Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Quality Control in the Grouting of Saturated Fractured Rock
By Yu. A. Polozov, V. A. Lagunov, O. Yu. Lushinkova, Yu. I. Svirskiy, Eh. Ya. Kipko, Roy A. Williams
The reliable quality assessment of grouting operations is one of the key issues in establishing impermeable grout curtains around shafts, drifts and tunnels. Reliable opera¬tional information on the d
Jan 1, 1993
-
Novel Flotation Technology - A Survey of Equipment and Processes
By Kenneth J. Miller
Froth flotation is one of the most actively pursued research and development areas in the coal preparation industry today. Many new types of flotation machines and processes are being developed and co
Jan 1, 1988
-
Accurate Psychrometry For U.S. Mine Ventilation Engineering
By James Warren Andrews
The values of saturated water vapor pressure from steam tables have been found to be inaccurate for mine ventilation usage because the effect of air on the saturated water vapor was disregarded. Prese
Jan 1, 1989
-
Operation Of A Bio-Oxidation Pilot Plant On A Refractory Gold Concentrate
By J. T. Sitarski, R. C. Emmett, L. W. Luinstra, R. P. Klepper
A mining operation in Zimbabwe produces a pyritic gold concentrate that requires oxidative pretreatment prior to cyanidation in order to liberate 80 percent of the gold values. Bio- oxidation offered
Jan 1, 1990
-
Hydrologic Aspects of Surface Mining in Arctic Regions (b5eaf28f-3fee-4dd0-a294-ab34e62398fc)
An insufficient hydrologic data base exists for most large and small coal basins in Alaska owing to the lack of need in the past to collect data. The runoff process is insufficiently understood which
Jan 1, 1988
-
Detailed Fire Safety Design of Subways for Arson-Initiated Design Fires Innovation, Coordination, Implementation
By Sandeep Upadhya, Marc Morgan, Baljinder Bassi, James Fletcher, Mike Deevy, Nishant Nayan
"In order to protect public safety in the event of a deliberate fire attack, underground rail authorities are increasingly considering the need to design for arson-initiated fire scenarios. Where typi
Jan 1, 2016
-
A Comparison Of Laboratory- And Commercial-Scale Coal Froth Flotation Using Models Of Rate And Residence Time
By B. J. Arnold, F. F. Aplan
A model incorporating rate and residence time to describe the froth flotation process was used to provide data for the evaluation of various kinetic flotation models and to provide scale-up informatio
Jan 1, 1989
-
Options And Costs For Co2 Reductions At Coal-Burning Utilities
By E. W. Hawk
The power generation industry may be required to reduce CO, emissions if regulations related to global climate change are enacted. Coal-fired generation, which emits 82% of the power sector CO2, would
Jan 1, 1999
-
European Stabilization Practice Using Chemical Systems In Urban Tunneling
By G. Wayne Clough
During shallow tunneling in an urban environment, deposits or pockets of saturated soil or fractured, weathered rock are often encountered. Under such conditions, special problems with tunnel support,
Jan 1, 1976
-
6. Computer Applications on Slurry Pipeline Systems
By J. D. Pitts
Long distance slurry pipeline systems for steam coal, iron concentrates, copper concentrates, and limestone, first used nearly 60 years ago, are now transporting nearly three billion ton-miles annuall
Jan 1, 1979
-
Scrubber Design For Removing Sulfur Dioxide From Off Gases Of Coal Burning Power Plants And Metallurgical Smelters
By Lewis. Clifford J.
The purpose of this article is to present design information and operating data on a pilot gas scrubber which is believed to be a new approach for removing noxious gases and particulate matter from th
Jan 1, 1973
-
The Commercial Readiness Of Coal Liquefaction Processes ? Introduction
By Charles H. Rice
Coal liquefaction processes can be divided into two broad classifications - direct and indirect. Direct liquefaction processes, in general, slurry coal with a solvent and react it with hydrogen under
Jan 1, 1981
-
Use Of Groundwater Models For Evaluating Coal Ash Disposal Sites
By R. J. Sweigard
Many states are considering the need to establish or modify policy relating to the disposal of coal ash. One of the primary concerns is the impact of leachate from the ash disposal sites upon groundwa
Jan 1, 1993
-
Outfall/Diffuser System Works Well At Coloso In Chile
By Deborah Muggli
Minera Escondida is the world's largest copper mine. Its capacity is more than 800 kt/a (880,000 stpy) of copper. The Escondida open-pit mine operates at an elevation of 3,100 m (10,170 ft). It i
Jan 1, 1997
-
Chemical Processing Of Tungsten Ores And Concentrates
By K. C. Li
The scope of this subject is a broad one. The demand for a metal with high refractory properties, great strength at elevated temperatures and high nuclear cross section, has put tungsten in the foregr
Jan 1, 1961
-
Geostatistical Reserve Estimation in Dorreh Barite Mine
By Hassan Madani, A. Malek Mohammadi
Dorreh barite mine located in the central part of Iran is one of the largest barite mines, in the country. The mine is subdivided into three blocks, which are called block 1,2,3 according the barite q
Jan 1, 1996
-
Mexican Fluorspar, Actual Situation And Future ? Introduction
By Alejandro Prieto
Traditionally, Mexico has been a mining country. This industry has played a very important role in our country's development, creating jobs, integrating geographical regions - generally very remo
Jan 1, 1986
-
Controls on Acid Water Migration in the Pinal Creek Alluvial Aquifer, Globe-Miami Mining District
By James R. Norris, Thomas A. Conto, Gary R. Walter
For at least five decades, a plume containing acidic metal-bearing water has been moving through the shallow alluvial aquifer along Pinal Creek in the Globe-Miami area. Two chemical facies of water ar
Jan 1, 1991
-
Cost Management and Cost Control
By Bruno C. Boik
INTRODUCTION Cost Management is the evaluation and control of project scope, budgets, and costs with the objective to minimize costs and maximize the benefits to be derived from the use of project r
Jan 1, 1986
-
The Underground Powerhouse And Tunnels For The Bad Creek Pumped Storage Project - A Case History
By Richard E. Steffens
The underground portion of Duke Power Company's Bad Creek Pumped Storage Project in northwestern South Carolina consists of a powerhouse cavern (132 m. long, 23 m. wide, 50 m. high), 407 meters o
Jan 1, 1989