has shown that it is possible to detect the body to a depth of 300 metres. Anothe
Jan 1, 1985
 - 
                    
                Z1600 Jameson Cell Test Rig – From Rental to RevenueBy A. Taylor, M. Blanchette, J. Doucet
"A Z1600 Jameson Cell Test Rig was rented for test work at Vale’s Clarabelle Mill operation. This paper discusses the evolution of renting the unit for test purposes to owning the unit and operating i
Jan 1, 2012
 - 
                    
                Development of a spontaneous heating liability index of coal from kinetic parametersBy H. B. Sahu, N. M. Mishra, D. C. Panigrahi
The paper presents the development of a spontaneous heating liability index (SHLI) of coal based on a mathematical approach. The parameters for the calculation of this index have been determined by di
Jan 1, 2008
 - 
                    
                The Use of Design of Experimentation Software in Laboratory Testing and Plant OptimizationBy Corby G. Anderson
"Laboratory testing, plant optimization, and the interpretation and application of metallurgical technologies can be tedious, time consuming and costly. This paper outlines the use of proven statistic
Jan 1, 2006
 - 
                    
                Investigation of Filiform Corrosion on Painted 6000-Series Aluminum AlloysBy N. Hosking, M. Nichols
Aluminum alloys are increasingly used for automotive body construction but are susceptible to filiform corrosion or paint blistering in service. Filiform corrosion resistance of two 6000-series alumin
Jan 1, 2015
 - 
                    
                Application of expert systems for peak power managementBy Y. L. Su, S. Vongpaisal, H. A. Smith
"It is extremely difficult for a mine's central control room operator to control peakpower demands and to maintain normal materials handling operations at the same time. An investigation of the F
Jan 1, 1993
 - 
                    
                The Grande Cache Coal projectBy P. Cain, B. Martens
"Grande Cache Coal (GCC), an investor-owned Alberta company, is in the final stages of the regulatory process leading to the resumption of coal mining in the Smoky River Coal Field of Alberta. Althoug
Jan 1, 2002
 - 
                    
                Escondida – Phase IV Grinding CircuitBy Walter S. Bergholz, Michael L. Schreder
"Since Escondida began operations in fiscal 1991, a series of aggressive expansion projects have enabled market share to be increased and ever larger profits to be realized. This was possible due to t
Jan 1, 2004
 - 
                    
                The Fundamental Relationship Between Sample Mass and Sampling Variance in Real Geological Samples and Corresponding Statistical Models"In mineral exploration and mining applications, it is sometimes necessary to reduce sampling error in order to improve representivity of individual sample assays. Historic efforts to reduce sampling
Jan 1, 2007
 - 
                    
                Process Design and Change Management for Successful Deployment of Technology in MiningBy Laura Mottola
Process Design and Change Management for Successful Deployment of Technology in Mining Over the last 30 years Canada has been successful in developing but not deploying hardrockmining automation.
May 1, 2010
 - 
                    
                Multiscale Characterisation of Environmentally Assisted Cracking in Al-Zn-Mg-Cu Aluminium AlloysBy J. Fellowes, V. Landais, J. Robson, J. Carr
"Aerospace Al-Zn-Mg-Cu (7xxx) alloys are known to be susceptible to environmentally assisted cracking (EAC). This phenomenon has been studied intensively for many decades, leading to empirically adopt
Jan 1, 2018
 - 
                    
                The Use of Coal in Pyrometallurgical Processes in Western Areas of Canada and the United StatesBy J. C. Bothan
A program to provide technical in-formation on the use of fuels in pyro-metallurgical processes, from the Canadian fuel viewpoint, was initiated about five years ago by a Canadian Institute of Mining
Jan 1, 1963
 - 
                    
                Welcome to NewfoundlandBy Robert B. Parsons
"The Canadian mining industry is not off to a good start in the 1993/94 budget season. Of the five provinces and territories to table budgets as of March 31, 1993, the industry's scorecard shows:
Jan 1, 1993
 - 
                    
                Recycling of Spent Auto-Catalyst Using Akaline Roasting Followed by Sulfuric Acid DissolutionBy S. k. Kim, H. B. Trinh, R. R. Srivastava
"Spent auto-catalyst is a promising secondary resource of platinum group metals (PGMs), which are being extensively used in automobiles catalytic converters to control the hazardous gaseous emissions
Jan 1, 2017
 - 
                    
                Concentrate Grade and Regrind Size Improvement on the East Pit Hypogene Ore at Kemess MineBy E. Roman, M. Brissette
"For its end of life, Kemess Mine processed its difficult-to-treat hypogene ore from the east pit, which is a lower grade copper and higher pyrite content gold ore. Metallurgical testwork showed that
Jan 1, 2012