Hydrologic Design And Application Problems Associated With Lignite Mining - 1.0 IntroductionBy D. Suarez
The work of engineers responsible for the design and performance of mine facilities is often challenged by economic and practical constraints in the field. Problems have developed in implementing desi
Jan 1, 1986
-
The Concurrent Construction Of Two Side By Side Declines Utilizing An Atm-105 Road Header As The Primary Means Of ExcavationBy A. J. Dudzik
In 2006 Arch Materials initiated the development of an underground limestone mining complex. The decision to proceed with the project was the end result of several years of market research and geologi
Jan 1, 2010
-
Discussion – Grade Estimation and Its Precision in Mineral Resources: The Jackknife Approach – Mining Engineering, Vol.48, No.2, pp.84-88 – Adisoma, G. S. and Hester, M. G.By D. G. Krige
I read the paper “The jackknife approach” with interest. There appears to be a widespread misunderstanding of the kriging variance as a measure of the error variance of the kriged grade estimate of an
Jan 1, 1996
-
Optimizing Conveyor Capacity and Reliability: The Pittsburgh & Midway Coal Mining Co.- North River Mine ExperienceBy Roland Hoet, Jim Patilla, Nick Madison
Increasing conveyor capacity and reliability is a common goal for many underground mines. This task is especially challenging when you must work with existing structure, belt, etc. Meeting this challe
Jan 1, 2002
-
Bridging the Gap—From Borehole Spacing to DSC Claim Resolution - NAT2022By Kapila Pathirage, Michael S. Schultz, Gregory Sanders, Ulf G. Gwildis
Adequate understanding of the subsurface conditions along the alignment of a planned tunnel is key for managing project risk. For achieving this understanding, geotechnical borings are conducted durin
Dec 1, 2022
-
Large Truck Trains -A Rapid Transit System For Phosphate Ore (ca0348ac-71ba-4bda-b9bc-896ef9015445)By George L. Atwood
The Monsanto Company's Henry Mine is located 17 miles northeast of Soda Springs, in the southeast corner of Idaho. Ore being mined is phosphate rock which lies in the Permian Phosphoria formation
Jan 1, 1972
-
Increased Productivity Through Modern Material HandlingBy Edward C. Mabbs
U.S. industry must increase its productivity or lose its competitive position in the rapidly expanding and inter-dependent world markets. Recent improvements in material handling techniques and equipm
Jan 1, 1973
-
ARMCO Autometrics Particle Size Measurement And ControlBy Albin E. Anderson
The PSM System has been available to the mining industry for nine years. During this time, many of the more than 160 Systems sold have been put to practical use and have provided the owners a handsome
Jan 1, 1979
-
Interfacing Environmental Risk Assessment With Mine ManagementBy Gordon M. Elliott
Health risk underlies all of today's environmental regulations. Mine Manager's are no strangers to risk, but risk in the context of mine management is not the same as risk in the context of
Jan 1, 1992
-
NSTA Conventions Again Well Received By TeachersBy Sue Sawyer
In October, November and December, teachers at the National Science Teachers' Association (NSTA) area conventions were lured to visit the Minerals Education Coalition (MEC) booth by the promise o
Jan 1, 1998
-
Radioactivity In Coal And Environs At The Cholla Power Plant Joseph City, ArizonaBy Raymond E. Kary, John W. Mcklveen
The four unit Cholla coal fired power station at Joseph City, Arizona, consumes coal from the McKinley mine located in western New Mexico. Since coals may contain relatively high uranium or thorium co
Jan 1, 1981
-
Pneumatic Loading Of Nitro-Carbo-Nitrates Static Electricity, Fumes And Safe Handling - IntroductionThe introduction of nitro-carbo-nitrate (NCN) blasting agents has been one of the most significant innovations in the explosive industry in the last twenty years. The most commonly used blasting agent
Jan 1, 1973
-
Structural Fire Protection to NFPA 502 - Performance-Based Design and Assessment of Passive and Active Fire Protection SystemsBy Robinson Leon-Diaz, Alberto Jaen-Toribio, Raymond Blanchard, Mike Deevy, Miguel Fuentes-Llanos
"Tunnels designed to NFPA 502 are required to withstand the RWS time-temperature curve, more specifically prevent progressive spalling and loss of strength of steel reinforcement. Fire boards or spray
Jan 1, 2016
-
40 Years of Experience in the Use of Umbrella Arch Method in Tunneling: Problems and SolutionsBy Georgios Kalamaras, Sebastiano Pelizza, Carlo Alessio
"This article describes, through the presentation of five cases-history, technological advances that the Authors together with Tunneling Contractors devised for coping with adverse geotechnical condit
Jan 1, 2016
-
Probabilistic Ecological Risk Assessment (ERA) Incorporating Geochemical Speciation to Determine Bioavailable Metals in Freshwaters Affected by Acid Rock Drainage (ARD).By J. Twining, V. Nguyen, J. Perera
A computer code for ecological risk assessment (ERA), AQUARISK, has been developed and applied to evaluate the likelihood of biotic detriment due to exposure to acid rock drainage (ARD) from the Burku
Jan 1, 2000
-
The Application Of Rock Mechanics To Design Of Longwall Systems For Control Of Tailgate ProblemsBy Charles T. Holland
The tonnage produced on mechanized automated retreating longwall faces in the United States is growing rapidly. This time last year some 14 faces were operating, and in addition to that, three were kn
Jan 1, 1969
-
Part 8: Iso-DefinitionBy Richard B. Muter
1. Coal Preparation Terms (General) 1.1 Coal preparation-collectively, physical and mechanical processes applied to coal to make it suitable for a particular use. 1.2 Run of mine (ROM coal)-coal p
Jan 1, 1991
-
Economic Comparison And Evaluation Of An Overland Conveyor Versus Alternate Transportation MethodsBy F. M. Benavides
The mining complex being analyzed consists of four mines and two processing plants located in an area where there are several existing modes of transportation. Figure 1 shows a map of the general la
Jan 1, 1980
-
Double thickener circuit at Gold Fields' Chimney CreekBy J. O. Marsden, J. H. Gourdie, J. R. Arnold, J. G. Mansanti
During the testing and design of the Gold Fields' Chimney Creek mine, it was found that a much higher carbon loading was possible with CIC (carbon-in-solution columns) than with CIP (carbon-in-pu
Jan 1, 1990
-
Underground Ventilation Remote Monitoring and Control SystemBy Kirk H. P. E. McDaniel, Mark T. Strever, Keith G. Jr. Wallace
This paper presents the design and installation of an underground ventilation remote monitoring and control system at the Waste Isolation Pilot Plant. This facility is designed to demonstrate safe und