Search Documents

  • CIM
    Assessment of Wall Control Blasting Practices at the Ekati? Diamond Mine

    By J. Peterson

    A review of blast designs and improved blasting practices at the Ekati??Diamond Mine is presented along with the results of three blast-monitoring experiments. Blast monitoring was undertaken to inves

    May 1, 2001

  • CIM
    Rail wear assessment techniques at FAST

    By Richard P. Reiff

    "The Facility for Accelerated Service Testing (FAST) program has been involved in numerous rail wear tests since its inception in 1976. A number of specialized tools have been developed to aid in asse

    Jan 1, 1988

  • NIOSH
    Three-dimensional time-lapse velocity tomography of an underground longwall panel

    By Kray Luxbacher, Mario Karfakis, Erik Westman, Peter Swanson

    Three-dimensional velocity tomograms were generated to image the stress redistribution around an underground coal longwall panel to produce a better understanding of the mechanisms that lead to ground

  • AUSIMM
    Thermal Modelling and Mitigation Measures for the Bogong Power Development

    By D Wimpenny

    The Bogong Power Development Project in Victoria, Australia involved the construction of a 15 m long mass concrete plug up to 9 m in diameter within the head race tunnel. The plug is critical to thepe

    Mar 8, 2011

  • DFI
    Advances in Desaturation of Sandy Soil to Mitigate the Liquefaction Hazard

    By Dhanaji S. Chavan, Thallak G. Sitharam

    "It is well known that sites comprising of saturated loose sand undergoes large deformations, due to liquefaction, during seismic shaking. To cope with this, different mitigation techniques such as vi

    Jan 1, 2017

  • AUSIMM
    Drilling Equipment for Difficult Coring Conditions A New Type Core Lifter and Triple Tube Core Barrel

    Considerable improvements in diamond drilling equipment have been made since the early 1950s. A recent drilling programme, however, at Williamtown, near Newcastle, carried out by the Joint Coal Board

    Jan 1, 1967

  • CIM
    Development of a 3D Modeling System For the Monitoring of the Daniel-Johnson Dam

    By Vincent Roy

    Numerous on going activities at the Daniel-Johnson Dam : ? Surveillance / monitoring ; ? Structural investigations & evaluation ; ? Injection work ; ? Crack mapping ; ? Instrumentation management

    Aug 1, 2013

  • NIOSH
    OFR-165-83 Development Of A Nondestructive Test Device For Friction Rock Supports

    By R. Lusignea

    A device has been developed for nondestructive testing the holding power of split tube friction rock supports. It operates by measuring the amount of decrease in internal volume when the support is fo

    Jan 1, 1983

  • CIM
    A Novel Separation Process for Detoxifying Cadmium-Containing Residues from Zinc Purification Plants

    By Diankun Lu, Ganfeng Tu, Edouard Asselin, Feng Xie

    A novel separation process for detoxifying cadmium-containing residues arising from zinc hydrometallurgical processes has been developed. An initial investigation indicated that a high concentration o

    Jan 1, 2014

  • CIM
    Prediction of Thermodynamic Properties of Si-P and Si-Fe-P Alloys for Solar Grade Silicon Refining Com 2015 - 54th Annual Conference of Metallurgists Held in Conjunction with AMCAA - America's Conference on Al Alloys

    By A. McLean, W. Q. Chen, W. Yan, M. Barati, Y. D. Yang

    In order to maximally remove the harmful impurities phosphorus and reduce the loss of valuable elements from Si-based alloy for production of solar-grade silicon, thermodynamic properties of the Si-ba

    Jan 1, 2015

  • DFI
    Design And Construction Imposed By Unique Geological Conditions In Paris, Milan And London ? Summary

    By Chris Harnan

    This paper describes the geology of three European cities and outlines how the geology has lead to the development of specific foundation construction techniques. Comparative tables of techniques

    Jan 1, 2000

  • CIM
    Rehabilitation of Tailings Areas of Uranium Mines

    By A. J. Vivyurka

    "This is a talk about the experiences that Rio Algom Mines Ltd. has had in the Elliot Lake uranium area trying to make the tailings more compatible with the surrounding environment. To get a better id

    Jan 1, 1975

  • IMPC
    The Electrokinetic Properties and Flotation Behavior of Quartz And Feldspar in the Presence of Polymeric Surfactants (574d0074-57a9-414d-9659-f9ad28b8b802)

    By Montaser S. EL Salmawy, Takahide Wakamatsu, Eishi Kusaka

    "The effect of ethoxylation of long chain alcohols on the quartz and feldspar flotation behaviors was investigated for surfactants of the octylphenol polyoxyethylene family. The tests were carried out

    Jan 1, 2003

  • SME
    Boart Longyear 4200 Surface Drill Features Improved Safety

    Safety is the No. 1 concern of any drill contractor or mine operator. Everyone in the industry knows a safe site helps stabilize operational costs and enables higher productivity. When it comes to ex

    Jan 1, 2009

  • AUSIMM
    Communication - The Misima Story

    Misiman society is matrilineal and despite relatively long contact with Europeans and mining, it retains its traditional consensus style of decision making. Many Misimans at least understand Engl

    Jan 1, 1991

  • ABM
    Determinação Do Fator De Contração Para Os Aços Peritéticos

    By Afrânio Márcio Costa

    Placas lingotadas continuamente, não obstante atendam a requisitos como composição química, conteúdo de inclusões, aspectos macro e micrográficos, podem ser desclassificadas por falta de conformidade

    Aug 17, 2017

  • SAIMM
    Assessment of mass modulus of a weathered argillaceous rock

    By Chris M. Haberfield, Neil D. Benson

    The assessment of overall modulus (or stiffness) of a fractured weak to moderately strong rock mass is a key parameter in the design of civil engineering works in these materials. It also provides th

    Jan 1, 2003

  • SME
    Application of arithmetic progression to haul road geometric design - SME Transactions 2012

    By A. D. Ajak

    A complete mining cycle involves digging, loading, hauling and dumping of the materials. Moving the ore from the pit to the crusher or to the waste dump requires access routes, which are termed haul r

    Jan 1, 2012

  • NIOSH
    OFR-43(3)-77 Mine Fire Protection For Underground Fuel Storage And Transfer Area - Introduction

    It is not uncommon to find large quantities of combustible materials in underground metal and non-metal mines. Support timber is the predominant combustible material. Spontaneous combustion, welding a

    Jan 1, 2011

  • NIOSH
    RI 9386 - Modeling In Situ Copper Leaching in an Unsaturated Setting

    By Michael J. Friedel

    The permeability and flow capacity in unsaturated media are investigated by the U.S. Bureau of Mines for application to in situ copper leach mining. Moisture retention properties are derived and combi

    Jan 1, 2010