Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Blasting for Rescue Applications

    By John Norman

    This paper will cover blasting techniques that are applicable to underground and other rescue that involves removing obstacles and breaking rock in close proximity to rescuers and subjects.

    Feb 1, 2020

  • ISEE
    A Reanalysis of Fragmentation Data from the Red Dog Mine - Part 2

    By Norman Paley, Finn Ouchterlony

    Detailed fragmentation data for different blast delay timing tests at the Red Dog mine in Alaska are analyzed. This work is a continuation of previous work in which the crusher output was found to be

    Jan 1, 2013

  • ISEE
    Plug Blast for a Powerhouse Intake Using an Unusual Technique

    By Terry Matts, Bruce Ripley, Clark Fletcher, Paul Rapp, Stan Holtby, Jim Dent

    The Stave Falls Project of BC Hydro, situated 65km east of Vancouver, BC, Canada, involved the construction of a new two-unit 9OMW hydro-electric facility to replace an existing powerhouse. The final

    Jan 1, 2000

  • ISEE
    More than Scratching the Surface – Capturing Blast hole Features to Improve QA/QC and Compliance to Design

    By Paul Klaric, Nicholas Bodley

    Every blasting engineer or professional can attest to the age-old conundrum of obtaining accurate hole information on a large scale prior to loading explosive charges in a blast hole. Even though the

    Feb 6, 2023

  • ISEE
    Evaluation Of Suitability Of Permitted Delay Detonators Vis-avis Their Delay Timing For Use In Underground Coal Mines

    By Harsh Kumar Verma

    Blasting off-the-solid is the most commonly used method during development of galleries in Bord and Pillar method of underground coal mining. In this method, only P5 explosives are used with permitted

    Jan 1, 2008

  • ISEE
    Urban Tunneling for the MWRA's Boston Harbor Clean Up

    By Gordon C. Petersen, Gary A. Almeraris

    This paper describes the controlled blasting techniques required to mine a rock tunnel section of a main interceptor located in the Boston Metropolitan area. The 3m (10 ft) x 2.8m (9.25 ft) horseshoe

    Jan 1, 1991

  • ISEE
    Update on Blasting Near a Crusher

    By Scott G. Giltner, Alex Schwenk

    This paper is an update on a paper presented at the 2022 ISEE conference. The original paper presented how the mine operator desired to open up ore reserves near several mine structures including two

    Jan 21, 2025

  • ISEE
    The Effects of Run-up on an Explosively Formed Projectile

    By Jason Baird, Joshua Hoffman, Phillip Mulligan

    The purpose of this report is to address the method of reducing the overall explosive weight of Explosively Formed Projectiles (EFPs) while still achieving satisfactory performance. This reduction is

    Jan 1, 2010

  • ISEE
    Journal: A Public Relations Plan Based on Structure Generated Sounds and Public Input

    By Ken Eltschlager, J Silva Castro, J. M. Hoffman, Braden Lusk

    This case study focuses on analysis of sounds inside a house induced by blasts as result of surface mining coal in West Virginia and how to better communicate technical information to the public. The

    Jan 1, 2012

  • ISEE
    Correlating Near-Source Damage from Single-Hole Explosions to Seismic Waves

    By Randy Martin, Jessie Bonner, Peter Boyd, Mark Leidig, Timothy Rath

    We conducted the Vermont Damage Experiment in central Vermont during July 2008. Five single-hole explosions with yields ranging from 60.8 kg (134 lbs) to 122.5 kg (270 lbs) were detonated in homogeneo

    Jan 1, 2010

  • ISEE
    Low Powder Factor Blasting to Take Advantage of Natural Rock Fissures is Uneconomical

    By R. F. Favreau, Patrice Favreau

    In many quarries and construction sites visited by the authors over the last 50 years, the latter have observed muck piles from blasting with explosives, which included numerous large blocks, in some

    Jan 1, 2018

  • ISEE
    Moving 50’(15.3m) of Burden with a 4½” (115mm) Hole

    By Keith Henderson

    An open pit quarry operation in West Central Illinois provided a challenging proposition regarding the removal of a rock wall that once separated two pits, but was now in the middle of the north wall

    Jan 1, 2012

  • ISEE
    Drilling on the Taum Sauk Upper Reservoir Rebuild Project

    By Randall Head

    The drilling at the Taum Sauk Reservoir was a unique compilation of the latest technology and everyday common sense. This site is comprised of rhyolite, which is 30 times harder than limestone in comp

    Jan 1, 2010

  • ISEE
    Refinements in Blasting Practices at Minntac Mine

    By B Kniivila, A B. Andrews, T Lerick, Keith Jansen

    Minntac Mine is a large, open pit taconite mine located at the center of the Mesabi Iron Range in northern Minnesota. The planned development of the Mine in the direction of nearby communities prompte

    Jan 1, 1984

  • ISEE
    Detection of Geological Features using Aerial Image Analysis and Machine Learning

    By Ravi Sahu, Ankit Jha, Sudarshan Rajagopal, Purushotham Tukkaraja

    Geologic structures are one of the crucial parameters in blast design. Structural geology and rock properties influence drilling patterns, blast layout, and initiation systems. A comprehensive underst

    Feb 1, 2020

  • ISEE
    High Resolution Seismic Refraction Tomography for Determining Depth of Blast Induced Damage in a Mine Wall

    By Stephan Iversan, Janae Singer

    High resolution seismic refraction tomography has proved to be a useful tool to effectively estimate depth of blast induced damage in rock. Excavation blast damage can be as shallow as 1 to 2m (3 to 7

    Jan 1, 2009

  • ISEE
    Journal: Vibration Control Through Better Predictions

    By Keith Best

    It has been said that when a person does something right no one remembers but when they do something wrong no one forgets. This statement, when applied to the explosives industry, has never been truer

    Jan 1, 2008

  • ISEE
    Evaluation of Emergent Electronic Detonators and Modern Non-Electric Shocktube Detonators Accuracy

    By J Silva Castro, W C. Wedding, B T. Lusk, J Calnan, E G. Morris

    The emergence of electronic detonators for use in production mine blasting has enabled mining professionals to rethink the traditional blast design methodologies that pertain to timing. In many ways,

    Jan 1, 2012

  • ISEE
    Fewer Surprises When You Measure the Sizes

    By Tom C. Palangio

    Commercially available online particle size analyzers (OPSA) are in their third decade of development (Palangio, T.C., 1985), (Franklin, J. A., Maerz, N.H., 1987), (Maerz, N.H., Franklin, J.A., and Co

    Jan 1, 2016

  • ISEE
    Underground Longhole Blasting near Large-diameter Booster Fans

    By Norm Disley, Kingsley Hortin, Gertjan Bekkers

    As part of the expansion of the Kidd Creek Mine to 2,682 meters (8800 feet) below surface, two largediameter 3000kW (4000HP) booster fans were installed at the 6000 level. Shortly after commissioning

    Jan 1, 2008