Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Journal: Haz Mat 101, PART 1 - Hazardous Materials Shipping Papers and Emergency Response Information for Public Highway TransportationBy Tom Snyder, John Brulia
Part I is the first of a series of articles by the authors on hazardous materials (HM) transportation safety and compliance for shippers and carriers who offer and transport commercial explosives in c
Jan 1, 2014
-
How the USDA Uses Explosives to Remove Beaver Dams in Unique LocationsBy Bruce R. Leland, Steven H. Smith, John D. Paulson
The USDA - Wildlife Services has been removing beaver dams with explosives for over 30 years. This paper will discuss the history of the explosives program, summarize how we've evolved, and highlight
Feb 1, 2020
-
Modern Underground Raise and Slot DesignBy N. Rouse
Underground raises and slots are a vital part of underground blasting operations. Raises and slots are vertical shafts or openings used for ventilation, ore passes, or creating voids in stopes. In the
Jan 1, 2024
-
Risk Assessment Software Applied To Large Bomb Detonations Near StructuresBy Joshua Hoffman, Rob Farnfield, Catherine Johnson, Braden Lusk, Morgan Lane
IMESAFR (IME Safety Analysis for Risk) is a quantitative risk assessment software tool developed by the Institute of Makers of Explosives (IME) and A-P-T Research, Inc. It is used for managing risk in
Jan 1, 2014
-
Limitations of using PPV Damage Models to Predict Rock Mass DamageBy Jianping Li, Ernesto Villaescusa, Kelly Fleetwood
During blasting, stress waves propagate through a rock mass, inducing stress and strain changes. This applied deformation affects intact rock, existing discontinuities, mine excavations, and engineere
Jan 1, 2009
-
Site Specific Blasting Model Using Schmidt Tensile Strength and Image AnalysisBy K. M. Kim, J. B. Kemeny
A case study was conducted with 5 shots with varying pre-blast block sizes and explosive energies. From this case study a site-specific predictive fragmentation model was developed. There are two main
Jan 1, 2011
-
Comparison of Structure Response to Hard and Soft Rock BlastingBy C. T. Aimone-Martin, V. L. Rosenhaim
The response of two structures to blast-induced ground vibrations were evaluated and compared in order to quantify the impact of different blasting operations, hard rock and soft rock blasting, upon t
Jan 1, 2015
-
Study of Sheet Charge Initiation with Varied Cap Type, Orientation, and DistanceBy C. E. Johnson, R. L. Bauer, E. M. Johnson
In industry, the strength of a blasting cap is often equated to the type of explosive it can detonate. Comparable cap strength is becoming less important as nearly all caps manufactured today can init
Feb 6, 2023
-
Vibration Monitoring Using In-house Developed Devices – A Taylor’s ApproachBy Auã Kiahla, Tomi Kouvonen, Vinicius Miranda
Through numerical mathematical processing (Taylor’s approach and numerical derivation) the original data supplied by the accelerometer’s sensors was transformed into velocity and, after the data minin
Feb 1, 2020
-
1 January 2003 : Deadline for meeting legal requirements relating to the sale of explosives in the European UnionBy R. K. Wharton
A European Directive requires that an explosive which is sold or transported within Europe must meet certain essential safety requirements from 1 January 2003. The assessment and certification of such
Jan 1, 2002
-
Journal: 100 Years / Scientific American New York December 2, 1911 The First National Mine Safety Demonstration Study Of A Real Mine Explosion By Charles L. Wright, Fuel Engineer, Bureau Of MinesBy Robert Hopler
THE work that is being done by the Government to reduce the dangers of mining was brought out strikingly in the First National Mine-Safety Demonstration which occurred at Pittsburgh, Pa., on October 3
Jan 1, 2012
-
A Holistic Approach to Developing a Narrow Cutback at an Open Cut Copper MineBy Stephen Mansfield, Nathan West, El Khalil Seyed
In October 2017, a multi-bench failure occurred in the east wall of the Guelb Moghrein copper and gold mine in Mauritania. The failure extended 100 m (328 ft) vertically and horizontally and resulted
Jan 21, 2025
-
Drone Technology Utilization to Increase Safety and Support Analysis for Blasting ProcessBy Ery Wardhana, Stefanus Jagad, Relinda Sanistya, Hasucita Tausi, Rido Situmorang
The blasting process is one of the most high-risk activities in mining operations. Shotfirers and blasting crews face hazards from slope failure, toxic gas and fumes, or unstable ground condition ever
Feb 6, 2023
-
Automation of Drill and Blast - Measurement Techniques to Develop Standard Procedures (a3ef629c-b178-4045-bc88-d04c273fd2c0)By Ewan Selers, Gary Cavanough
Drilling automation technology is well advanced and automated drill rigs are in use at a number of operating mines. This is not the case for the other drill and blast processes due to significant tech
Jan 1, 2016
-
Full Wall Control Blasting OptimizationBy John Floyd, Maria Rocha, Benjamin Cebrian
Wall control blasting is needed in most metal mining operations in terms of increasing mineral reserves and assuring the safety of the operation. This type of blasting has the goal to achieve a clean,
Jan 1, 2018
-
Impact of Open-pit Blasting on the Stability of Adjoining Multiseam Workings of Underground Coal MineBy Ajoy Singh
A study was conducted to investigate the damage potential to underground multi-seam openings caused due to vibration generated by open-pit coal mine blasting. The objective was to recommend optimal ex
Jan 1, 2012
-
Journal: Kaiser Plant Demolition / Smokestack Demolition at port of Tacoma, WashingtonBy Walt Meglasson
The Kaiser Aluminum Company Smelter, one of several in the Pacific Northwest, was built in 1942 and operated by the Olin Company during World War II and then purchased by Kaiser Aluminum after the war
Jan 1, 2008
-
Physical Security On-Siite Magazines, Keys, Trucks & PeriimetersBy John Brulia
"Definition of On-Site Security: All mandatory and non-mandatory, deterrent and loss control measures undertaken by an authorized explosives business tokeep its stocks of explosive materials and precu
Jan 1, 2006
-
Development and Blast Applications for Resolution Copper's No. 10 ShaftBy Tom Goodell, James Cox, Scott Scovira
Resolution Copper Mining is sinking a 6943 foot (2116 m) deep shaft to access and develop a new panel caving mine with approximately 1.6 billion known tons of porphyry copper resource. This mine will
Jan 1, 2014
-
Occidental's Resorts 7 and 8 Blasting Design and ResultsBy Thomas E. Ricketts
Occidental Oil Shale, Inc. constructed two commercial-sized modified in situ (MIS) retorts, Retorts 7 and 8, at its Logan Wash Oil Shale Mine in February and April 1981, respectively. One of the prima
Jan 1, 1984