Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Optimisation of copper treatment at Mount Isa Mines Limited

    By Canning RL, Pritchard J

    The surface treatment works in the Mount Isa Mines Limited copper stream consist of a concentrator and smelter with annual capacities of 5.6 million tonnes of ore and production of 155 000 tonnes

    Jan 1, 1986

  • AUSIMM
    Electronic Approach to the Prediction for the Mechanical Properties of Zinc Alloys

    By Kubo H, Kubita K, Morinara M

    A quantitative method for predicting the mechanical properties of zinc alloys is proposed on the basis of the molecular orbital calculation of electronic structures. A new parameter which is the s-o

    Jan 1, 1993

  • AUSIMM
    The Calculation of the Fragmentation of Rock from Cratering

    The fragmentation of whole rock by blasting has an influence on the subsequent loading, hauling and crushing operations. However, no method of calculating the frag- mentation has yet been developed

    Jan 1, 1977

  • AUSIMM
    The Role of Sulfide Minerals and Carbon in The Pretreatment of Refractory Gold Ores with Chlorine

    By Hendrix J. L, Nelson J. H

    A study was conducted to examine how pretreatment of carbon-bearing gold ores with chlorine enhances gold recovery by cyanidation. It is hypothesized that metal species (including iron and copper) d

    Jan 1, 1991

  • AUSIMM
    Structural Elements in Epithermal Gold Deposits of the Coromandel Peninsula, New Zealand (f4fa23c9-a199-48d5-8cf2-4b1ba5582f93)

    By Clarke DS, Sporli KB

    Structure is an important control in the localisation of gold mineralisation in epithermal systems. There has been, however, only limited investigation of the structural elements involved; such a stud

    Jan 1, 1990

  • AUSIMM
    Influence of Blast Furnace Operating Parameters on Top Gas Temperature Distribution

    The recent installation of top gas temperature probes in blast furnaces at Australian Iron & Steel Pty. Ltd. - Port Kembla, has provided the means for studying radial gas flow distribution in blast f

    Jan 1, 1975

  • AUSIMM
    Metallogenesis of Devonian Volcanogenic Sulfide Deposits and Occurrences, Southern Yukon-Tanana Terrane, Easter Alaska Range, Alasaka

    By Krouse RH, Aleinikoff JN, Nokleberg WJ, Church SE, Newkirk SR

    A belt of volcanogenic massive sulfide (VMS) deposits and occurrences extends for over 150 km along the southern margin of the Yukon-Tanana terrane in the eastern Alaska Range. The VMS bodies occur ma

    Jan 1, 1990

  • AUSIMM
    The Steel Business - A Review

    By Burgess J, Brownrigg A

    The world steel industry underwent rapid growth from 1950 to 1970. Since that time, production growth has been relatively slow, with declining production in the developed countries and increasing prod

    Jan 1, 1992

  • AUSIMM
    Safety at home – this is where mine safety starts

    By K Biegaj

    During the author’s 25+ year career in mine management in various parts of the world (mostly in Australia), the author has been privileged to live and work in mining towns (not FIFO) for more than 20

    May 5, 2022

  • AUSIMM
    More Accurate, Fast, Simple, Profitable, Cheap, Relevant, Robust, Safe and Easy Gold Assays

    A new gold cyanidation assay technique has been proven for a range of ores, where it has demonstrated benefits of being: ò Accurate (reduces the typical range of assay scatter almost three-fold, and

    Jan 1, 1994

  • AUSIMM
    Structure of the Bowen Basin, Queensland, Australia

    By Mallett CW, Hobbs BE

    This study examined the structures of the Bowen Basin in central Queensland, Australia, by a series of lineament analyses. These studies were carried out using published geological maps, NOAA-AVHR

    Jan 1, 1986

  • AUSIMM
    An Approach to Coping with Unstable Pit Walls

    In any open pit mine some slope instability may be expected. This can range from small scale sliding on individual benches to large scale overall slope failure. This paper presents two case histori

    Jan 1, 1986

  • AUSIMM
    Activated Basket Anodes from Nickel Powder IV Evaluation of Production Parameters for Scaling-up the LPS Process

    By McDonald K. J, Flann R. C

    A liquid phase sintering (LPS) process for preparing basket anodes from nickel powder has been scaled-up and the innuence of compact green density and sulphur content, as well as sintering conditions

    Jan 1, 1993

  • AUSIMM
    Geology and Mineralization of the Golden Valley Volcanic Centre Northeast Queensland.

    The Golden Valley Volcanic Centre has been recently interpreted as being a combination diatreme breccia pipe and rhyo-dacite flow dome complex of Permo-Carboniferous age that intrudes basement granito

    Jan 1, 1990

  • AUSIMM
    Sampling of the Yeelirrie Uranium Deposit, Western Australia

    The discovery of economic uranium miner alisation in unique geological conditions at Yeelirrie, 700 km NNE of Perth, presented Western Mining Corporation Limited with a num- ber of sampling and eval

    Jan 1, 1976

  • AUSIMM
    Gold Mineralisation at the Muyup Prospect, East Kalimantan, Indonesia

    Epithermal gold mineralisation was discovered at the Muyup prospect during regional reconnaissance exploration in 1986. Further exploration utilising routine techniques of stream sediment, panconcen

    Jan 1, 1991

  • AUSIMM
    Pressure Oxidation Performance at Porgera: 1995 to 1997

    By Raudsepp R

    Since 1991, the Porgera Joint Venture has processed refractory sulphide flotation concentrate by pressure oxidation with the subsequent gold recovery, from the washed residue, via a conventional lea

    Jan 1, 1997

  • AUSIMM
    TBM Use in Mine Development

    By Zamel G. I, Zenari L. P

    Technological developments in modem Tunnel Boring Machines (TBMs) and associated back-up equipment are offering significant alternatives for mining operators to consider, in the selection of equipment

    Jan 1, 1993

  • AUSIMM
    Exploration and Development History of the Batman Gold Deposit, Mt Todd Project, Northern Territory

    The Mt Todd Project is located 42 km northwest of Katherine in the Northern Territory. The identified mineral resource estimate for the Batman gold deposit is 66.7 million tonnes (Mt) grading 1.4 gr

    Jan 1, 1994

  • AUSIMM
    A case study of technical, social and environmental challenges for a gold project development in Western Turkey

    By R Valenta

    Most developing projects face a range of technical and non-technical challenges, and examination of development histories can potentially provide insights into improved approaches to project developme

    Nov 21, 2018