Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Design, Construction and Operation of a 500,00 Tonnes per Annum Carbon-in-Pulp Plant at Kambalda, Western Australia

    Economic conditions dictated the lead time from concept to commissioning of the Kambalda C.I.P. Plant. The high gold price prevailing at the time the Victory ore-body was discovered provided the imp

    Jan 1, 1982

  • AUSIMM
    The Impact of Flocculant Addition on a Tailings Storage Facility

    Water retention, water loss and delay in tailings storage rehabilitation are major challenges for many Coal Mines. Work by Stewart, Backer and Busch in the early 1980s suggested that there were improv

    Jan 1, 2008

  • AUSIMM
    Geophysical Prospecting (09b1d71f-a326-443b-af84-dae3749cf8fe)

    By Elford H. S, Hughes J. F

    The object of this paper is to bring before Members of the lnstitute the very important and much discussed question of scientifically prospecting for ores, oil, coal, etc.The paper is divided into thr

    Jan 1, 1927

  • AUSIMM
    The Application of the Cavity Measurement System at Olympic Dam Operations

    The Olympic Dam mining operation is some 520 kilometres NNW of Adelaide on the Roxby Downs Pastoral lease. The deposit containing copper, uranium, gold and silver was discovered in 1975 by Western

    Jan 1, 1995

  • AUSIMM
    Innovative Investigation Techniques used for Geotechnical Modelling of the Northside Storage Tunnel Project, Sydney

    By B Whiteley, B Gee

    The Northside Storage Tunnel is a TBM driven rock tunnel system designed to collect and store sewage from four major storm overflow points along the existing Northern Suburbs Ocean Outfall Sewer. At p

    Jan 1, 1999

  • AUSIMM
    Uranium Ore Deposit at Mary Kathleen

    By Munro DL

    The Mary Kathleen uranium deposit is in north-west Queensland, approximately halfway between the townships of Mount Isa and Cloncurry, at long. 1400 009 E and lat. 200 44' S. The deposit Iwas d

    Jan 1, 1968

  • AUSIMM
    Mineralogical Face-Mapping Using Hyperspectral Scanning for Mine Mapping and Control

    By L Whitbourn, K Yang, P C, E Ramanaidou

    The potential of hyperspectral mineral mapping within a mine environment is demonstrated. Central to this capability has been the development of portable or vehicle-mounted, hyperspectral mine face-ma

    Jan 1, 2006

  • AUSIMM
    Current Drilling Practice at Isa Mine

    By Stevens P

    The Isa Mine of Mount Isa Mines Limited currently produces 5.4 million tonnes of copper ore and 3.3 million tonnes of silver, lead and zinc ore annually. Of this, 5.1 million tonnes of copper ore

    Jan 1, 1982

  • AUSIMM
    Linear Motion Versus Circular Motion on Vibrating Screens

    This paper will discuss specifically the performances of vibrating screens having circular motion with inclined decks and linear motion with horizontal or near horizontal decks and both related main

    Jan 1, 1984

  • AUSIMM
    Application of the ISAMILL (A Horizontal Stirred Mill) to the Lead-Zinc Concentrator (Mount Isa Mines Ltd) and the Mining Cycle

    By B Cronin, M Gao, M F. Young

    Fine grinding technology has become extremely important for Mount Isa Mines Limited in the last decade for flowsheet development for the McArthur River deposit and in rejuvenating the Lead-Zinc Concen

    Jan 1, 1998

  • AUSIMM
    Fusain in Some Victorian Brown Coals

    The long continuing controversy over the Origin of fusain, whether it is a product of primeval forest fires, or of special conditions of weathering (including bacterial decay) of the vegetal debris co

    Jan 1, 1953

  • AUSIMM
    A System Approach to Mine Waste Remediation, the Kristineberg Mine, Northern Sweden

    By H Holmstr÷m, A Widerlund, M Lindvall

    At the Kristineberg mine in northern Sweden sulfide-rich, poorly buffered tailings have been deposited in five impoundments located along a valley. The tailings area has been remediated by applying a

    Jan 1, 2003

  • AUSIMM
    The Use of Stressed Anchors in Open Excavations and Surface Structures

    Where vertical or near vertical faces are required in open excavations in soils and rocks, some form of stabilization of the 'cut is often necessary. Stressed anchors either alone or in combin

    Jan 1, 1971

  • AUSIMM
    Discovery of the Toguraci Epithermal Au-Ag Deposits, Gosowong Goldfield, Halmahera Island, East Indonesia

    By M D. Basuki Dwi Priyono

    The Toguraci low sulfidation epithermal gold vein deposits are located 2 km WSW from the Gosowong mine and form part of the Gosowong Goldfield. The goldfield lies within a Neogene magmatic arc on Halm

    Jan 1, 2004

  • AUSIMM
    Lead-Zinc-Silver Exploration and Development in Australia

    By Haslam C. O, Taylor S

    Four historical periods of Australian lead-zinc-silver exploration and development are identified.In the first period, 1841-1900, Australia's deeply weathered surface yielded bonanza deposits. Th

    Jan 1, 1984

  • AUSIMM
    Geological Solutions to Short-Term Planning in Iron Ore ù A Pilbara Iron Example, Mt Tom Price

    By J Austin, R Bitencourt

    Differences between the long-term model (LTM) and mine geology system (MGS) grade control block-outs on a blast block scale can impose difficulties to planning crusher feed grade and tonnes on a month

    Jan 1, 2005

  • AUSIMM
    The Discovery and Early History of the Mt Leyshon Gold Deposit, North Queensland

    By J E. Lynch

    The Mt Leyshon gold deposit produced in excess of three million ounces of gold and considerable silver over a period of approximately 130 years. Most of this production occurred between 1987 and 2001.

    Jan 1, 2004

  • AUSIMM
    Structural Controls on Iron Mineralisation and Resource Domains in C Deposit, Area C, Hamersley Province, Australia

    By H Arvidson, D Guibal

    This paper presents updated interpretations of controls on mineralisation in C Deposit and highlights structural features that influence the geometry of mineralisation domains used in resource estimat

    Jan 1, 2005

  • AUSIMM
    Development of a Near Field Damage Model for Cemented Hydraulic Fill (MINEFILL '98)

    By Chitombo GPF

    The dilution of blasted ore with cemented backfill materials has been recognised as a significant factor influencing the economics of some underground metalliferous mining operations. Several mechan

    Jan 1, 1998

  • AUSIMM
    High P:Metamorphism and its Relation to Deformation in the North D'Aguilar Block, SE Queensland, Australia

    By Holcombe R. J, Dobos S. K, Little T. R

    Blue amphibole-bearing rocks in the North D'aguilar Block of southeast Queensland occur either as relict pods and lenses within regionally extensive greenschist facies phyllites and schists or as

    Jan 1, 1990