Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Washington Avenue Tunnel Project: Fortifying Aging Underground Infrastructure

    By Andrew R. Klaetsch, Peter W. Deming

    "The Washington Avenue tunnel in Kingston, NY was completed in 1912 to convey combined storm water and sanitary sewage. Over a mile in length, the tunnel was driven almost entirely in bedrock, with th

    Jan 1, 2016

  • DFI
    Soil Nail Design Optimization of 100 Ft Deep Excavation Project in San Diego, CA

    By Babak Mamaqani, Pirooz Barar

    The Heights project was located at Fashion Valley North, San Diego, CA. The scope of the project was to replace two existing commercial buildings with a large 7-story multi-family residential building

    Sep 8, 2021

  • DFI
    Philadelphia Dock Story—Pile Challenges at Delaware River

    By Craig H. Olson

    "A new ship dock at a Philadelphia area refinery will be capable of docking the largest tanker to travel the Delaware River, the Stena V-MAX, which will induce significant lateral loads. The loads at

    Jan 1, 2008

  • DFI
    Philadelphia Dock Story—Pile Challenges at Delaware River (06bf9951-abf5-4656-aab7-81fa955662d4)

    By Craig H. Olson

    "Anew ship dock at a Philadelphia area refinery will be capable of docking the largest tanker to travel the Delaware River, the Stena V-MAX, which will induce significant lateral loads. The loads at t

    Jan 1, 2008

  • DFI
    Center Rock Sets New Record on St. Louis Metro Project

    "The Metropolitan St. Louis Sewer District (MSD) in Missouri, the country’s fourth largest sewer system, is upgrading its storm and wastewater infrastructure in a 23-yearlong, $4.7 billion initiative

    Jan 1, 2017

  • DFI
    Lessons Learned From Construction Of A Tire Plant In Karst, Ns2 Tires, White, Ga

    By Robert L. Goehring, Fred Munene

    This case history for three major additions to a tire manufacturing plant in north Georgia discusses the impact of highly variable Karst (sinkhole) geology on both foundation design and construction.

  • DFI
    San Diego Courthouse Commons Shaft Shoring And Tunnel Canopy Tubes

    By Ali Nasirian Ph. D., Gabriel Carvajal

    To facilitate the safer and more secure transportation of inmates from San Diego Central Jail to the new San Diego Courthouse, the County of San Diego committed to building a new transfer facility as

    Oct 1, 2022

  • DFI
    Quality Control and Testing of Jet Grouting and its Interpretation in Relation to the Christchurch Town Hall Restoration Project.

    By David Chadwick, Paul Marsden, Chris Hughes, Mathias Delapille

    "Following damage caused by the 2011 Christchurch earthquakes, the NZ$127.5million Christchurch Town Hall Restoration project is due for completion in 2018. The building is undergoing extensive repair

    Jan 1, 1900

  • DFI
    Performance Monitoring for Deep Excavations

    By Alexi J. Neill

    "This presentation will showcase two challenging projects with deep excavation support systems in the Atlanta area where state-of-the-art instrumentation and monitoring systems were used to manage ris

    Jan 1, 2016

  • DFI
    Drilling and Grouting For the Rehabilitation of Contaminated Areas: An Italian Case History

    By Raffaella Granata, Daniele Vanni

    "This paper presents the drilling and grouting program performed at two abandoned landfills located into former calcarenite rock quarries in Manfredonia, Italy. Tests performed after the abandonment o

    Jan 1, 2016

  • DFI
    The Berkeley Art Museum: Using Deep Foundations to Repurpose a Historical Building

    By Timothy Nelson, Simon Burnworth

    "The University of California’s new Berkeley Art Museum and Pacific Film Archive will showcase a collection of art and film in a facility that pairs an existing 1930s-era printing press facility with

    Jan 1, 2017

  • DFI
    The Impact Geotechnical Data Management Systems May Have on Risk Allocation for Differing Site Conditions in Construction Contracts

    By Steven M. Henderson, Zachary D. Jones

    The risk of allocation in construction contracts is a primary concern for all parties. For contracts involving subsurface construction the allocation of site condition risk is critical. In the past on

    Jan 1, 2017

  • DFI
    Elliptical Jet Grouting for the Sela-22 Project in New Orleans, LA: An Innovative Solution

    By Filippo Maria Leoni, Gianluca Pianezze

    "As part of the Southeast Louisiana (SELA) drainage program, designed to reduce flood damages in the City of New Orleans and surrounding parishes, the SELA-22 project entailed the construction of a co

    Jan 1, 2017

  • DFI
    Ground Improvement for Underground Construction in South Florida

    By Christopher Sammon, Nicholas Turus

    "The demand for underground parking in South Florida has increased as a result of changes to the local building code, coupled with developers’ desire to improve building aesthetics and provide much ne

    Jan 1, 2017

  • DFI
    New Insights into Driven Pile Vibrations using Novel Data Management and Visualization Tools

    By Mark Zablocki, Dakarai McCoy

    Ground vibrations are an unavoidable effect of driving piles and may pose a risk to nearby infrastructure and the comfort of adjacent occupants. Driven-pile-induced ground vibrations are known to vary

    Sep 8, 2021

  • DFI
    Trump International Is OPA Winner

    "Standing 92 stories high and just over 1,362 ft tall, Chicago’s Trump International Hotel and Tower is perfectly positioned at the center of one of the world’s most impressive skylines.The Tower serv

    Jan 1, 2009

  • DFI
    Capacity of Hydraulically Jacked Piles

    By Howard A. Perko, Melinda J. Hummel

    "Hydraulically jacked piles, herein referred to as jacked piles, are commonly used for underpinning existing structures to arrest settlement or augment an existing foundation for higher loads. They co

    Jan 1, 2017

  • DFI
    Design And Construction Of Underground Basin Using Composite Slurry Wall 500 Feet Away From The Pacific Ocean

    By Ihab Allam PE, Meeok Kim. PE. Ph. D

    The wet weather equalization basin (EB) planned for Pacifica, CA is a 45 feet deep rectangular shaped underground water tank containing over 2.1 million gallons of water, and located only 500 feet awa

  • DFI
    Hudson’s Revitalization: The Use of Robotics in the Work Place

    By Dave P. DeClerck

    Hardman Construction was faced with the challenge of completing a large earth retention project on a constricted downtown Detroit site, while maintaining a safe and productive worksite. To do so, new

    Jan 1, 2019

  • DFI
    Bertha Rescue Shaft – SR99 Tunnel

    By Lance Rasband, Richard Hanke

    "Seattle Tunnel Partners (STP) started mining on Seattle’s SR99 tunnel on July 30, 2013, working slowly through a 15 ft (4.6 m) thick fiber-reinforced concrete headwall. Once through the headwall, the

    Jan 1, 2015