Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Application of Block Caving System in the Tongkuangyu Copper Mine

    By Song Yongxue

    During the design and operation stages of a block caving project, a large amount of research and development work has been undertaken in the Tongkuangyu Copper Mine. This paper presents the research a

    Jan 1, 2000

  • AUSIMM
    Sampling Systems for Process Control and Metallurgical Accounting

    By F F. Pitard

    The optimisation of a metallurgical plant requires two kinds of sampling systems. The first provides samples to follow process changes, so in due time actions to maintain key parameters within pre-est

    Jul 29, 2014

  • AUSIMM
    Capital Expenditure Modelling for Strategic Mine Scheduling

    By L Blackwell

    Strategic mine scheduling is an industry best practice for increasing the long-term value of mining operations and supply chains. The application of optimisation technology such as mixed integer linea

    Nov 24, 2014

  • AUSIMM
    Building AsiaÆs Latest Hard Rock Mine

    By T J. V Duffy, L H. D Siahaan, P G. Albert

    G-ResourcesÆ Martabe Mine in North Sumatra, Indonesia, is a US$700 M world-class and world-scale operation in a country which, with a few notable smaller scale exceptions, has had no significant hard

    Nov 20, 2012

  • AUSIMM
    How to select appropriate instrumentation to safeguard TSFs against credible failure modes

    By P J. Chapman

    Recent catastrophic failures of tailings storage facilities (TSFs) continue to highlight the need for a detailed understanding of failure modes and the defences that are in place within the design to

    Jul 1, 2021

  • AUSIMM
    Prokaryotic Arsenic Metabolism ù Roles in Arsenic Cycling and Bioremediation

    By J M. Santini, I C. A Streimann

    Arsenic is a naturally occurring element in the environment and is toxic to biological systems. Arsenic can exist in the environment in the following redox states, arsenite (+3), arsenate (+5), arsine

    Jan 1, 2004

  • AUSIMM
    Understanding the Mechanisms That Can Cause Sample Bias

    Computational models are very useful for studying many of the physical mechanisms which can cause sample bias. Within such models we can predict the trajectories of all individual particles and thereb

    Mar 1, 2010

  • AUSIMM
    Real-Time Online Analysis of Iron Ore, Validation of Material Stockpiles and Roll Out for Overall Elemental Balance as Observed in the Khumani Iron Ore Mine, South Africa

    By D Matthews

    With the increasing demand for quality-specific ores, coupled to the reality of even more complex minable iron ore reserves, there is a growing need for real-time online material analysis of plant fee

    Jul 11, 2011

  • AUSIMM
    Phosphorous Removal from Iron Ore with a Low Temperature Heat Treatment

    By R R. Lovel, G J. Sparrow

    Currently there are large reserves of good quality iron ore near to existing infrastructure that are not being developed because the phosphorous levels are above acceptable market specifications. Sinc

    Jan 1, 2009

  • AUSIMM
    Aluminothermic production of silicon using different raw materials

    By M Zhu, G Tranell, N Simkhada, K Jakovljevic, M Wallin

    Silicon is a vital element in many products today, such as electronic components, solar devices, high-quality alloys, and many others. The growing global demand highlights the need for the development

    Jun 19, 2024

  • AUSIMM
    The Testing of Autogenous Grinding in Laboratory and Pilot Scale and the Design of Full Scale Comminution Circuits

    By Morsky P, Kalapudas R, Natunen H, Virtanen M

    The development of autogenous grinding modification in Outokumpu, known with the name 'Outogenius Comminution', was 'reversed'. At first the metallurgists studied and tested tens

    Jan 1, 1993

  • AUSIMM
    Understanding the Susceptibility of the ZA-27 Zinc Base Alloy to mAcrosegregation and Inverted Pipe Formation

    By Nava-Vasquez E, Torres-Torres J, Mendez-Nonell J

    The ZA-27 zinc base alloy was poured into cylindrical moulds and solidified under different conditions ie normal freezing and unidirectional freezing. In addition a cylindrical ingot with rheocast m

    Jan 1, 1993

  • AUSIMM
    Identifying and Dealing with Outliers in Resource Estimation

    By C De-Vitry

    In skewed distributions seen in many geochemical data sets, samples at the extreme ends of the distribution are often termed ‘outliers’. Samples considered as outliers can often make exploratory data

    Aug 18, 2014

  • AUSIMM
    Remediation of Wall Failure at Kalgoorlie Consolidated Gold Mines’ Golden Pike Cut-back 2016

    By J Darbritz

    "This paper details the events leading up to a slope failure that occurred at Kalgoorlie Consolidated Gold Mines (KCGM) and the remediation method executed using rope access specialists.n January 2016

    Nov 15, 2016

  • AUSIMM
    Development Strategy of the Trident Underground Gold Mine

    Avoca Resources LimitedÆs Higginsville Gold Project has a resource base of over 1 300 000 oz of gold. The Trident underground mine, which forms the basis of the project development, has a resource bas

    Jan 1, 2008

  • AUSIMM
    The MTM copper process

    By R W. Shaw

    The MTM Process targets treating lower grade and/or problem concentrates that are not attractive to smelters. The process has been developed at laboratory scale for copper and is based on a related de

    Aug 24, 2022

  • AUSIMM
    Implementing and Improving the Mine Plan at the Mt Wright Project

    By D MacKay

    The Mt Wright Project is located near the town of Ravenswood in North Queensland and is operated by Carpentaria Gold – a wholly owned subsidiary of Resolute Mining Limited. Underground Development of

    Mar 21, 2011

  • AUSIMM
    Integrating Community-Level Indicators of Well-Being into Future Collaborative Mine Planning

    By J Shandro

    This paper stems from recent multidisciplinary research between mining engineering and health researchers at the University of British Columbia and the University of Victoria, Canada. It considers the

    Nov 22, 2011

  • AUSIMM
    The Perseverance Gold Copper Deposit – A New Peak Mines Challenge

    By B Taylor

    The Perseverance deposit is the most southerly known economic copper/gold deposit within the Cobar gold field. The deposit is situated approximately 12 km to the south-southeast of Cobar and is essent

    Aug 22, 2011

  • AUSIMM
    The Wonawinta Silver Project – Value Engineering at Work

    By P G. Greenhill

    The Wonawinta silver project near Cobar in NSW is under development by Cobar Consolidated Resources Limited (CCR). RMDSTEM Limited is part of the owner’s team for feasibility, design, engineering, con

    Aug 8, 2011