  • AUSIMM
    Mining Equipment - Mine Transportation

    EQUIPMENT TO BE DISCUSSED It is the intention of this paper to discuss the transporting of large skid mounted equipment and track machines around open cut mines. By large I mean 100 to 350 tonne cap

    Jan 1, 1989

  • AUSIMM
    Recent Developments and Applications of Spiral Concentrators

    This paper outlines some of the recent developments in Spiral Concentrator design, with particular reference to the range of Reichert spirals supplied by Mineral Deposits Limited, typical applicati

    Jan 1, 1978

  • AUSIMM
    Analysis of Lead/Zinc Concentrator Flotation Performance at Mount Isa Mines Limited

    By Watsford RMS, Wickham P

    In October 1980 the two existing flotation circuits were combined into a single new circuit. This circuit used modern 11.3 m3 flotation cells which replaced 1.4 m3 units. Sometime after this change

    Jan 1, 1978

  • AUSIMM
    Spherical Element Bulking Mechanisms for Modeling Blasting Induced Rock Motion

    By Taylor L. M

    Accurate computer prediction of the muck pile produced by a conventional blast requires modeling of the physics that occurs during the rock motion phase of a blast. The ability to predict the motio

    Jan 1, 1990

  • AUSIMM
    Crafers Highway Tunnels, Adelaide, SA

    By G Brewster

    The Eagle on the Hill tunnels form part of an upgrade of Mt Barker Road, 15 km to the southeast of Adelaide. The upgrade significantly improves safety and reduces delays on this major road, which wind

    Jan 1, 1999

  • AUSIMM
    A Strategy to Minimise Ore Grade Reconciliation Problems Between the Mine and the Mill

    Major discrepancies between mine estimates and estimates from plant metallurgical balances are a common problem in many gold and base metals mines around the world. Many existing practices are based

    Jan 1, 1998

  • AUSIMM
    Finding a Mine Within a Mine - The Mount Isa Lead/Zinc Case Study

    By M D. Rosengren, G Gregor, M F. Young

    Over the last 15 years the silver/lead/zinc ore treated at Mount Isa became increasingly complex and lower grade. Metal recoveries dropped dramatically, causing a serious decline in profitability. The

    Jan 1, 1998

  • AUSIMM
    Combustion of Chalcopyrite Pyrite, Galena and Sphalerite Under Simulated Suspension Smelting Conditions

    A laminar-flow furnace was used to study the combustion of four flotation concentrates (chalcopyrite, pyrite, galena, and sphalerite) in air at temperatures up to 1400¦C. A special- Iv developed tw

    Jan 1, 1980

  • AUSIMM
    Big Diameter Tunnelling Beneath Low Rock Cover

    By N McKenzie, F Brodbeck

    The North-South Bypass Tunnel is the first project to get underway as part of BrisbaneÆs transport plan, which aims to improve the urban road network. The total length to be excavated is 6.8 km, which

    Jan 1, 2008

  • AUSIMM
    New Tectonic Framework for PNG and the Caroline Plate: Implications for Cessation of Spreading in Back-Arc Basins

    By Hagarty KA

    At the northern margin of New Guinea there is a fundamental problem related to the relative timing of arc- continent collision(s) represented in the Papuan Fold-Belt (PFB) and backarc spreading in th

    Jan 1, 1987

  • AUSIMM
    Kinetics and M÷ssbauer Spectroscopy Studies of Direct Iron Ore Reduction

    By Zhou A, Cadogan J. M

    Direct reduction of iron ore (DR) is one of the promising technology emerging in the world's steel industry. Kinetics and Mossbauer studies of DR with hydrogen have been carried out at two temp

    Jan 1, 1997

  • AUSIMM
    The Development of a Continuous Copper Drossing Process for Lead Bullion (e832ca00-fad1-4d25-a701-ac8072a9e7d1)

    The first stage in the refining of lead blast furnace bullion is the removal of copper and is normally done as a batch process in open kettles.A number of attempts have been made to establish continuo

    Jan 1, 1963

  • AUSIMM
    Access Arrangements Under the Crown Minerals Act - A New Direction?

    The Crown Minerals Act 1991 has introduced some significant changes to the New Zealand mining industry, not the least of which relate to the ability of miners to obtain access to land to conduct minin

    Jan 1, 1992

  • AUSIMM
    Latest Developments in Visualising Spatial Continuity from Variogram Analysis

    Spatial continuity as described by a variogram is a reflection of the underlying mineralisation/geology. Modelling of the spatial continuity (variogram) must account for both the quantitative data

    Jan 1, 1996

  • AUSIMM
    Mill Management Using MillMapperÖ - An Answer to the Skills Shortage - A Tool for Cost-Cutting

    By G Johnson, S Michalek, N Redman

    As the modification of the 2009 Mill OperatorsÆ Conference theme from æmilling through the boomÆ to æthe boom û experience gained and lessons learnedÆ exemplifies, comminution practitioners are facing

    Jan 1, 2009

  • AUSIMM
    Ore Control to Deliver Metal Production at Ridgeway Gold Mine

    By A Tomsett, J Rutter

    Ore control systems at Ridgeway have been designed to deliver gold and copper metal production through focussing on the ore characteristics that impact on mine and mill performance and ultimately meta

    Jan 1, 2002

  • AUSIMM
    Application of Fluidsied Bed Technology to Reduction of Australian Mangansse and Iron Ores

    By Brent A. D, Olsen a. H, Mayfield P. L J, Grazier P. E

    Concentrates produced from MnO2 and Fe203 ore fines have been targeted as potential feedstocks for direct metallurgical processing. Prereduction of pyrolusite-rich Mn02 sands to MnO has been investi

    Jan 1, 1995

  • AUSIMM
    Computer Simulation to Aid Open Cut Plant Selection

    The paper describes a computer model developed within the State Electricity Commis- sion of Victoria for use in open cut planning. The purpose of the model is to simulate all the typical occurrence

    Jan 1, 1982

  • AUSIMM
    Pre-feasibility and Feasibility Studies : A case for Improvements

    The paper reviews some characteristic features of feasibility studies and discusses the need for a wide scope at the pre-feasibility stage. The performance of recent Australian gold mines against th

    Jan 1, 1991

  • AUSIMM
    The Design and Evaluation of a Large Direct-Contact Ice-Air Cooler for Vaal Reefs Gold Mine

    By Bluhm S. J, Feio L, Ramsden R

    A new mining area at the Vaal Reefs gold mine is to have a shaft. system which will extend to a depth of 4 200 m and will require 130 MW of cooling. A novel feature of the proposed cooling system

    Jan 1, 1988