Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Kelsey Centrifugal Jig Implementation at Namakwa Sands for Zircon Recovery from Quartz Rejects

    By P V. A van der Westhuyzen

    Namakwa Sands is a heavy minerals mining and beneficiation business in the Exxaro Sands Division, and operates along the West Coast of South Africa (see Figure 1). The business encompasses mining, min

    Oct 5, 2011

  • AUSIMM
    Feasibility Study Estimation of In-Situ Resources and Recoverable Ore Reserves for the Boddington Gold Mine

    By El-Ansary M

    Estimation of in-situ resources and recoverable ore reserves for the Boddington Gold Mine feasibility study was done by applying an essentially "classical" ore reserve method. This relied completely

    Jan 1, 1987

  • AUSIMM
    Excavating an Underground Primary Fan Chamber that is Adjacent to a Fully Operational Primary Fan in PT Freeport Indonesia's Grasberg Block Cave Mine

    By P Wahyono, H Vega, S Riza, P Vergara, P Gonzalez-Carbonell

    PT Freeport Indonesia (PTFI), operating in the Ertsberg Mining District in the Province of Papua, is developing the Grasberg Block Cave copper-gold mine. The site aims to output 160 000 t/d and will b

    Jul 1, 2013

  • AUSIMM
    Changing Restoration Priorities in the 21st Century – Opportunities for Novel Ecosystem Design in Mine Closure

    By P Audet, D Doley

    The mining industry often embraces mine closure criteria that require the reinstatement of predisturbance or even presettlement (ie historic) ecosystems. However, the extent and severity of disturbanc

    Jul 16, 2014

  • AUSIMM
    The coalmine roof rating – an update in its calculation and mechanistically why it works

    By M Colwell

    The Coal Mine Roof Rating (CMRR) is a rock (roof) mass classification (RMC) system/index that was originally developed by the United States Bureau of Mines (USBM) for aspects of underground coalmine g

    Nov 29, 2022

  • AUSIMM
    Understanding Mineralisation Controls – A Case Study of the Chesney Deposit

    By J Channell, G Phillips

    "The Chesney deposit, located 4 km south-east of Cobar consists of three copper-gold rich shoots that lie within a larger, copper dominant lode. A fourth gold rich shoot is located adjacent to the mai

    Aug 18, 2014

  • AUSIMM
    Assessment of climate risk in the Australian mining industry

    By M Allen

    By its nature, the mining industry is energy and emissions intensive. In the future, the world will still require the outputs of mining but the industry will need to adapt to the low emissions economy

    Jul 25, 2018

  • AUSIMM
    Critical Assessment of Machine Learning Algorithms as Estimation Techniques for a Polymetallic Ore Deposit

    By D Misra, R Ganguli, S Bandopadhyay

    The objective of this paper is to assess the accuracy and applicability of recent state-of-art methods such as the machine learning algorithms (MLA) for mineral resource estimation. Conventional metho

    Sep 26, 2011

  • AUSIMM
    Your Career ù Are You an Overnight Dot.Com or a Long-Term Growth Option?

    The current boom being experienced by mining, coupled with a shortage of professionals, will mean those in the industry will have many choices. It may be easy to become carried away and run with the h

    Jan 1, 2004

  • AUSIMM
    The practicalities of effective stress measurement in rock

    By I Gray

    This paper examines the practical limitations that affect the measurement of stress in rock. As most rock stress measurement is conducted through the invasive process of drilling a hole in a rock mass

    Nov 30, 2018

  • AUSIMM
    Presentation of Certificate of Honorary Membership to Sir Ian McLennan, K.C.M.G., K.B.E.

    By W. M. LONIE

    Address by the President of the Institute (Mr W M Lonie) in making the presentation of the Certificate of Honorary Membership to Sir Ian McLellan, K.C.G.M, K.B.E. Address by Sir Ian McLellan after acc

    Jan 1, 1979

  • AUSIMM
    Predicting Finished Product Properties in the Mining Industry from Pre-Extraction Data

    By J E. Everett

    An essential requirement of product quality control in the mining industry is to be able to reliably predict key quality properties of finished product from the data available before the extraction of

    Sep 5, 2011

  • AUSIMM
    Global Lessons for a Local Problem – Rehabilitation Bonds and Victoria’s Latrobe Valley Coalmines

    By M L. Cramer, N P. Wines

    "On 9 February 2014, bushfire embers landing on exposed coal in a disused pit at the Hazelwood mine in Victoria’s Latrobe Valley ignited a coal fire that burned for 45 days. The fire was the largest a

    Jun 28, 2016

  • AUSIMM
    Exploration and Mining Unified through Seismic Imaging

    By J Dwyer, G Turner, D Pridmore, M Urosevic

    Due to their ability to produce high-resolution images of the subsurface to great depths, seismic surveys provide critical inputs to almost all oil and gas exploration projects. However, with some not

    Nov 4, 2015

  • AUSIMM
    Aligning Resource Estimates with Mine Planning

    By D Kentwell

    A resource model serves two main purposes depending on the stage of a project. The first is to provide an early indication of likely tonnages and grades at certain cut-offs so that decisions can be ma

    Nov 24, 2014

  • AUSIMM
    The Superpit Schedule Model – A Time-efficient Data-driven Estimation for Short- and Medium-term Planning

    By T Berryman, C Adams, L Griesel, C Buxton

    The Kalgoorlie Consolidated Gold Mines (KCGM) schedule model is used for short- to medium-term planning and scheduling at the Fimiston Open Pit Mine (the Superpit). The model bridges the gap between g

    Aug 18, 2014

  • AUSIMM
    Lessons learnt from six mine disaster case studies to improve audit and assurance and ESG

    By A Atkins

    Six recent case studies were selected based on the eight main causes of mine disasters (Table 1; Quinlan, 2014) and where credible information sources, such as Royal Commission Reports, Coronial Inves

    May 5, 2022

  • AUSIMM
    Enhanced fine particle recovery with the Concorde Cell

    By P G. Bourke, A Yáñez, G J. Jameson, N M. L Kupka

    The kinetics of fine and ultrafine particles in conventional mechanical flotation cells are limited (Feng and Aldrich, 1999; Trahar, 1981; Wang et al, 2016). Accordingly, even limited recoveries with

    Aug 24, 2022

  • AUSIMM
    Safety of a Tailings Storage Facility against Dam Instability

    By D Veneziano, J Van Dyck, R Snow, W Pytel, O Zanoli

    Best practice standards generally recommend assessment of the environmental and societal risks posed by tailings storage facilities, but they rarely specify how the analysis should be made. As a case

    Jul 27, 2015

  • AUSIMM
    Australia’s hydrogen export in the form of embedded mineral derivatives

    By R Daiyan, G Burge, M Haider Ali Khan

    Australia’s mineral and metal exports have a substantial carbon footprint, twice that of its domestic emissions, mainly due to fossil-fuel-dependent downstream processes like processing into secondary

    Sep 1, 2024