Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Modelling of Iron Ore in Materials Handling Applications with a Focus on Wear

    By T Krull, T J. Donohue, D Ilic

    "Problematic issues in materials handling applications are often amplified in the iron ore industry due to the relatively high density of the ore as well as the abrasive nature of the product. One of

    Aug 12, 2013

  • AUSIMM
    Truck Haulage Developments in the 80's

    A brief history of the significant haulage truck feature changes and the factors that influenced those changes during the 60's and 70's provide a basis for forecasting the changes that ca

    Jan 1, 1982

  • AUSIMM
    Supergene Mining at Elura

    Confirmation of significant mineable reserves of high grade silver ore at Elura Mine has led to the development of a high cost, high recovery mining system. At the contact of oxidised and sulphide

    Jan 1, 1988

  • AUSIMM
    Application of Knowledge Based Expert Systems in the Mining Industry

    Expert systems are a product of Artificial Intelligence (AI), a field of long standing, dedicated to the study of problem solving using heuristics, construction of symbolic representations of knowl

    Jan 1, 1998

  • AUSIMM
    Numeric Modelling of Fluid Flow, Heat Transfer and Combustion in the Kalgoorlie Nickel Smelter

    By Koh P. T L, Varnas S. R

    Fluid flow, heat transfer and combustion in a nickel flash smelter have been investigated by numerical modelling and flow visualisation. The three-dimensional numerical model incorporates turbulent

    Jan 1, 1992

  • AUSIMM
    The Design and Construction of the Excavation for the Hoppers Crossing Pump Wells

    By Nichol R

    - PART A The Hoppers Crossing Pumping Station is one of the principal components of the Western Trunk Sewer Project which replaces the 90 year old Main Outfall Sewer and will convey 60% of Melbour

    Jan 1, 1987

  • AUSIMM
    Utilisation Technologies for Australian Iron Ore in China

    By D Duan

    In this study, aimed at two kinds of ore (lump ore and iron ore fines) and four types of Australian iron ore resources (haematite iron ore, Mara Mamba iron ore, limonite iron ore, and mixed iron ore,

    Jul 11, 2011

  • AUSIMM
    Golden Plateau and Adjacent Deposits Structural Controls on Mineralisation

    Structural Controls Interpretation of regional aeromagnetics, radiometrics and satellite image data has identified three structural domains (fig 2): The Fairyland Domain: a general N - S structural t

    Jan 1, 1990

  • AUSIMM
    Technical Aspects of Underground Exploration at Lady Loretta

    By Mitchell G. W, Purvis A. H

    The Lady Loretta silver-lead-zinc deposit lies north of Mount Isa in folded and faulted Proterozoic carbonate sediments. The deposit was discovered in the late 1960's as a result of a soil geo

    Jan 1, 1988

  • AUSIMM
    Geology of Teutonic Bore Massive Sulphide Deposit, Western Australia

    The Teutonic Bore deposit lies in a major greenstone belt within the Archaean Yilgarn craton of Western Australia. It occurs towards the base of a suite of tholeiitic basalts, some 100 m above a felsi

    Jan 1, 1984

  • AUSIMM
    Model Tests on the Rupture Characteristics of Circular Lining Embedded in Soft Ground

    By Zhansen P

    This paper describes the test re- sults which give a complete proccess of failure of concrete lining embedded in sand medium under load, including the order of appearance of crack along the lining

    Jan 1, 1987

  • AUSIMM
    A SAG Mill Circuit Simulator Based on a Simplified Mechanistic Model

    By Magne L, Barria J, Castro O, Menacho J, Gonzalez GD

    An extensive experimental campaign was developed in a continuous 6 x 2' (D x L) pilot scale SAG mill. The effect of the feed flow rate, feed solids concentration, ball filling fraction and feed

    Jan 1, 1993

  • AUSIMM
    Sulfide Dust Explosions in Metalliferous Mines

    Changes in mining technology have led to an increase in the number of underground sulfide dust explosions reported in Australian and overseas mines. Samples collected at the Elura mine consisting prim

    Jan 1, 1984

  • AUSIMM
    The Upgrade of the Ore Haulage Facilities at Z.C. Mines, Broken Hill

    A Feasibility Study to determine the future of ZC Mines was completed in mid 1987. Early in this study, which lasted two years, it was identified that significant reductions in treatment costs would r

    Jan 1, 1988

  • AUSIMM
    Optimisation of Spray Collers for Cooling Deep Coal Mines

    By Hagen G, Uhlig H

    In the Federal Republic of Germany the thermal environment in underground coal mines has deteriorated progressively over the past years. The number and capacity of refrigeration plants have increa

    Jan 1, 1988

  • AUSIMM
    Integrated Whaleback Planning and Scheduling System

    Various software packages are discussed. These are components of an Integrated Planning and Scheduling System developed by MVM with the aim of providing up-to-date information for the Whaleback o

    Jan 1, 1986

  • AUSIMM
    Routes to Stainless Steel With Improved Energy Efficiencies

    By S Jahanshahi

    In an earlier LCA study, the authors showed that the electricity consumption of the electric furnaces used in the production of the ferronickel and ferrochrome feedstocks made significant contribution

    Jan 1, 2004

  • AUSIMM
    Unlock potential opportunities through unexplored aspects of Grade Engineering

    By P Revell, G Wilkie, P Walters, L Keeney, F Faramarzi

    Grade Engineering® is a value-driven strategy aiming to maximise benefits by exploiting intrinsic grade variability of ore deposits. It utilises a multitude of separation techniques to remove low grad

    Nov 10, 2020

  • AUSIMM
    Pipe Jacking Experience in Tunnelling Through Variable Soils, Brisbane, QLD.

    By Baczynski NR, Fagan MJ

    A 3050m long section of a 1.65m internal diameter tunnel is presently under construction in the Brisbane area by means of the pipe-jacking method. The soils along the alignment had been deposited

    Jan 1, 1987

  • AUSIMM
    Deformation of Retreat Gatroad in Interpanel-Pillar System

    By Ichinose M, Tsuru T, Gotoh K

    Since 1980, the Department of Mining Engineering at Kyushu University, in co-operation with the Ikeshima Colliery, Matsushima Coal Mining Co. Ltd., has been conducting a research project into longw

    Jan 1, 1992