Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Geometallurgy in Mineral Sands Deposits – Linking Geological Artifacts to Metallurgy and Mine PlanningBy G Williams
Somewhat to the surprise of many heavy mineral sands (TiO2 and zircon) producers, there are important geological structures within their typical placers and aeolian sands deposits that affect plant me
Oct 5, 2011
-
The Wedge Theory of Borehole Charge Design for Bench Blasting and Its Numerical SimulationBy Q Yu, G Ren, Z-Y Chen, J Yang
The wedge shape theory of the rock fragmentation range in bench blasting is presented according to the dynamic characteristics of rock fragmentation by blasting in open pit under the condition of hole
Aug 24, 2015
-
The development of optimised pulp lifter design for the Ahafo SAG mill using discrete element method modellingBy E Asakpo, S Chaffer, A Heath
Newmont has had continuous production at their Ahafo operations, Ghana, since 2006. In 2013, Ahafo initiated an efficiency programme to improve mill performance and reduce energy consumption. Followin
Aug 29, 2018
-
Geological Modelling and Bench Face Survey to Improve Blasting FragmentationBy E Gabriel, J C. Koppe, A Gomes and P Crispim, R Schaarsdmit, I Pablos
Drill and blast (D&B) is one of the most important production operations in open pit mining. The resulting fragmentation of the D&B reflects in the downstream unit operation. Good fragmentatio
Aug 24, 2015
-
Above and beyond NPV – determining the life-of-mine from an economic perspectiveBy C Tapia, B Hay
There is a close relationship between the mining industry, economic growth, and technological and social development. Mining activities benefit all economic agents, but only during a timespan determin
Aug 2, 2023
-
Multi-factor integrated data analytics and data-driven decision-making for ground control managementBy R Carstens, L Munsamy, L Prinsloo, C Huang, C Zhang, R Liang, I Canbulat
With recent advances in machine learning, data-based automated decision-making has been proven successful with promising outcomes in many industries. Its application in the mining sector can be ground
Nov 29, 2022
-
Structural and Lithological Controls on the Location of Orebodies in the Baizhangzi Lode Gold Deposit in Western Liaoning Province, ChinaBy L Xiong, W J Shi, J H. Wei
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Baizhangzi gold deposit is located in the northern North China Craton. The structural a
Mar 18, 2015
-
Sensors and Systems for the Measurement of Tunnel Movements During and After ConstructionBy W Ward, J Clegg, R Barnes, T Zhong
This paper provides an overview of methods for measuring tunnel deflection and construction’s effects on the surrounding environment during and post construction. It will also review illustrative case
Sep 17, 2014
-
The 2007 Atlas Copco Scholarship BonanzaDuring the later part of 2007 I was lucky enough to visit the Atlas Copco facilities in Sweden, and to see first hand what a large and diverse company Atlas Copco is. The reason this paper calls the A
Jan 1, 2008
-
Feasibility Study for a Silicon Industry in SouthlandBy D S. Nicholson, T Marshall
Reserves of high-grade quartz gravel, lignite and timber suitable for the production of silicon metal and ferrosilicon on large scale occur within 40 miles of Bluff Harbour. Undeveloped hydroelectric
Jan 1, 1971
-
The Concentrating Practice of the Broken Hill South LimitedThe concentrating plant of the Broken Hill South Limited was described in Proceedings No. 44, Australasian Institute Mining and Metallurgy, December, 1921, by Wainwright and Read. It was erected on th
Jan 1, 1932
-
Re-Assessment of Rank and Maceral Composition of Queensland Coals: Implications for Hydrocarbon Generation and Other Unexplained PhenomenaBy Feilding C
Vitrinite of humic source (often designated as vitrinite A) is the maceral by which the rank of a coal ought to be determined. Therefore its recognition, and the precise identification of other vit
Jan 1, 1991
-
Real time LHD dispatch optimisation with ratio targets at Newcrest’s Cadia Valley OperationsBy S N. Donaldson, B L. Hollis, K Wynn, L Potts, M Evans
A real-time load-haul-dump (LHD) dispatch optimisation tool has been deployed at Panel Cave 1 and Panel Cave 2 at Newcrest’s Cadia Valley Operations. The tool, known as ORB, is the first known success
Mar 15, 2021
-
Supervisors and Teams at WorkBy T G. Neville, G Terrey, J Burns
This paper explores recent industry training programs and lessons for supervisors. The Belbin Team Role model was used to increase participants’ awareness of behaviour and its application. The applica
Jun 22, 2016
-
Reaping the First Fruits – Infrared Spectroscopy: the New Standard Tool in BHP Billiton Iron Ore ExplorationBy M Haest, O Dominguez, D Mittrup
With the current focus in the mining industry on reducing costs, while simultaneously improving ore quality, infrared spectroscopy is a tool that can potentially assist companies to meet both challeng
Jul 13, 2015
-
The necessity of 3D analysis in open pit, rock slope, stability analysis – in theory and practiceBy A Mcquillan, N Bar
Geotechnical models developed during the open pit mine planning stage are generally three-dimensional (3D) in component to capture the spatial variation in geological, structural, hydrogeological and
Nov 29, 2022
-
Thermal phosphorus – it’s a hot commodity with a hot processBy R Atmuri, W Liang, R Prasad, Y Liu, E Wingate
Yellow phosphorus (YP) has been commercially produced since the 1920s. First in the USA by the Tennessee Valley Authority (TVA), next in Russian (Kazakhstan) in the 1950s, and finally in China in the
Aug 21, 2024
-
Managing continuous improvement of Mine to Mill begins with measurementBy J Loeb, R Ramanathan, H Ingham, P Cameron
Most mining operations, including iron ore, maintain a focus on continuous improvement and asset optimisation in their operations. As all the unit operations in the Mine-to-Mill value chain are interd
Nov 8, 2021
-
New Methods for Quantifying Geology and Geological Engineering Risk in Large-Scale Deep Tunnelling – Both in Design and in the Build PhaseBy D FitzGerald
A critical component of any new tunnel design in a complex geological setting is the development of an integrated three-dimensional (3D) geology model with a full set of geotechnical properties of the
Mar 8, 2011
-
An assessment of battery trolley systems’ performance in surface minesBy H Bao, M Nehring, M Kizil, P Knights
The mining sector, a notably energy-intensive industry worldwide, is a major consumer of fossil fuels, leading to significant carbon emissions globally. The move towards electrification, coupled with
Sep 1, 2024