Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Mine to Mill Blasting to Maximize the Profitability of Mineral Industry Operations

    By Sarma Kanchibotla

    In mineral industry operations the insitu ore is’separated from the waste rock and is subjected to a series ofprocesses to convert it into a valuable product. Profitability of any operation in this in

    Jan 1, 2000

  • ISEE
    Reducing Underwater Blast Damage with Air-Screens

    By Gregory L. Hempen

    "Pressure waves from submerged blasting can have adverse impacts on nearby structuresand on aquatic fauna. Underwater blasting is not allowed for some situations withoutmitigation of these adverse pre

    Jan 1, 1993

  • ISEE
    Face Velocity Measurements using a Microwave Radar Technique

    By A T. Spathis, J J. Felice, T A. Beattie

    High speed cinematography of surface blasting operations is used for diagnosing various aspects of blast performance. Several quantitative features may be derived including confirmation of the hole in

    Jan 1, 1991

  • ISEE
    The Effect of Inclined Boreholes on the Quality of Blast Results in Coal Mining - Comparison Between Field and Simulated Results

    By D Schneider, H Elliott

    The advantages and disadvantages of using inclined boreholes in blasting has been under discussion for a long time. Some recognized disadvantages are that drilling costs, both operating and capital co

    Jan 1, 1988

  • ISEE
    Minimum Burning Pressures of Commercial Explosives

    By P. D. Lightfoot, C. Badeen, R. Turcotte, D. E. C. Jones

    Following localized (i.e. hot-spot) ignition, there is a minimum pressure required for combustion to propagate in water-based commercial explosives. The latter is usually referred to as the ‘Minimum B

    Jan 1, 2004

  • ISEE
    Bulk Loading of Emulsion Explosives in Shaft Sinking

    By R J. Roach, D Roy

    After months of discussion on ways and means to improve productivity in the shaft sinking process, it was decided to look at those areas where, historically, methods have been stagnant for many years.

    Jan 1, 1997

  • ISEE
    Supression of Blast Pressure and Noise from Implosive Type Connectors (b7d7fd43-f48c-43a3-af6c-8966c9e70d51)

    By Ettore Contestabile, Cameron Thomas

    Implosive-type electrical/mechanical connectors such as XECONEX have been used extensively for joining electrical transmission lines. This implosive action of explosives has also been applied to other

    Jan 1, 1995

  • ISEE
    Potential Blaster Liability under CERCLA

    By Charles A. Kliche

    The Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA) established a national program for responding to releases of hazardous substances into the environment. The fu

    Jan 1, 1997

  • ISEE
    Influence of Detonator Strength in the Behavior of Cap Sensitive Explosives Under Dynamic Pressure Conditions

    By Jaime Huidobro, Michele Hall

    The desensitization of an explosives column by the transmitted effects of the earlier detonations in nearby explosive charges is of vital concern to the explosives and blasting industries. Stress wave

    Jan 1, 1994

  • ISEE
    The Effect of Powder Factor on Fragmentation

    This paper examines the hypothesis that the fragment size distribution of blasted rock contains information about the changes in fragment sizes with distance from the borehole, and that this informati

    Jan 1, 1997

  • ISEE
    Size Matters on the Mesabi Range

    By Thomas Palangio, Lyall Workman, Jack Eloranta, Tom C. Palangio

    The fragmentation distribution of the blasted ore is an important descriptor of blasting results. Traditionally it has been hard to measure quantitatively. Developments in image analysis over several

    Jan 1, 2007

  • ISEE
    Studies on Bulk Explosives – A case study

    By B. M. P. Pingua & Md. Nabiullah

    About 60 to 70 percent of bulk explosives are used in Indian coalmines to achieve coal production for power generation. Coal India Limited (CIL) is the major coal producing company in India. The avera

    Jan 1, 2008

  • ISEE
    Defining Detonation Energy Fro Practical Blasting

    By Claude Cunningham

    Simple bulk energy rating of explosives obscures the realities of how these deliver their energy, and diverts attention from the key question of controlling blasting results. Explosive performance is

    Jan 1, 2002

  • ISEE
    Advanced Primer Designs

    By Tim A. Beattie, John R. Grant, David L. Kennedy

    After many years of research, ICI staff have developed a numerical modelling system for the study of detonator/primer/explosive configurations. Results from this work clearly identified that current p

    Jan 1, 1991

  • ISEE
    Training of Shotfirers in Queensland, Australia

    By A. Pope

    I have attended two Explosives Engineers’ Conferences in the past 4 years. The first was in Brighton, England with the European Federation of Explosives Engineers in 2005 and the International Society

    Jan 1, 2009

  • ISEE
    PPV. SD. Really? Still??

    By Doug Anderson

    Two quantities, Peak Particle Velocity (PPV) and Scaled Distance (SD), have controlled aspects of many blasting projects and operations for a long time. Vibration criteria typically use both PPV and S

    Jan 1, 2018

  • ISEE
    Case Study - Pumpable Emulsion Trials in Tunneling and Stoping

    By Eduardo Berger

    This paper describes a mechanized loading system, the HYDRODOSE, which allows the use of pumpable emulsions in underground mining. It also describes a pumpable emulsion explosive for small diameter ho

    Jan 1, 1991

  • ISEE
    Innovative Blasting Practice at Sands Hill Coal Company

    By Michael J. Burrell

    Sands Hill Coal, located in Wellston, Ohio produces coal for steam generation and crushed limestone for the aggregate market in southeastern Ohio. This paper concerns the blasting and production of th

    Jan 1, 1990

  • ISEE
    On the Influence of Powder Factor on Mucking Rate

    By Lina Lopez, Jose Sanchidrian, Manuel Lopez, Pablo Segarra

    Previous work in which rock properties and blasting parameters (geometry, charging and timing) were reported together with truck filling times, is taken as a starting point for a thorough analysis of

    Jan 1, 2008

  • ISEE
    Fixortm -A New Approach to Neutralizing Landmines and Uxo

    By Bill Bauet, John Anderson

    There are always security concerns when explosives are transported and stored, and these concerns are intensified in peacekeeping operations where explosives could fall into the wrong hands. MREL Spec

    Jan 1, 2001