Heating And Cooling Structures With Steel Pile Foundations Closed Loop Standing Column Well Technology
By Paul Suver
The closed loop standing column well (CLSCW) system uses a closed circuit of water to develop the same thermal heat exchange characteristics that are achieved from traditional open circuit standing co
-
Session 7: Grouting Compaction Grouting For Sinkhole Repair at WAC Bennett Dam
By James Warner
Investigations of the sinkhole indicated that the loose, disturbed ground was completely encircled by dense competent core. This confinement substantially increased the effectiveness of the compaction
Feb 10, 2003
-
DEEP FOUNDATIONS INSTITUTE 45th ANNUAL CONFERENCE ON DEEP FOUNDATIONS
By Sebastian Lobo-Guerrero
Welcome to DFI45! our first on-line annual meeting. We cannot deny the severe impacts that the COVID19 pandemic is having in our industry and our lives. We extend our support to all of our members tha
Oct 27, 2020
-
Open Cell Sheet Pile® Dock In Remote Alaska Provides Innovative And Cost-Effective Solution
By Dempsey S. Thieman
Innovative marine bulkhead design and construction techniques were used in the fast-track design and construction of a high-capacity, deep-water dock in the highly seismic region of Alaska?s Aleutian
Jan 1, 2008
-
Reliability Assessment of the Capacity of Single Pile Subjected to Vertical Loading
By Rajarshi Pramanik, Nirjhar Dhang, Dilip K. Baidya
"This paper performs the reliability evaluation of pile foundation under vertical loading condition using the concept of fuzzy set theory. The uncertain parameters are expressed as fuzzy numbers. Mont
Jan 1, 2015
-
2D And 3D Ansys Modeling For Deep Excavation And Evaluation Of Soil-Structure Interaction
By Yahia M. Al-Smadi
Effect of lateral loading against existing sheet pile wall and distribution of gravity loading due to various number of construction loading scenarios were studied. The objective of this effort was t
Jan 1, 2010
-
-
A Field Study to Analyze Pile Setup Behavior and Comparison of Pile Capacity Methods from CPT
By Md. Nafiul Haque, Murad Y. Abu-Farsakh, Chris Nickel
"This paper presents the results from a pile load testing program for a bridge construction project in Louisiana. The testing includes two 54-inch open-ended spun cast concrete cylinder piles (OECP),
Jan 1, 2017
-
Retaining Wall Installation Beneath An Existing Structure
By Kenton W. Braun
Concourse B at the Anchorage, Alaska International Airport is currently being renovated while retaining the original building structure and foundations. Part of the renovation includes the installati
Jan 1, 2008
-
Design And Construction Of Shear Pins For Landslide Stabilization
By Fei-chiu Huang
A 17-acre landslide occurred in February 2001, on a slope below Via Bellota in the City of San Clemente, California. Three homes were destroyed and many others placed in jeopardy. The landslide, inv
Jan 1, 2010
-
Risk Management For Dam Rehabilitation Projects
By Dave Paul
Dam rehabilitation involves a range of design, construction, and operation risks, some of which are not encountered in new dam construction. These risks can have significant impact on project schedule
-
Risk Management Techniques to Avoid Litigation
By Kevin Cunningham
"Litigation resulting from neighboring structures with settlement and/or lateral movement or improper pile design and faulty soils engineering analysis, are a multi-faceted opportunity for law firms.
Jan 1, 2015
-
Design of the Lift-in Dam at Olmsted on the Ohio River
By Dale E. Berner
A new navigation dam at Olmsted on the Ohio River will be built "in-the-wet" using a lift-in construction method by the Washington Group/Alberici Joint Venture for the U.S. Army Corps of Engineers, Lo
May 11, 2007
-
Corroboration and Remediation Options
"After the non-destructive testing is completed, the data must be compiled, evaluated, and interpreted. During this process, the data may indicate that there is an anomaly warranting further investiga
Jan 1, 2004
-
Bridge Pier Remediation, New London CT
By Walter Kaeck
In a recent upgrade of their system, Amtrak converted a bascule type draw bridge over the Thames River to a vertical lift structure supported by the existing piers. During the bridge replacement, sign
Jan 1, 2009
-
Evaluation Of Ultimate Resistance Of Steel-Concrete Composite Drilled Shafts Through Static Loading Tests
By Moonkyung Chung
Static pile load tests were performed in order to evaluate bearing capacities and mechanical behaviors of three different pile types: (1) steel-concrete composite drilled shaft with rebar reinforcemen
Jan 1, 2010
-
Comprehensive QA/QC Integrity Testing Using Thermal Integrity Profiler
By Brad W. Taylor
"During the past several months, I have introduced to civil and structural engineers an innovative solution for the integrity testing of concrete using the Thermal Integrity Profiler (TIP) Wire Cable
Jan 1, 2017
-
Installing And Testing Multi-bar High Capacity Rock Tiedowns
By Andrew Pontecorvo, Steven Lowe, David Sposito
Buildings with large height-to-width ratios require foundations with significant uplift resistance. This paper presents a case study of the permanent rock tiedowns installed for One Manhattan West, a
-
Dynamic Load Testing Of Augered Cast-In-Place Piles (Rausche)
By Frank Rausche
The more widespread use of Augered Cast-in-Place (ACIP) Piles has generated increased demand for improved quality control measures. These deep foundation elements are often relatively long and slender
Jan 1, 2001
-
Seismic Rehabilitation Of Seattle's Pier 69
By David Pierce
The Port of Seattle, one of the largest on the west coast of North America, made a strong statement regarding their support for reusing existing structures when a decision was made to rehabilitate Pie
Jan 1, 1992