Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Recent Innovations for Slope Development

    By Tim Burgess

    Patton Mining, LLC and J.H. Fletcher Company recently collaborated and mechanized the sometimes hazardous, and always labor intensive, process of installing standing steel supports during the construc

    Jan 1, 2011

  • SME-ICGCM
    Rockbolting For Highly Stressed Roadways

    By Holger Witthaus

    The conditions of great mining depth and multi-seam¬longwalling require a special method of rockbolting, It can be described as a control loop which is based on the elements of planning, drivage and m

    Jan 1, 2000

  • SME-ICGCM
    Quality Management For Grouted Rockbolts

    By Dieter Wittenberg

    The successful extension of the applications in which rockbolts can be used in the German coalmining industry is, because of the very great raining depth combined with a high degree of stress in the n

    Jan 1, 2000

  • SME-ICGCM
    Screw Anchors for Ground Control

    By Frank Schmidt

    Due to changing geology, rib bolting is an ever-changing problem in ground control. With the economic status of the coal market, the need for safely increasing productivity in rib bolting is at an all

    Jan 1, 2013

  • SME-ICGCM
    Application Of Sliding Roof Bar Powered Support For Thick-Seam Coal Mining

    By Zhang Liandong

    Roof control in thick-seam mining has long been a difficult problem in mine design and coal mining. In the early 1980's, through ground control instrumentation and investigation the rules of r

    Jan 1, 1990

  • SME-ICGCM
    Stability And Stress Evaluation In Mines Using In-Seam Seismic Methods

    By E. M. Williams

    The U.S. Bureau of Mines is investigating the use of in-seam seismic methods to monitor stress-induced changes in coal near the working face of longwall mines. Seismic surveys performed through a long

    Jan 1, 1994

  • SME-ICGCM
    "Void Fill Techniques for Stabilizing Roof Conditions during LongwallShield Recovery"

    By Rusty Mchenry, Craig Dickerson, Robin L. Oldham

    "It has been proven that longwall faces can be moved safely and efficiently. However, abutment pressures and poor ground control conditions can halt operations and be hazardous to coal miners. Recentl

    Jan 1, 2015

  • SME-ICGCM
    Control Technology For Roof Drill Operators

    By Bob Thomas

    The roof drill operator productivity can be enhanced by the introduction of control technology The operators control station can be improved by considering human factors such as handle forces and cont

    Jan 1, 1999

  • SME-ICGCM
    Pillarless Longwall Mining For Multiple Seams

    By Victor V. Nazimko

    Longwall mining technology without interpanel pillars is feasible from a geomechanical point of view. A set of pillarless longwall layouts are proposed including tailentry pillar recovery, headentry p

    Jan 1, 1994

  • SME-ICGCM
    Mobile Roof Support For Retreat Mining

    By H. Gene Wilson

    Mobile Roof Supports (MRS) look similar to a longwall shield on crawler tracks. The MRS units offer a safe, productive method of extracting the 40% to 60% product left normally unrecovered in room and

    Jan 1, 1990

  • SME-ICGCM
    Safety and Productivity Innovations in Mechanized Bolting

    By Gregory Hinshaw

    Underground mine bolting machines have evolved since inception in the 1940's due to the need for increased safety and productivity. However, major design innovations historically came from change

    Jan 1, 1998

  • SME-ICGCM
    A Method for Quantitative Void/Fracture Detection and Estimation of Rock Strength for Underground Mine Roof

    By Syd Peng

    In designing a proper roof support system, one must know the features of roof geology in advance of mining. The drilling parameters obtained during normal roof bolt installation cycle can provide a l

    Jan 1, 2005

  • SME-ICGCM
    Case Studies Of Progressive Pillar Failure In Two Mines Using Wide Pillars

    By Hamid Maleki

    Results of geologic investigations, in-mine instrumentation, and numerical modeling are presented for two longwall mines in which pillars with large width-to-height ratios (8 to 9) are used. These inv

    Jan 1, 2000

  • SME-ICGCM
    Assessing Coal Bumps From Excess Energy in Finite Difference Models

    By Ryan Garvey

    A numerical investigation is made into unstable failures of coal pillars (i.e. coal bumps) using the finite difference software FLAC3D. A static energy balance is first derived to calculate the excess

    Jan 1, 2013

  • SME-ICGCM
    Design Considerations For Bump-Prone Longwall Mines

    Tailgate pillar and tailgate-face corner humps have been a major threat to longwall coal mines where hump-prone conditions exist. The yield pillar design concept, in which the longwall chain pillars a

    Jan 1, 1999

  • SME-ICGCM
    Staubbekampfung An Schildausbau In Bruchbaustreben (Combating Dust On Shield Supports On Longwall Mining)

    By Wilfried Ufer

    [1. Einführung in die Problematik 1.1 Die Bedeutung des Schildausbaus Seit fast 30 Jahren ist die Konkurrenzsituation auf dem Primärenergiemarkt der Bundesrepublik Deutschland durch einen von Erdöl

    Jan 1, 1984

  • SME-ICGCM
    Investigation of Fully Grouted Roof Bolts Installed Under In Situ Conditions (8fabb507-7dbd-4e7d-b9c9-518c3be86281)

    By Craig Compton

    The The National Institute for Occupational Safety ane Health (NIOSH) Pittsburgh Research Laboratory (PRL) is continuing to investigate the behavior of fully grouted roof bolts in the weak roof rock o

    Jan 1, 2005

  • SME-ICGCM
    Cable Supports For Improved Longwall Gateroad Stability

    By Stephen C. Tadolini

    Cable supports offer several advantages over traditional secondary support methods. Cable supports enhance stress redistribution to pillars and gob areas, minimize or eliminate timbers and cribs which

    Jan 1, 1993

  • SME-ICGCM
    Yielding Cement Roof Supports for Longwall Mining

    By Alan A. Campoli

    Fosroc continues as a leader in the development of cementitious technology for the mining industry. The considerable expertise accumulated in the development of the Fm cement line has been employed in

    Jan 1, 1997

  • SME-ICGCM
    3D FEM Simulation For Fully Grouted Bolts

    By Khaled Morsy

    Most of the available numerical codes simulating the reinforcing effect of fully grouted bolt are accomplished by a series of bar elements which are connected along their length to the host rock by sh

    Jan 1, 2004