Search Documents

  • AUSIMM
    Environmental Costs (and benefits) of Planning and Developing Mines and Quarries

    The consideration of environmental constraints and issues is a fundamental component of all stages of planning, development, operation and decommissioning mining and quarrying projects. Provision n

    Jan 1, 1990

  • SAIMM
    ISACONVERT - Continuous Converting Of Nickel/PGM Mattes - Synopsis

    By M. L. Bakker

    The ISASMELT? top submerged lance (TSL) bath smelting process was developed in Mount Isa, Australia by Mount Isa Mines Limited (now a subsidiary of Xstrata plc) during the 1980s. By the end of 2011, t

    Jan 1, 2011

  • NIOSH
    OFR-40(1)-81 Coal Mine Equipment Population Characterization And Protective Structure Status - Volume I

    By Gary R. Gavan

    This report presents the results of a research project that gathered detailed information on the composition of the population of mobile equipment used in U.S. coal mines. A computerized data bank con

    Jan 1, 1978

  • AUSIMM
    Geometallurgical Challenges of Namakwa Sands û A South African Titanium-Zirconium Heavy Minerals Mine

    By A Rozendaal

    Namakwa Sands, a heavy minerals beneficiation business situated along the west coast of South Africa, is a major producer of titanium slag, pig iron, ceramics quality zircon and rutile concentrate to

    Jan 1, 2008

  • SME
    Acquiring Capital Funds for Coal Mining

    By Dale S. Hursh, William A. Brooks

    Introduction US dependence on external energy sources is dangerous because of unstable political situations existing in key energy exporting countries. So, recent national energy policies call for

    Jan 9, 1982

  • AUSIMM
    The Opportunity Cost of Homogenising Concentrator Feed

    Recently published extensions to the mill-dump cutoff grade theory for joint open pit-concentrator operations lead to equations that must be simultaneously satisfied as a necessary condition for an op

    Jan 1, 1981

  • AUSIMM
    The Application of Surface Combustion.

    FROM time to time articles have appeared in the technical press on the interesting subject of surface combustion. The theoretical part of the problem has, for practical purposes, received ample consid

    Jan 1, 1915

  • NIOSH
    IC 6689 Development Of Sand And Gravel Deposits ? Introduction

    By J. R. Thoenen

    This circular is the second of a series presenting methods employed in solving the technical problems encountered in the production of sand and gravel. The first paper3 discussed the methods use in pr

    Jan 1, 1933

  • SAIMM
    A comparison of models for the recovery of minerals in a UG2 platinum ore by batch flotation

    By B. K. Loveday, N. V. Ramlall

    A study was carried out to evaluate various batch flotation models for the recovery of minerals in a UG2 platinum ore. The major minerals in a UG2ore can be grouped as platinum group minerals, chromit

    Jan 1, 2015

  • NIOSH
    IC 8212 Subsurface Disposal Of Industrial Wastes In The United States (c80b6827-b919-45ee-83ab-db0c746b2c5d)

    By Erle C. Donaldson

    A study of subsurface waste disposal in the United States shows that in eight States a wide variety of industrial wastes are being injected into formations ranging in age from Precambrian to Recent. M

    Jan 1, 1964

  • SAIMM
    A study of ICT diffusion into South Africa’s platinum mining sector

    By T. Z. Mugodi, D. R. Fleming

    Information and Communications Technology (ICT) is defined as ‘The goods and services that support the electronic display, processing, storage and transmission of information’. Early in 2002 the So

    Jan 1, 2003

  • AUSIMM
    The Barewood-Hindon Vein System: A Regionally Extensive Normal Fault-Hosted Gold Deposit in the Otago Schist

    By D Craw, J Youngson

    Recent exploration for mesothermal gold deposits in the Otago Schist has focussed largely on extensions of, or analogies to, the reverse fault-hosted Hyde-Macraes Shear Zone deposit. Abundant normal f

    Jan 1, 2002

  • SME
    8 M Diameter 7 KM Long Beles Tailrace Tunnel (Ethiopia) Bored And Lined In Basaltic Formations In Less Than 12 Months

    By Antonio Raschillà

    On the 2nd of June 2007 SELI S.p.A. started the excavation of Beles Tailrace Tunnel (Ethiopia). The new 8,07 m diameter DS Universal TBM utilized for the tunnel excavation was manufactured by SELI S.p

  • SAIMM
    Production Of Titanium Metal Powder By The HDH Process - Synopsis

    By X. Goso

    Laboratory-scale tests were conducted at Mintek for the production of titanium powder from particulate Kroll sponge by the hydrogenation-dehydrogenation (HDH) process. The aim of this work was to prod

    Jan 1, 2011

  • SAIMM
    Laboratory Investigations Of The Electrical Resistivity Of Cokes And Smelting Charge For Optimizing Operation In Large Ferrochrome Furnaces

    By Krogerus. H., P. Jokinen, T. Lintumaa

    Keywords: Pyrometallurgy, furnace, coke, smelting charge, optimization, ferrochrome The main consumer of ferrochrome is stainless steel production. Stainless steel must maintain a reasonable pric

    Jan 1, 2006

  • AUSIMM
    Mineralization in Island Arcs with Particular Reference to the South-West Pacific Region

    Two outstanding features of the world's young orogenic belts are their very consistently developed suites of volcanic rocks and, it is now recognized, the rather distinctive types of mineralizati

    Jan 1, 1978

  • SAIMM
    Recent Improvements In The Kumera Steam Dryer

    By J. Talja

    Keywords: drying, steam drying, concentrates, copper, lead During the past twenty years steam drying has become a prominent technology for drying of non-ferrous metals concentrate. This is mainly

    Jan 1, 2011

  • NIOSH
    IC 8212 Subsurface Disposal Of Industrial Wastes In The United States

    By Erle C. Donaldson

    A study of subsurface waste disposal in the United States shows that in eight States a wide variety of industrial wastes are being injected into formations ranging in age from Precambrian to Recent. M

    Jan 1, 1964

  • SME
    Snow Tunneling at the South Pole

    By John H. Wright

    The United States Antarctic Program (USAP), through its principal support contractor Raytheon Polar Services Co. (RPSC), has recently completed a three-year project comprising nearly 936 m (3,071 ft)

    Jan 1, 2002

  • SME
    Recycling Power Plant Fly Ash And Its New Application For Construction Materials - Preprint 09-037

    By N. S. Kim

    Economically favored Cr and Cu leaching out process from spent power plant fly ash (PPFA) had been investigated. PPFA, bearing of C, S, V, Ni, Cu and Cr, has been widely used as an assistant fuel in c

    Jan 1, 2009