Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    An analysis of impact of weak rock formation on mining-induced deformation of rock slope

    By A Sainoki, D Fukuda, K Shioya, C Zhang, M Sharifzadeh, T Yamaguchi, S Saydam, J Kodama, C A. Amagu, Y Fuji

    In an open pit mining, ensuring stability of rock slope has been one of the major challenges. As the instability of rock slopes can results in slope failures; consequently, endanger the lives of worke

    Nov 29, 2022

  • AUSIMM
    Geochemical Characteristics of River Deposited Mine Wastes and Associated Contact Waters Downstream of the Ok Tedi Mine, Papua New Guinea ù Implications for ARD Management

    By H Kundapen, B R. Bolton, H Davies

    The Ok Tedi porphyry copper-gold mine is located in the Star Mountains of Western Province, Papua New Guinea. Open-cut mine commenced in 1984 and is due to cease around 2010. The mine produces a total

    Jan 1, 2003

  • AUSIMM
    Concentrator design – standard engineering practice versus geometallurgy and simulation

    By G Harbort, K Quan

    Traditional engineering practice for concentrator design uses a mixture of risk minimisation options and capital minimisation approaches. Often this is based on the preferences and experiences of the

    Sep 11, 2017

  • AUSIMM
    Dilution, Ore Grade and Blast Movement Calculation Model

    By I C. Carrasco, V G. Mirada, J F. D Domingo, F S. Leite

    This paper investigates ore loss and dilution produced by rock movement in bench blasting. A total of four blasts, in which electronic detonators have been used, were monitored in Cobre Las Cruces Ope

    Aug 24, 2015

  • AUSIMM
    Modern X-Ray Diffraction Techniques as a Fast Industrial Analysis Method for Iron Ores - From Exploration to Process Control

    By L Gobbo

    X-ray diffraction (XRD) provides useful information about the composition of an ore sample in terms of quantification of crystalline phases and amorphous content. The use of new, fast detection system

    Jan 1, 2009

  • AUSIMM
    Effective Immersive Visualisation Systems for Mining Applications and Beyond

    By E Widzyk-Capehart, T Bednarz, O Daud, N Cutmore

    The interest of industry, in particular future mining, is pointing towards the use of novel visualisation systems to improve the operational efficiency of user interfaces. While the technologies used

    Nov 4, 2015

  • AUSIMM
    Managing Geological Complexity - Beta Hunt Mine, Kambalda, Western Australia

    By K P. Crameri

    The Beta Hunt orebody is situated on the south western limb of the Kambalda dome. It is one of the nickel occurrences in the area which fall into the category of æKambalda Style OrebodiesÆ. These oreb

    Jan 1, 2006

  • AUSIMM
    Modelling the Impact of Flash Flotation from Batch Cell Flotation Tests Using Limn

    By P Holtham, R Dunne, D Stoll

    Flash flotation is a process designed to remove coarse, liberated, fast floating minerals from hydrocyclone underflow. Irrespective of liberation, coarse particles would normally remain in a grinding

    Oct 29, 2012

  • AUSIMM
    Design and Construction for the Widening of the M2 Norfolk Twin Tunnels

    By A L. de Ambrosis, S J. Clarke, R Bertuzzi, J Redelinghuys

    The M2 Upgrade Project involved widening 15 km of the existing M2 Motorway, which is a key route in Sydney’s road network. The Norfolk Twin Tunnels in North Epping convey traffic over a 460 m length o

    Sep 17, 2014

  • AUSIMM
    Optimisation of cemented rock fill strength for open stope support

    By J Player, R de Vries, E Villaescusa, H Saw, R Hassell

    The use of cemented rock fill (CRF) for support of open stope walls has increased in the Australian underground mines operations over the last five years due in part to its low capital cost. In open s

    Oct 16, 2017

  • AUSIMM
    Observations on the Behaviour of a Gold Tailings with Hypersaline Pore Fluid

    By D Reid

    Characterisation of non-plastic segregating tailings presents a number of challenges: the material cannot typically be sampled in an undisturbed state, remoulded samples exhibit different behaviour to

    Jul 27, 2015

  • AUSIMM
    Cobalt, copper tailings and the circular economy – a case study from the Capricorn Copper Mine, north-west Queensland minerals province

    By L Nicholls, A Parbhakar-Fox

    Reprocessing Queensland’s historical copper tailings for critical minerals is an opportunity to circularise the state’s mining industry by converting waste liabilities into assets. Mine waste valorisa

    Aug 2, 2023

  • AUSIMM
    The Use of Geotechnical Instrumentation to Optimise an Engineered Mine Design at Beaconsfield Gold Mine, Tasmania

    By P B. Hills, R J. Walton

    Geotechnical instrumentation has been implemented as a key step for monitoring and optimising an engineered mine design for managing seismicity at the Beaconsfield Gold Mine. Measurements of displacem

    Jan 1, 2008

  • AUSIMM
    Developing Process Control Standards for Optimal Plant Performance at PanAust Limited

    By D Baas, D Bennett

    This paper describes how Brisbane-based PanAust Limited develops process control strategies that are implemented at all operations and are used in functional descriptions for plant upgrades and new pr

    Sep 1, 2014

  • AUSIMM
    The use of Geometallurgy to Estimate Comminution Parameters within Porphyry Copper Deposits

    By G J. Harbort, K Lam, C Sola

    The relationship between the geology of porphyry copper deposits and their processing performance is an area of interest. Being able to predict comminution properties of the ore from physical characte

    Sep 29, 2013

  • AUSIMM
    Geothermal gradient determination for ventilation and air conditioning modelling at Malmberget Mine

    By F K. R Klose

    Malmberget is a sublevel caving mine owned and operated by Luossavaara-Kiirunavaara Aktiebolag (LKAB), a Swedish state-owned iron ore mining company, in northern Sweden. The mine has an annual iron or

    Oct 12, 2022

  • AUSIMM
    Mine to mill study – Bond Work index as factor for intrusive and non-intrusive rock type

    By W F. E Ouedraogo

    This study data has been collected on a three-month period from November 2020 to January 2021 and based on three different pits: Vindaloo Main, Vindaloo Central and Bouere. Both pits having specific g

    Jun 22, 2022

  • AUSIMM
    Landform Design for Pilbara Mine Site – Why Plan and Design Waste Rock Dumps for Closure Based on Site-specific Conditions?

    By G Hancock, A Kemp, I Taylor

    The mine site is situated south east of Port Hedland in the Pilbara region of Western Australia. A detailed engineering design was undertaken for six irregularly shaped waste rock dumps at the site. T

    Jul 16, 2014

  • AUSIMM
    Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming

    By Y Li, S Ramazan, E Topal

    A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or t

    Nov 24, 2014

  • AUSIMM
    Closure Planning Lessons Learnt from the Century Mine

    By J Crosbie, M Lord, R Bitencourt, P Defferrard

    The MMG Century mine, which is the largest zinc/lead mine in Australia, began operating in 1999 and ceased mining from the open pit in July 2015, with processing completed in early 2016. Closure plans

    Jun 22, 2016