    What Project Managers must Demand from an Economic Evaluation!

    By P Card

    Some project managers accept unsatisfactory economic evaluation modelling because they are unaware of what constitutes good practice. They tend to leave it to the evaluation specialist or others to de

    May 24, 2012

  • AUSIMM
    A System of Diluting Methane to Safe Levels

    By R Hughes

    "Spring Creek Mine uses high pressure water to extract the thick Main seam in the Upper Rewanuicoal measures. The extraction method results in the creation of large voids which collapsespontaneously.

    Jun 1, 2012

  • AUSIMM
    Problem roadways in an underground decline solved through the application of Roller Compacted Concrete (RCC)

    By D Bruce, D Cox

    The main access decline at Carrapateena mine was excavated through two different underground aquifers. In these areas of decline, pressurised water finds the path of least resistance through the rock

    Mar 15, 2021

  • AUSIMM
    An analysis of productivity in sublevel caving mines

    By G R. Power

    A useful way to assess potential productivity of SLC mines is by quantifying tonnes/drawpoint/day to be extracted from the mine. However limited industry information has been published to help mines b

    Mar 15, 2021

  • AUSIMM
    Mineral Resource Classification - It's Time to Shoot the 'Spotted Dog'!

    By P T. Stoker, A Allman, D P. Carville

    Classification of mineral resource estimates is one of the most important responsibilities of the Competent Person. In recent years, classification decisions have been driven more by the detailed bloc

    Jan 1, 2006

  • AUSIMM
    An Approach to High Solids Slurry Pipeline Design

    By M Griffiths

    This paper outlines an approach to high solids slurry pipeline design with data generated from a closed pipe-loop test system. The pressure and flow rate data generated is used to develop a pseudo-she

    Aug 8, 2011

  • AUSIMM
    A Sustainable Future in Management of Dust Emission during Transport of Coal and Iron Ore

    By J Planner

    As Australia’s coal and iron ore export volumes increase to meet international market growth, port terminals, mining operations and rail transport systems can be the source of increased dust emission.

    Nov 22, 2011

  • AUSIMM
    On-Belt Analysis at Sepon Copper Operation

    By T Arena

    To maintain copper recoveries and maximise production at the Sepon Copper Operation it is crucial to control the amount of copper entering the leaching circuit. This requires close control of blending

    Aug 8, 2011

  • AUSIMM
    Innovative Victoria Park Tunnel design is Communicated Effectively to Stakeholders with the Aid of Three-Dimensional Visualisation Medi

    By M Sparrow

    The Victoria Park Tunnel project is an inner-city alliance project in central Auckland, New Zealand. The existing two-directional viaduct will be modified to single-direction flow, and a new northboun

    Mar 8, 2011

  • AUSIMM
    Laser Scanning of Conveyor Ore Profiles

    By S Grobler, T Fares

    Understanding the real utilisation of the available volumetric capacity of a conveyor is key to unlocking latent capacity or ‘debottlenecking’ existing plant. Conveyors are typically designed on the b

    Jul 13, 2015

  • AUSIMM
    Real-time Through-belt Moisture Analysis for Iron Ore

    By A Harris, L Balzan

    Accurate measurements of the moisture content of iron ore have increasing importance in modern mining operations. Knowledge of the moisture content allows process control actions to be carried out to

    Jul 13, 2015

  • AUSIMM
    Managing the Diamond Drilling Interactions in Commissioning the Ankata Underground Mine

    By L Sandery, S Light

    Within 22 months of commencing decline development, the Prominent Hill Ankata Underground Project achieved its full production rate of 1.2 Mt/a.In 2010 construction of the Ankata Underground Project w

    Mar 24, 2014

  • AUSIMM
    Dilution optimisation in sublevel open stoping operations

    By A Vakili

    Dilution is associated with considerable direct and indirect costs in underground open stoping operations. As shown in previous works, an improved ability to predict dilution enables the economic risk

    Mar 29, 2023

  • AUSIMM
    Technology integration for tailings storage facility construction

    By A R. Hollis, M Heddon

    The safe life cycle of a Tailings Storage Facility (TSF) is founded on the fundamentals of proper design, construction, operation and closure. Leinster Nickel Operations (Leinster) utilises four activ

    Jul 1, 2021

  • AUSIMM
    A Simple and Proven Technology for Reclaiming Acidic Mine Waters

    By B Mack

    The cost of water treatment is now more than ever a major consideration for maintaining an environmentally and economically sustainable mining operation. As an industry, we often have to consider wate

    Jan 1, 2009

  • AUSIMM
    Winning the Safety Battle

    By S Hanrahan, S McLaughlin

    A case study is presented that details the safety journey at a North American project involving two major contracts: a 1000 m shaft recovery and rehabilitation, and the development of a drainage galle

    Jun 22, 2016

  • AUSIMM
    Evaluation of a New Vision System Algorithm for Automated Fragmentation Measurement from a Shovel

    By M J. Noy

    The automated measurement of rock fragmentation particle size distribution in the muck during muck excavation has been developing over the last 16 years. The introduction of stereo camera imaging of t

    Aug 24, 2015

  • AUSIMM
    Blast Design Using Measurement While Drilling Parameters

    By M Higgins

    Measurement while drilling (MWD) techniques can provide a useful tool to aid drill and blast engineers in open cut mining. By avoiding time consuming tasks such as scan-lines and rock sample collectio

    Jan 1, 2001

  • AUSIMM
    New Technology for Management and Security of Exploration and Mining Information

    A hidden asset in most exploration and mining activities is data. Common practice involves the spending of large amounts of money to discover, define and prove the viability of a mining project. Some

    Jan 1, 1999

  • AUSIMM
    A methodology for assessing stope design modifying factors for the Olympic Dam Mine

    By S Tierney, D Cumming-Potvin, I Thin, Y Potvin, D Grant

    The preliminary modifying factors for future stope design in the Southern Mine Area of Olympic Dam consisted of only a single, arbitrary value of Equivalent Linear Overbreak/Sloughing (ELOS). In order