Search Documents

  • SAIMM
    Measuring The Impact Of HIV And STIs In A Community In A Coal Mining Town, Mpumalanga, South Africa

    By H. Hurkchand

    Background: A cross-sectional study was conducted in November2001 to establish the prevalence rates of Human Immunodeficiency Virus (HIV) and sexually transmitted infections (STIs) (Chlamydia trachoma

    Jan 1, 2005

  • AUSIMM
    Velvet underground exhumed – discovery and development of a new mining front at the Kanowna Belle gold mine

    By G Tripp, G Lorusso

    The Velvet gold orebody (153 Koz Au) is located near the Kanowna Belle gold deposit in the Boorara Domain of the Kalgoorlie Terrane, a subdivision of the Archaean Eastern Goldfields Superterrane (Swag

    Sep 20, 2017

  • SAIMM
    Thermophilic Mineral Bioleaching Performance: A Compromise Between Maximizing Mineral Loading And Maximizing Microbial Growth And Activity

    By A. Sissing

    Paper written on project work carried out in partial fulfilment of M.Sc. (Chemical Engineering) degree Thermophilic bioleaching, conducted at temperatures in excess of 65°C, provides considerable b

    Jan 1, 2003

  • AIME
    Industrial Section (f33ce896-e508-4b8b-84b6-1b4db908268b)

    Beyer Barometric Condenser The Ingersoll-Rand Co. is now offering to the trade complete steam­condensing plants for all service conditions. This equipment includes the Beyer barometric condenser, for

    Jan 8, 1916

  • SME
    Factors Bearing On The Interpretation Of In Situ Testing Results

    By D. J. Dodds, W. L. Schroeder

    INTRODUCTION The plate loading test is a simple, useful tool in rock mechanics. The test consists of applying load to a rock surface and noting the resulting deflections. Plate loading tests are ty

    Jan 1, 1974

  • AUSIMM
    A novel approach to evaluating gravity pre-concentration amenability utilising the hydrodynamics of dense liquids in inclined channels

    By J Zhou, T D. McGrath, K P. Galvin, C P. Lowes, J J. Eksteen

    Pre-concentration of low grade ores can improve the economic and environmental sustainability of an operation significantly, with opportunities for implementation ranging from run-of-mine to mill disc

    Nov 10, 2020

  • AUSIMM
    Undercutting to Surface Breakthrough – Cadia East Panel Cave (Stage 1)

    By B Mobilio, M Secheny, J Rachocki, G B. Sharrock, A Jäger, J L. Lett, I Brunton, G W. Capes

    Establishment of the Cadia East Panel Cave Stage One (PC1S1) commenced with the firing of the first bell in early 2011. Production began with the completion of the undercut in May 2014. PC1S1 used a p

    May 9, 2016

  • AUSIMM
    Mineralization in the Cobar-Nymagee Province and Its Significance

    Contents.SummaryIntroductionSituation, climate, topographyHistorySize of depositsPrevious investigationsGeological History of AreaMap compilationHistorical summaryNature and Significance of Granitic R

    Jan 1, 1950

  • CIM
    Belt conveyor booster drives

    By J. A. Stewart

    "A common problem in the mining industry involves the overloading of established conveyor systems. This overloading can have a number of causes, such as new production technology or a changing market

    Jan 1, 1982

  • CIM
    Continued Development of Copper Flotation Control at the Kidd Creek Concentrator (af11f3f9-89ef-4f91-815b-39411f77be72)

    "Automatic flotation control in varying degrees of sophistication is practiced at a number of concentrators throughout the world. Practically, the variable conditions in the flotation circuit and the

    Jan 1, 1983

  • DFI
    Underpinning With Steel Pipe Piles

    By Pasi Korkeakoski

    There are about 400 multi-storey buildings founded on wooden piles in the city centre of Turku in Finland. Soil conditions are variable from hard rock to very soft clay. Due to the soil conditions and

    Jan 1, 2000

  • DFI
    Rapid Lateral Load Testing Of Deep Foundations

    By Dan A. Brown

    This paper describes a method of conducting rapid lateral loading tests of deep foundations in which the load is applied to the foundation with a time duration of less than one second. For purposes of

    Jan 1, 2007

  • AUSIMM
    The Century Discovery, Queensland, Australia - Is Exploration Ever Complete?

    The Century zinc-lead-silver deposit has a geological resource of 118 million tonnes averaging 10.2% zinc, 1.5% lead and 36 g/t silver. It lies approximately 250 krn NNW of Mt Isa in NW Queensland, Au

    Jan 1, 1995

  • NIOSH
    OFR-63-77 Feasibility Study Of A Differential Current Ground Fault Or Leakage Current Sensor For Direct Current Offtrack Machines - 1.0 Introduction

    By Robert R. Perron

    The U.S. Bureau of Mines is engaged in many diverse programs fur improving mine safety. One area of interest to the Bureau is new and improved means for minimizing the hazards of accidental gas igniti

    Jan 1, 1976

  • SME-ICGCM
    Mining Geotechnical Benchmarking

    By Vincent A. Scovazzo

    Benchmarking is a business management process that seeks improvement through the study and reapplication of practices conducted by industry leaders. This discussion presents objectives and organizatio

    Jan 1, 2000

  • AUSIMM
    A Portable Vaccum Pump and Buchner Filter for Stream Sediment Sampling

    Collecting the clay fraction of active stream sediment from a flowing stream for geochemical analysis i a difficult process. One either takes a sample of dry fine-grained sediment from the stream bank

    Jan 1, 1969

  • SME
    Evaluation Of High-Temperature Disposable Filter Elements In An Experimental Underground Mine

    Filtration systems with disposable filter elements (DFEs) are used in the underground coal mining industry to control particulate matter emissions from diesel-powered permissible and nonpermissible co

    Jan 1, 2011

  • CIM
    Deep Bed Thickener Operation at the EKATITM Diamond Mine

    By T. G. Paradis, C. A. Mohns

    "This paper summarizes the Wren CAT (Clarifier and Accelerated Thickener) deep bed thickener operation at the EKATITM Diamond Mine in Canada’s Northwest Territories. EKATITMs’ thickener project is pre

    Jan 1, 2000

  • CIM
    Galore Creek Project

    Project Located in northwestern British Columbia 70km West of Cassiar Highway Galore Creek Project and Road Access Corridors Designated For Mineral Development in Stikine-Cassiar Land Resource Manag

    May 1, 2006

  • AUSIMM
    The Role of Cost Estimating in Mine Planning and Equipment Selection

    The objective of a mine planning exercise is to plan a safe mine that maximises net present value (NPV) for the project. Two primary elements are key to design of a mine plan optimised to maximise pro

    Dec 6, 2010