    Analysis of Load Transfer along Large Diameter Bored Piles in Very Dense Sands

    By Nabil F. Ismael, Khalid Farraj

    "The axial load transfer along large diameter bored piles in very dense silty sand was examined by field tests. Two instrumented piles 1.2 m diameter and with embedded length of 18 m and 25 m were loa

    Jan 1, 2017

  • DFI
    Current Practice For Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Pile Quality Control

    By Rudolph P. Frizzi

    Structures supported on ACIP and DD piles perform successfully when quality control is maintained from the initial site subsurface investigation through pile design, bidding, and construction. The fou

    Jan 1, 2005

  • DFI
    Site Development and Foundation Planning for a Wastewater Treatment Plant Expansion

    By Steven R. Ahlfield, Ali Ghandeharioon

    A wastewater treatment plant commissioned in 1978 is undergoing a major expansion. Planning various phases of the 8-hectare expansion at this site requires an understanding of the site response during

    Jan 1, 2019

  • DFI
    Construction Of Two Microtunnel Access Shafts Using The Cutter Soil Mix (CSM) Method In The San Joaquin Delta, California

    By Eric S. Lindquist

    Two microtunnel access shafts were constructed using the Cutter Soil Mixing (CSM) method in the San Joaquin Delta region of California, east of San Francisco. Unlike conventional slurry walls and diap

    Jan 1, 2010

  • DFI
    Grouting of an Artesian Zone in Advance of Powerhouse Excavation for the Red Rock Hydroelectric Project

    By Dewey W. Geary, Rachael V. Bisnett, R. Michael Bivens, Thomas G. Andrews

    "The powerhouse for the Red Rock Hydroelectric Project is being constructed at the toe of the existing U.S. Army Corps of Engineers’ Red Rock Dam immediately adjacent to the existing stilling basin re

    Jan 1, 2016

  • DFI
    Best Practices for Soil Mixing Near Sensitive Structures

    By Joseph A. Mann

    "Soil mixing is a proven solution for the construction of ground improvement adjacent to sensitive structures due to the use of computer controlled and monitored equipment. The precision to which geom

    Jan 1, 2015

  • DFI
    Estimation Of Modular Ratio And Modulus Of Deformation Of Granular Piles From In-Situ Compression Tests

    By Padmavathi V, M. Najamuddin, M. R. Madhav

    Granular piles are one of the leading ground improvement techniques, adopted for the betterment of bearing capacity and reduction in settlements of the foundations and also to accelerate consolidation

    Sep 1, 2022

  • DFI
    Inclusion of Overburden Soils Resistance into Shaft Nominal Capacity for Significant Economic Savings – An Osterberg Cell Load Test Case Study

    By Aditya Ayithi, William G. Ryan, Dean Herbst

    "For rock socketed drilled shafts, it is a common practice not to include the frictional resistance of overburden soils into the nominal capacity estimation. The primary reason often being cited is “o

    Jan 1, 2016

  • DFI
    Cost and Technical Comparison of Non-Destructive Test Methods for Drilled Shafts

    By Ronnie Melker, Joel Webster, Daniel Belardo, Thomas Hyatt

    Quality assurance of drilled shafts is highly dependent upon the construction practices used during the excavation and concrete placement process. When performed under slurry, challenges are presented

    Jan 1, 2019

  • DFI
    Refurbishment Of A Piled Commercial Building With A Single Level Basement For A 70% Increase In Floor Area

    By Henry H. Tayler, Eric Sturel

    1 Triton Square was originally a six-storey building with a one-level basement located within a commercial development near Euston, London. It was designed and constructed in the 1990s and the foundat

    May 1, 2022

  • DFI
    Case Studies Demonstrating The Effectiveness Of Vibroreplacement Stone Columns In Variable Soil Types

    By Lee R. Buhagiar

    As a result of the increased seismic risk and the highly variable geology of Christchurch, finding costeffective foundation solutions has been a challenge for the Canterbury rebuild. The soil profile

    Nov 1, 2022

  • DFI
    R C Harris Water Filtration Plant Expansion - Excavation Support Design, Installation and Performance

    By Michael Cianchetti, Nadir Ansari, Matthew Janes

    "PROJECT DESCRIPTIONThe R C Harris Filtration Plant underwent an expansion to install an underground sludge treatment capability consisting of a series of underground tanks within stepped excavations

    Jan 1, 2007

  • DFI
    Pile Driving Between the Amazonas and Xingu Rivers in the Tucuruí-Manaus Transmission Line – Lessons Learned and Solutions Found for a Challenging Project

    By José Carlos do Amaral, Marcelo Groszownik, Jorge Beim

    "Initiated in 2008, the project of this 1800 km long Electrical Transmission Line is a job of extreme technical complexity, crossing regions of major forests and rivers. When ready, it will allow the

    Jan 1, 2015

  • DFI
    Bored Pile Construction Challenges in Highly Variable Limestone for a Supertall Building

    By Seth K. Martin, Tony Nichlany, Alan R. Poeppel, Konstantinos Syngros

    "This paper presents a case study on bored pile construction in challenging karst conditions below a supertall building in Kuala Lumpur. Innovative design and construction techniques helped keep the p

    Jan 1, 2016

  • DFI
    State-Of-Art Working Platform For Heavy Equipments Used For Deep Foundation Construction

    By Arunsiva R., Sivaranan S., Venugopal B., Kumaran M.

    Being a rapidly developing country, India is undergoing a massive infrastructure phase change remarkably. The construction industry is already set to boom, but the time and space constraints necessita

    Sep 1, 2022

  • DFI
    Automation Of Pile Foundation Design Post-Processing To Produce Pile Plans

    By Rajasekar Subbian, Jessica Oudhof

    In the Netherlands pile foundation design is done using CPTs in accordance with EC7 national annexure. The capacity per tip level is calculated for every CPT followed by zonation to find the tip level

    May 1, 2022

  • DFI
    How Choice Of Foundation Can Alter The Fate Of A Bridge Project – 3 Case Studies

    By Alok Bhowmick

    The most uncertain and challenging part of a bridge design and construction is the ‘Choice of foundation’. During the planning and conceptual design stage, it is extremely important to choose the righ

    Nov 1, 2022

  • DFI
    A DC Electrical Resistivity Method for Jet Grouting Column Diameter Quality Control with Case Studies from Grand Paris Project

    By Sina Z. Yekta, Zhangwei Ning, Pierre Frappin

    This paper describes a DC (direct current) electrical resistivity method, which uses the contrasts in resistivity measurements to estimate the diameter of jet grouted columns as soon as they have been

    Sep 8, 2021

  • DFI
    Level Crossing Removal Project – Package 1

    By Andrew Middleton, Mick Stadter, Chris Crowe, David Chong

    "The Level Crossing Removal Project – Package 1 is part of the Victorian Governments commitment to remove 50 of the most dangerous and congested level crossings across Melbourne. This involved removin

    Jan 1, 1900

  • DFI
    New Application of Geophysics: Reduce Uncertainty in Subsurface Investigation for Deep Transmission Line Structure Foundations

    By Ralphie Adams, Tiana Rasmussen, Ashley E. Shirer

    Transmission line foundation designers must rely on limited subsurface information, from easily accessible locations, resulting in subsurface uncertainty, increased design risk and increased construct

    Sep 8, 2021