Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Draw Control at Premier Mine

    By K Nesbitt

    Draw control at Premier Mine is considered important to avoid conditions of isolated draw, which results in early waste ingress, compaction of the kimberlite ore and loss of ore reserves. The Premier

    Jan 1, 2000

  • AUSIMM
    Mineralogical Characterisation of Iron Ores From Noamundi, India With Special Emphasis on Beneficiation of Iron Ore Fines

    By V Kumar, A S. Venkatesh, R K. Upadhya

    The enormous iron ore deposits of eastern India are part of the volcano-sedimentary basins containing iron and to some extent manganese deposits that belong to the Iron Ore Group (IOG) of Archaean Sin

    Jan 1, 2005

  • AUSIMM
    Some Practical Problems in Running Statistically Valid Plant Trials, and Their Solution

    Operating metallurgists spend a significant part of their time running plant trials to compare two or more conditions in order to improve the process, such as a new reagent, flow sheet or piece of equ

    Jan 1, 2008

  • AUSIMM
    The Palaeoproterozoic Warramunga Formation, Tennant Creek Block, Central Australia: Sedimentology, Geochemistry and Provenance

    By N Donnellan

    The Palaeoproterozoic Warramunga Formation is notable as the host to the enigmatic, so-called 'Tennant Creek style' mineralisation. These polymetallic (but mainly Au-Cu-Bi) ore deposits t

    Jan 1, 1994

  • AUSIMM
    Optimising a Mineral Supply Chain under Uncertainty with Long-term Sales Contracts

    By J Zhang, R Dimitrakopoulos

    A two-stage stochastic mixed integer non-linear program is formulated for a mining complex to optimise strategic and tactical plans. The objective is to find the near optimal decisions for a mineral s

    Nov 24, 2014

  • AUSIMM
    Impurity capacities of non-ferrous slags

    By R G. Reddy

    The complexity in treating environmentally harmful impurities such as As, Sb, Bi from the base metal matte or metal in the smelting stage are responsible for the high cost of the refining process. The

    Aug 21, 2024

  • AUSIMM
    A New Metaheuristic Algorithm for Long-Term Open Pit Production Planning

    By C Niemann-Delius

    The problem of long-term open pit mine planning is a large combinatorial problem, which canÆt be solved easily by mathematical programming models because of the large problem size. In this paper a new

    Sep 26, 2011

  • AUSIMM
    Investigation of Shield Face Stability by Transparent Soil Models

    By M Ahmed

    Reliable face support pressure is necessary for shield driven tunnels in cohesionless soils to prevent excessive ground movements. This paper presents experimental work on stability of a tunnel face u

    Mar 8, 2011

  • AUSIMM
    Microseismic Monitoring of Shear Zones and Related Seismic Activity at Broken Hill

    By G C. Reed, J M. Murray

    During more than 100 years continuous mining of the lead-zinc orebody at Broken Hill, an immense amount of geological data has been collected about shear zones related to the orebody. The challenge to

    Jan 1, 2000

  • AUSIMM
    Thermoelectric Power Measurements of Particulate Chalcopyrite Samples from the Mt Isa Mine

    By Kobayashi M

    Particulate chalcopyrite samples (78 ~ 98 mole per cent chalcopyrite, screen size fraction from 710 to 250 µm) were prepared by crushing and sieving lump ore samples from 12 locations in the Mt I

    Jan 1, 1990

  • AUSIMM
    Characterisation of Glassy and Heterogeneous Cementing Phases of Municipal Solid Waste of Incineration (MSWI) Bottom Ash

    By R Badreddine, J Rose, L De Windt, P Chaurand, L Raimbault

    Municipal solid waste of incineration (MSWI) bottom ashes are recycled as aggregates in civil engineering. These heterogeneous materials are composed of crystalline and glassy solid phases which conta

    Jan 1, 2008

  • AUSIMM
    Perspectives of chemical metallurgy fundamentals in slag innovation

    By S Lee, I Sohn

    The ferrous and non-ferrous metallurgical industries have been utilising slags, fluxes and mattes for process optimisation and quality improvements at high temperatures. Understanding the fundamentals

    Jun 19, 2024

  • AUSIMM
    Sintering characteristics of iron ore blends containing iron ore concentrates

    By H Han, d S. Hapugoda, L Lu

    With the recent rapid development of Chinese steel industry, the world iron ore resources of good quality are depleting rapidly. As a result, iron ore deposits of lower quality have been or are being

    Sep 18, 2023

  • AUSIMM
    Boron removal through multistage refining treatment using CaO-SiO2- Al2O3 slag

    By K L. Avarmaa, M A. Rhamdhani, A D. P Putera, H T. B M Petrus, G A. Brooks

    Multistage slag treatment was carried out to investigate boron removal from metallurgical grade silicon. Boron is known to be one of the most difficult elements to remove from silicon. Depending on bo

    Aug 21, 2024

  • AUSIMM
    Prefeasibility Testing of Gold Ore Samples Prior to CIP Plant Design

    By K B. Quast

    During the prefeasibility stage of the mining cycle for a gold deposit, an evaluation of the ore leaching characteristics from various defined areas is essential prior to plant design. There are a num

    Jan 1, 1998

  • AUSIMM
    Maintaining and Improving Grade Control at New Celebration Gold Mine

    New Celebration Gold Mine is located 35 km SE of Kalgoorlie, Western Australia, in the Archaean Kalgoorlie-St Ives Greenstone belt. The leases total 119 sq kms and arepart of a joint venture between

    Jan 1, 1991

  • AUSIMM
    The Backfilling Philosophy for Massive Mining at Depth in the South Deep Section, Western Areas Gold Mine (f2bb1cd1-7859-47a6-a8fe-c624335a573a)

    By MacDonald AJ, Raffield MP

    The South Deep massive orebody consists of 20 to 30 in of payable conglomerates ranging in dip from 11¦ to 20¦ and at depths of between 2400 in and 34(10 in. The mine design process selected a minin

    Jan 1, 1998

  • AUSIMM
    The Potential for Backfill in Highwall Mining (7bcc6ff0-6f9e-4f39-8e8f-1dbb9d479afe)

    By Boyd GL

    Backfill applied to highwall mining is foreseen as a means to increase recovery of mineable coal to levels comparable with underground longwall mining. This paper describes the progress of research

    Jan 1, 1998

  • AUSIMM
    The Contribution of Air-Deck Blasting to Open Pit Mining Economics

    By T Laing, M A. Abdalla, P Hagan

    Open pit operators are facing a number of challenges in the area of blasting and blasting processes, such as wall control, quality of fragmentation, explosives consumption and vibration. Remaining fin

    Sep 18, 2012

  • AUSIMM
    Economic and Environmental Constraints on Use of South Island Resources for Power Generation

    Since the early 1990s it has been evident that electricity demand has outstripped investment in generation and transmission. At the same time, concerns were being expressed about the risks associated

    Jan 1, 2003