Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Mitigating Subsidence Influences on Residential Structures Caused by Longwall Mining Operations

    By Yi Luo

    The severity of disturbances caused by longwall mining subsidence to various residential structures can be re¬duced. The success of such mitigation efforts depends on accurate subsidence prediction, c

    Jan 1, 2003

  • SME-ICGCM
    Sidewall Fracturing In Coal Room And Pillar And Pillar Extraction Panels (fdea63a5-d54d-46e2-aad5-6c4f1c72e2f1)

    By André Vervoort

    In coal room and pillar, and pillar extraction panels, the sidewall conditions were investigated based on underground measurements and numerical simulations. Three-dimensional linear elastic models pr

    Jan 1, 1992

  • SME-ICGCM
    Three-Dimensional Simulations Of The Roof Behavior In Coal Room And Pillar Panels

    By Andre Vervoort

    The roof in coal room and pillar panels is normally stratified and can be thought of as beams or plates supported by the pillar sides in the roadways and by pillar corners in the intersections Undergr

    Jan 1, 2000

  • SME-ICGCM
    Validation of Overburden Failure Zone in Complex Extra Thick Coal Seam by EH?4 Magnetotelluric Method

    By Hai Rong

    EH-4 Electrical conductivity imaging system has been playing an important role in prospecting, looking for water resource, and determining coal mine gob boundary by virtue of its significant advantage

    Jan 1, 2014

  • SME-ICGCM
    Effects of Longwall Mining on Streamflow in the Pittsburgh Seam Basin

    By Kenneth L. Johnson

    The effects of underground longwall coal mining on flow in perennial streams within the Pittsburgh seam basin were evaluated. Four streams above four different longwall mines were studied. Overburden

    Jan 1, 1997

  • SME-ICGCM
    Multiseam Mining On South African Collieries

    By R. W. Hill

    Multiseam mining has been carried out at many collieries in South Africa. It the seams are In close proximity difficult and dangerous mining conditions may arise. In the Witbank area multiseam bord an

    Jan 1, 1995

  • SME-ICGCM
    Improving Stope Support At Modikwa Platinum Mine

    By Jaco J. van Vuuren

    Modikwa Platinum Mine, in the Eastern Bushveld of South Africa's Limpopo Province, is a new operation employing a hybrid mining method where mechanised methods are used for the main developments

    Jan 1, 2004

  • SME-ICGCM
    Development of the Laboratory Short Encapsulation Pull Test for a Revised British Standard on Rock Reinforcement Components Used in Coal Mining

    By D. Bigby

    The current British Standard on rock reinforcement components used in coal mining (BS7861:1996) employs the axial double embedment tensile PET) test to determine the main system load transfer performa

    Jan 1, 2005

  • SME-ICGCM
    The Slope Stability Assessment in the Wall Overlooking the Sungun Copper Concentrator Plan

    By S. Mehrdad Heidari

    The concentrator plant is located near a very high (105m), large (- 500m) and steep (a, > 45' ) wall. Geologically, the wall was composed of very complicated formations and broad range of soils a

    Jan 1, 2005

  • SME-ICGCM
    Overburden Failure Characteristics of Extra?Thick Seam Using Top Coal Caving Mining Method at Tongxin Coal Mine

    By Zhijie Zhu

    In order to determine the overburden failure characteristics of extra-thick seam mining, EH4 electromagnetic image system and borehole televiewer survey were applied to panel 8100, Tongxin coal mine.

    Jan 1, 2014

  • SME-ICGCM
    Study of Ground Movement Over a Longwall Mine

    By A. W. Khair

    This paper presents an analysis of ground movements recorded from longwall operations in the Northern Appalachian region in West Virginia. The site chosen for the investigation was selected due to var

    Jan 1, 1987

  • SME-ICGCM
    Entry Design For Optimum Stability In A Multi-Seam Environment

    By Mohummad Akram

    Statistical analysis of multi-seam mining case studies demonstrated that geologic structure and lithological type and sequencing were predominant factors in entry failures. Finite element analysis was

    Jan 1, 1993

  • SME-ICGCM
    Stress And Stability In Coal Ribsides And Pillars

    By A. H. PH. D Wilson

    Compared to the rocks encountered in, say, metalliferous mining or tunnel drivage in igneous and metamorphic rocks, the strata associated with the coal measures are relatively soft. If excavations are

    Jan 1, 1981

  • SME-ICGCM
    Prediction of Inter-Strata Movements Above Longwall Faces (bade68bf-520f-401d-9d3a-43ba4395e61a)

    By Neil Styler

    This paper presents an analysis of measurements of inter-burden de- formations above six longwall faces. An attempt is made to demonstrate some correlation between the movements at the various sites,

    Jan 1, 1984

  • SME-ICGCM
    Updating the NlOSH Support Technology Optimization Program (STOP) With New Support Technologies and Additional Design Features

    By Thomas M. Barczak

    The initial Support Technology Optimization Program (STOP), Version 1.0, was released at the 19th Gmund Control Conference. This original program has since been updated to Version 2.3 which was releas

    Jan 1, 2001

  • SME-ICGCM
    Field Measurements Of Overburden And Chain Pillar Response To Longwall Mining (22054dce-c5fa-459f-94f1-b6ef58bd87bf)

    By Daniel W. H. Su

    This paper presents the results of an extensive geomechanical testing and monitoring program conducted at a longwall panel. The field program included the monitoring of roof caving sequence and mechan

    Jan 1, 1987

  • SME-ICGCM
    Extended Cut Out Distances In Continuous Miner Sections In South African Collieries

    By Ismet Canbulat

    The cut out distance in the continuous miner sections in South African collieries is limited to 12 m. However, this distance can be extended to 24 m by the permission of the Department of Mineral and

    Jan 1, 2000

  • SME-ICGCM
    Impacts of Longwall Mining on Hydrology, Soil Moisture, and Tree Health in Belmont County, Ohio

    By David Bartsch

    The Ohio Valley Coal Company (Ohio Valley) has operated the Powhatan No. 6 Mine in Belmont County, Ohio since 1972. Ohio University owns a 455-acre research farm over a portion of the Ohio Valley rese

    Jan 1, 2005

  • SME-ICGCM
    Design Of The Ventilation Shaft In The South Link Railway Tunnel Construction, Taiwan

    By Jay Keng

    During the construction of shaft on the fractured and weak rock strata, the stability of construction plays an important role. This study includes earth stress estimation, support method, and stabi

    Jan 1, 1988

  • SME-ICGCM
    Understanding and Optimizing the Performance of Passive Primary Support on Coal Mines

    By Anthony Spearing

    There are approximately 68 million rockbolts installed annually in underground coal mines in the USA (Tadolini and Mazzoni, 2006). The most utilized is the passive fully grouted resin rebar bolt, whic

    Jan 1, 2014