Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Implementation of Stage Grinding at the Brunswick Mine ConcentratorBy J. Andrew Cornier, Mike Cooper
"Upon successful completion of the AG/SAG Mill project (Cooper et al., 2001) the Brunswick Mine concentrator was configured with single line processing through the AG/SAG mill, followed by two paralle
Jan 1, 2002
-
Grinding Calculations Related to the Application of Large Rod and Ball MillsBy C. A. Rowland Jr
"I. INTRODUCTIONFred C. Bond's ""Third Theory of Comminution"" (1) was published in 1952. The mathematical statement of the Third Theory is the well-known Bond Formula:where W - Kw H per short tonWl -
Jan 1, 1972
-
The Pierina Project: From Acquisition to ProductionBy Barrick Pierina, John Frostiak, Igor Gonzales, Kenneth G. Thomas, Ken Manning
"1.0 SummaryThe Pierina deposit was acquired in August 1996 when Barrick Gold Corporation purchased Arequipa Resources, a junior mining company with extensive land positions in Peru. At the time of ac
Jan 1, 2000
-
Use of Aerophine 3418A Promoter for Sulphide Minerals FlotationBy P. A. Mingione
"AEROPHINE@ 3418A is a unique sulfide mineral promoter produced by Cyanamid, based on phosphine (PH3) chemistry. It has proven effective as a collector for the sulfide minerals of copper and particula
Jan 1, 1990
-
Concentrate Dewatering Modernization at the INCO Thompson SmelterBy Mika Muinonen
"Dewatering of nickel concentrate at the INCO Thompson integrated mine-metallurgical site takes place within the smelter plant. The eight original 60 foot diameter cable torque thickeners of which fou
Jan 1, 2006
-
The use of 3D modelling in re-examining the gold potential along the Porcupine-Destor Fault, Abitibi Subprovince, Quebec1By Marc Legault
The Duparquet mining camp situated along the Quebec segment of the Porcupine-Destor Fault was the site of gold exploitation from 1933 to 1956 and 1988 to 1991. Numerous gold showings and deposits stra
May 1, 2004
-
Novel Method of Assessing Energetic Customer Baselines and Energy Savings in Mining ProcessesBy Constantin D. Pitis
Similarly to notions of constant capital/expenses in business or magnetization power for electric motors an energetic base load (E0) is always necessary to set up a mining process. Denominated as ?n
Oct 1, 2009
-
Flash Flotation Circuit Design Considerations"The first SkimAir flash flotation cell was installed in Outokumpu’s Hammaslahti Copper Concentrator in 1982 to prevent overgrinding of soft sulphides in the milling circuit. Since this first installa
Jan 1, 2017
-
Ore Microscopy Applied to the Beneficiation of Volcanogenic Massive SulfidesBy Orlando C. Gaspar
Abstract - The presence of fine-grained mineral intergrowths, the complex distribution of deleterious minor elements, and the variable base-metal contents in some assemblages commonly pose technical p
Jan 1, 1997
-
The Past 70 Years of Flash SmeltingBy M. Lahtinen, P. Latostenmaa, I. Kojo, E. Peuraniemi, M. Lindgren, S. Jyrkönen, M. Jåfs
The year 2019 marks the 70th anniversary of Flash Smelting. The technology was operated on industrial scale for the first time at the Outokumpu Harjavalta copper smelter in Finland in 1949. Since then
Jan 1, 2019
-
Ore Microscopy Applied to the Beneficiation of Volcanogenic Massive Sulfides (89e4320c-184a-4b9d-8a40-34c652dfef8c)By Orlando C. Gaspar
The presence of ?ne-grained mineral intergrowths, the complex distribution of deleterious minor elements, and the variable base-metal contents in some assemblages commonly pose technical problems for
Jan 1, 1997
-
Thompson 1-D Deposit Geology and StructureBy Rob Stewart
Acknowledgements ? Josef Macek(Manitoba Geological Services) ? Sally Goodman (SRK) ? Inco Geologists ? Rogerio Montiero ? Thompson Mine Geologists Introduction ? Regional Geology ? Thompson G
May 1, 2006
-
Improving the performance of shot-sawsBy J. H. Archibald
"IntroductionShot-saws are used for sawing rock throughout the dimension stone industry especially in granite quarry mills. Shot-saws, as currently designed, have an inherent wear problem which leads
Jan 1, 1993
-
Towards Petrophysical Characterization of Comminution BehaviorBy Peter Fullagar, Adel Vatandoost, Steve Walters, Toni Kojovic
"Traditional comminution tests are a vital component in every mine plant design. Comminution behavior governs both the cost of equipment and its operating efficiency. Most comminution tests are conduc
Jan 1, 2009
-
Biological Sulphide Production for Process and Environmental ApplicationsBy Lyn Jones, Mike Bratty, Rick Lawrence, David Kratochvil
"The treatment of water is required at many mining operations to remove metals and prevent the discharge of contaminated water to the environment. In other cases, water treatment is used to provide be
Jan 1, 2006
-
Development of New Frothers through Hydrodynamic Characterization of Frother ChemistryBy J. A. Finch
"Much progress has been made over the last several years in the ability to measure flotation cell hydrodynamic parameters in both the laboratory and plant. These techniques have allowed fundamental re
Jan 1, 2007
-
Electrical Model of an Electrowinning Circuit Including Stray Current through Electrolyte PipingBy S. C. Richardson
The electrowinning (EW) circuit involves using DC current in the electro-deposition of metal ions dissolved in an electrolyte solution. This paper reviews a method to generate an electrical model of a
Jan 1, 2019
-
Effluent Treatment Practice at the David Bell MineBy A. N. Veltmeyer
"INTRODUCTIONTeck-Corona Operating Corporation's David Bell Mine is located 35 Km east of Marathon, Ontario. In conjunction with its 1000 tonne per day gold concentrator, the company operates an efflu
Jan 1, 1989
-
Terraflow: A Cost-effective Alternative Binderin Backfill ApplicationBy Ike Isagon
Outline 1.Background Sudbury Backfill Operations 2.Alternative Binder 3.Alternative Binder Trial Process Flow Diagram ?Laboratory Results ?Plant Trial ?Final Evaluation and Approval ?Manageme
Nov 1, 2011
-
Evaluation of the Performance of a CIP Gold Recovery ProcessBy M. Courchesne, C. Barbery, D. Hodouin, C. Carrier
"The carbon-in-pulp process for recovery of gold dissolved in dilute cyanide solutions, in the presence of solids, has now replaced the convedntional processes of pregnant liquid/barren solids separat
Jan 1, 1987