Ground Improvement Using Compaction Techniques on Calcareous Sands and Verification Tests Procedures
By Vijaya Bhushan Rao, Jason Redgers
A mixed-use development comprising of multistoried residential towers, retail and associated infrastructure covering an area of 500,000 m2 is under construction in Dubai. The subsoil conditions consis
Sep 8, 2021
-
Ground Improvement Using Compaction Techniques on Calcareous Sands and Verification Tests Procedures
By Vijaya Bhushan Rao, Jason Redgers
A mixed-use development comprising of multistoried residential towers, retail and associated infrastructure covering an area of 500,000 m2 is under construction in Dubai. The subsoil conditions consis
Sep 8, 2021
-
Construction of High Road Embankment over Thick Soft Silty Clay- A Case Study
By R. Radhakrishnan, C. Gunasekaran
"Calicut Bypass Phase-II project included construction of 7 m high embankment over soft compressible clays up to 18 m in thickness. Approx 1.5 km length of road out of a total 5 km length consisted of
Jan 1, 2015
-
8000 Series Piling Rig
By Roger A. Bullivant
The introduction of this size and type of piling rig is intended to address a multipurpose foundation activity. The 8000 denotes the size of equipment that is attached to the mast, namely 8000 Kg. Lar
Jan 1, 1995
-
Permanent Earth Retention for Deep Excavation Installed Within Minimal Right of Way Limits
By Thomas D. Humbert, Christopher J. Ramsey
Construction of a new underground parking structure in State College, Pennsylvania, is situated on a site constrained by limited ROW and required excavations ranging in depth from 25 ft to 40 ft. Addi
Jan 1, 2019
-
Design of a Raft Assisted Piled Foundation for a High Rise Prefabricated Hotel Structure in Perth, Wa.
By Lucie Spencer, Craig Butterworth
"This paper presents the design of a raft enhanced pile group recently constructed for a hotel development in Perth, WA. At the time of construction in 2016 the hotel was the tallest prefabricated hot
Jan 1, 1900
-
Design, Modelling And Construction Of A 12-Sided Diaphragm Walled Shaft
By Stephen Buttling
The construction of a water treatment plant in Dandenong, Victoria, required detention tanks and a pumping well. The design provided by the Engineer used conventional rectangular cast-in-situ reinforc
Nov 1, 2022
-
Execution of Pile Installation in Environmentally Challenging Sites
By Dena Morgan, Emre Biringen
"Abstract This paper discusses the execution of pile installation and design issues at two environmentally challenging industrial sites in North America. Environmental regulations set constraints on t
Jan 1, 2014
-
TBM Recovery Shaft Construction - SR-99 Tunnel
By Lance Rasband, Richard Hanke, John Starcevich
"The 17.4 meter (57 ft) diameter tunnel boring machine (TBM), the world’s largest at the time of her launch in 2012, locally referred to as “Bertha,” is stuck. Incapacitated due to mechanical failure
Jan 1, 2016
-
Evaluation of Soil-Bentonite Backfill Consolidation Properties
By Jeffrey C. Evans, Daniel G. Ruffing, Hejintao Huang
Soil-bentonite slurry trench cutoff walls are the most common type of vertical cutoff wall used in the US for seepage control and for passive control of contaminant migration at environmental sites.
Jan 1, 2016
-
Large Scale Jet Grouting And Deep Mixing Test Program At Tuttle Creek Dam
By Mario Mauro
Tuttle Creek Dam was constructed by the U.S. Army Corps of Engineers in the 1950?s on the Big Blue River in north-east Kansas. Since the dam is located in a seismic area, the safety of the dam was re-
Jan 1, 2008
-
Installation of Secant Pile Wall in Rock Adjacent to Fragile Building
By Chu E. Ho, Alfredas Daugiala, Nicola Ebanks
"The construction of an ancillary structure for the new Second Avenue Subway Line in Manhattan, New York City involved a deep excavation in highly variable rock conditions adjacent to a fragile masonr
Jan 1, 2016
-
Helical Pile Foundations at Tangier Island Substation
By Jeff Wilkinson, Brandon Walter
"A&N Electrical Cooperative provides electrical service to the counties of Accomack and Northampton along Virginia’s Eastern Shore and to Smith Island in Somerset County, Md.A&N recently worked to imp
Jan 1, 2017
-
DFI Europe Monitoring and Instrumentation Committee Objectives
By Rob van Dorp
"AbstractThe Monitoring & Instrumentation Committee (MIC) of DFI Europe has the objective to support DFI members in concern of risk management of geotechnical matters, where monitoring and instrumenta
Jan 1, 2014
-
Automated Pile Load Test Monitoring
By Joel L. Volterra
Since 1910, Mueser Rutledge Consulting Engineers (MRCE) has regularly provided professional engineering services including inspection of pile load tests. Historically, such services included on-site
Jan 1, 2008
-
Selmon Expressway, Tampa: Case History of Drilled Shaft Design for Extreme Variability
By Ross T. McGillivray, David S. Graham, Dan A. Brown, Steven D. Dapp
"The Selmon Expressway includes an elevated structure extending across several miles of weathered karstic limestone geology, and represents a challenge for design because of the high variability of th
Jan 1, 2015
-
Ground Improvement for New Jersey Turnpike Interchange 14A: A Case Study
By Sarah Ramp, Daniel V. Cacciola, Justin Labrozzi, Shafiq I. Siddiqui, Faisal Ahmed
"Construction of embankments up to 34 ft in height for twelve ramps and roadways needed for the New Jersey Turnpike Interchange 14A project required ground improvement. The subsurface conditions, cons
Jan 1, 2017
-
Experiences From A Large Scale Driven Precast Piling Project In India
By Rajesh A. Vaidya
A large scale piling work is undertaken in India for an important fast track industrial project. Thousands of solid square precast concrete piles are driven to depths of around 50m. Soils encountere
Jan 1, 2007
-
Monitoring of an Embankment Project Using Rigid Inclusions and Vacuum Consolidation During and After Construction
By Stephen Buttling, Zhong Rui
"A single unit gas fired power station was being built on the edge of the Gulf of Thailand in 2001. The soil conditions consisted of very soft to soft Holocene Marine Clay, and the site was part of a
Jan 1, 1900
-
Challenges and Lessons Learned from Shoring Design of 2nd / Broadway Metro Station
By Babak Mamaqani, Pirooz Barar
Regional Connector Transit Corridor (RCC) is part of the Los Angeles metro expansion project under construction which adds three new stations into the system. PB&A was responsible for the design of th
Jan 1, 2019