Lead Flotation Practice And Control At North Broken Hill LimitedBy Sandy W
This paper examines the effects of a significant number of plant alterations and modifications to the lead flotation circuit during the past five years. Metallurgical effort is directed largely at
Jan 1, 1983
-
Control of the Flotation Rate of Carbonaceous Material in Mt. Isa Chalcopyrite OreBy Fewings JH
When the mining and milling of 1100 Copper Orebody commenced, difficulties were experienced in producing a satisfactory grade of copper concentrate. The major concentrate contaminants were fine pyrit
Jan 1, 1970
-
Grade/Tonnage Curves and Optimization of a Mining ProjectSince its beginning, with the works of D. Krige and later, G. Matheron, geostatistics has been analyzing in detail the essential factors at play in ore reserves estimation problems, with the ever-p
Jan 1, 1987
-
Production of High-Grade Magnesia by Chemical Processing RoutesBy Moorrees C
The end uses of magnesia are determined by both its chemical and its physical proper- ties. There is seen to be an increasing need for products of high chemical purity. Prod- ucts containing 90-95 p
Jan 1, 1987
-
Instrumentation and Control in The Cobar ConcentratorThe treatment meIhods selected for the concentrator at Cobar Mines Pty. Ltd. called for a high degree of automatic control of both the grinding and flotation sections.The resulting concentrator layout
Jan 1, 1969
-
Lead-Zinc Flotation Circuits Tested at Mount Isa Mines 1959-1963By Harraway DH, Tanner AC
The various circuits tried!at Mount.Isa Mines during the period 1959-1963 to improve the differential%f lotation of galena and sphalerite are reported. The benefits and disadvantages of 'the vari
Jan 1, 1963
-
Mineralogy Controlling Metallurgy at Ernest Henry Mining RevisitedBy S Strohmayr, R Harvey, A See
Ernest Henry Mining Pty Ltd started production in August 1997. The Ernest Henry orebody consists of two distinct parts, a complex supergene ore zone overlying a primary ore zone. The economic copper m
Jan 1, 2003
-
A Model for the Chemical Kinetics of In-Situ Leaching of a Sulphide OreBy Prosser A. P
A computer simulation is being developed for in-situ leaching of unbroken, Zn-Pb-Ag sulphide ore. Ferric chloride is the selected reagent. Experimental work showed that a diffusion control model o
Jan 1, 1987
-
Access and TrespassThe purpose of this paper is to provide some practical commercial advice in relation to issues of access and trespass during exploration. It is not my intention to provide a detailed analysis of the
Jan 1, 1995
-
Predicting Carbonation of Concrete in TunnelsCarbonation of reinforced concrete is a potential durability issue for vehicular tunnels. This is particularly the case where elevated carbon dioxide concentrations exist and when the design life is 1
Jan 1, 2008
-
An Understanding of Regolith and Landscape Evolution as an Aid to Mineral Exploration - The Charters Towers ExperienceBy van Eck M, Orr T, Eggleton R. A, Taylor G
The Charters Towers locality has been a historically renowned gold producing region and discovery of new ore deposits during the past decade have renewed exploration interests in the area. Further
Jan 1, 1997
-
Mine Stability Evaluation from Microseismic ActivityBy Harris R. W
Any defect activity resulting from an applied stimulus on a structure will generate a stress wave which travels in the medium under the laws of acoustics, thus the name of acoustic emission (AE).
Jan 1, 1992
-
Explosives Performance - The Underwater Test RevisitedThe underwater test is now being used routinely to characterise explosives and initiators. However, several outstanding issues regarding the role of confinement and the usefulness of the test results
Jan 1, 1999
-
Application of Thermo-Chemical Analysis to Control the Recovery of Silicon During the Production of Ferro-Chromium in Submerged-Arc FurnaceBy Mishra S. N, Mishra R, Sen P. K
Control of silicon in produced through the submerged-arc furnace can result in reduced power and coke consumption in addition to improving the quality of the hot metal. A thermo-chemical analysis of
Jan 1, 1999
-
Advances in Highwall MiningHighwall mining commenced in the Appalachian region 50 years ago. With innovative equipment design introduced in more recent times, penetration distances over 300 m are now commonplace. It is only in
Jan 1, 1992
-
Depression of Arsenopyrite Flotation and its Separation from Pyrite in Guangxi Shanhu Tin MineBy Shinnosuke U, Zhang HE, Qian X
In this paper it is recommended that pyrite is to be separated as froth from arsenopyrite by selective depression of arsenopyrite in strong alkaline medium (1), by oxidation with chlorinated lime (I
Jan 1, 1993
-
Equipment Selection for Reclamation and Parting RemovalBy Wright G. N
Curragh Queensland Mining Limited, a co-venture of Australian and overseas interests, operates an open cut coal mine 13 km north of the township of Blackwater in Central Queensland, refer attached loc
Jan 1, 1992
-
The Computer System æSafety and Stability of Underground BuildingsÆBy V F. Kucherov, V A, V M. Kirienko
In the paper the problems of elaboration and building up the computer engineering system æSafety and stability of underground buildingsÆ as subsystems of the common automated computer system of geomec
Jan 1, 2003
-
The Need for Quality Control in Sampling Due to Evaluation Advances at Anglo PlatinumAnglo Platinum recognised with its expanded operations the need to change its evaluation strategy due to increased sample volumes and the pressure it created at laboratories. The sender/receiver analy
Jan 1, 2008
-
Blast Design SystemICI Australia has been developing PC-based software to assist the blast engineer to design and monitor open pit blasts. The scope of this software differs significantly from commercially available min
Jan 1, 1992