Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Back to the Basics; Nonelectric Initiation Shock Tube Systems Part 2: Safety ConsiderationsBy Larry Schneider
"0 ne of the incentives that led to the development of non-electric shock tube initiation systems was the desire within the industry to improve detonator safety. And to the extent that nonelectric ini
Jan 1, 1995
-
Sappington Bridge: An Opportunity for Strengthening Research and Demolition TrainingBy J. Baird
The Sappington Bridge, a steel arch span bridge constructed in 1904 over the Meramec River, was demolished due to its advanced state of deterioration. The demolition was a project to benefit Crawford
Jan 1, 2003
-
Safety Talk - Misfires: What All Employees Need to KnowBy Robert Morgan
The mind-set that only blasters and their helpers need training in explosives can result in risk to other employees working at mine or construction sites where blasting is conducted. Misfires are not
Jan 1, 2004
-
Blast Design & Diagnostics Using Portable Solid State, High-Speed Videography SystemsBy Laura Bastemante, Bruce Vandenberg, Fred Huettig
Recent advances in solid-state, field portable, fast framing video camera systems and PC based frame capture hardware now allow blast imaging up to loo0 frames per second. Up to 8 seconds of data can
Jan 1, 1997
-
A Classic Experiment with Air Overpressure and WindowsBy Charlie Adcock, Rob Farnfield, Andy Wetherelt
The ISEE Blasters Handbook gives guidance on the level of air overpressure likely to cause occasional window breakage (151dB) and general window breakage (171dB). A long-term safe level of 140dB is al
Jan 1, 2006
-
What a Gas: Blasting Under PressureBy Jerry Wallace
This project consisted of blasting for expansion of a major interstate natural gas transmission pipeline pump station. The pump station handled 400-500 million cubic feet (1 l- 14 million cubic meter
Jan 1, 1996
-
Investigation of Ground Vibration at Gulyali Basalt Mine in TurkeyBy Ali Kahriman, Alper Celtikc, Serdar Celik, Tuncer Gungor
This paper presents the results of ground vibration measurements carried out in Gülyali Hisarcik Basalt open pit mine located on the north side of the Anatolia near Ordu province in Turkey. Within the
Jan 1, 2013
-
Fire and Explosion of a Mobile Explosive Manufacturing UnitBy Jose a. Sanchidrian, Ramon G. Eguren, Javier L. Amigo
On December 2013 a MEMU exploded at a blasting site in Norway, after burning for more than two hours. This paper describes the analyses made to determine the actual yield of the explosion, the lessons
Jan 1, 2016
-
Tall Structure Response to Close-in Urban Blasting in New York City – Part 2By Cathy Aimone-Martin, Caitlin Woznick, Brent Meins
This study is a continuation of previous work in which the responses of tall structures to close-in construction blasting at two rock excavation sites are evaluated. A total of eight buildings were in
Jan 1, 2015
-
Predicting Blast Vibrations More Conveniently than with the USBM MethodBy R. F. Favreau, Patrice Favreau
"A blast with explosives creates vibration waves in the zone around the blast.The prediction of the intensity of vibrations is important because people in the cinity demand that the vibrations do not
Jan 1, 2015
-
Ontario Hydra T.G.S. Chimney Demolition Thunder Bay, Ontario, CanadaBy Ray Jambakhsh, Gabrielle Bourget
In the summer of 1998, Ontario Hydro awarded a contract to demolish an obsolete and inefficient chimney by blasting. The Ontario Hydro Thunder Bay Thermal Generating Station (T.G.S.), is a fully opera
Jan 1, 2000
-
Usability of Expert System Integrated With GIS in Blasting OperationsBy U. Gorkhan Akkaya, N. Enver
Geographic information system (GIS) is one of the most accurate and useful tools to help decision – making for decision-makers. As to expert systems, it provides solutions to the problems faced by mim
Jan 1, 2013
-
Effects of Electronic Detonators in Underground Tunneling ApplicationsBy Charles Zdazinsky
Over-break is undesirable in underground civil construction because it excessively damages rock along the perimeter of the tunnel, which directly influences the cycle times of advancement. A quicker c
Jan 1, 2015
-
An Improved Technique for Predicting Vibration Levels from Tunnel BlastingBy W. J. Birch, M. Kirke
Despite increasing competition from mechanical methods of tunnelling, the drill and blast method is often still the most viable method of excavating tunnels in strong and abrasive rock. To advance a t
Jan 1, 2005
-
Large Hole Rotary Drill PerformanceBy J Lyall Workman, Peter N. Calder
"Large hole rotary drilling is one of the most common methods of producing blastholes in open pitmining. Large hole drilling generally refers to diameters from 9 to 17 inch (229 to 432 mm), however ac
Jan 1, 1996
-
Blast Vibration Modelling - An Instrument to Optimise Quarry ProductionBy Drew Martin
In March 2010 the Boral Linwood Quarry, Adelaide South Australia, implemented the blasting contractors Monte Carlo Blast Vibration Model as part of their blast design process. The Linwood Quarry was d
Jan 1, 2012
-
Preparing a Written Blast Plan (1b8a88a8-1e7f-429f-bd71-b32f7b3dbf86)By David Ziegler
A formal blast plan is sometimes required for projects involving rock excavation. A written blast plan submitted with a bid proposal can also be an important sales tool. A blast plan will cover the ba
Jan 1, 2003
-
Explosive Detection Recovery and DisposalBy Robert McClure
The detection, recovery and disposal of commercial explosives and explosive waste has always carried a level of risk and requires specialized equipment and technical expertise. Improperly stored, disc
Jan 1, 2015
-
Cast Blasting in the Light of the Electronic OptionBy Winfried Rosenstock
The development of electronic initiation systems has partially reached or will reach in a short period of time full reliability for general use without limitations. Unfortunately those systems meet wi
Jan 1, 2003
-
TNT Equivalence and Fragmentation Mechanisms of High Pressure Gas Fracturing TechniqueBy Baohua Guo, Xuelin Yang, Tingkan Lu, Hailin Sun
The work presented in this paper mainly involves two parts. Firstly, the fundamental characteristics of the high pressure carbon dioxide gas fracturing technique (CO2 technique), including, a proposed
Jan 1, 2017