    Guidelines for Soil Mixing

    "1.0 INTRODUCTIONThese Guidelines reflect the state-of-the-practice of the Deep Mixing Method (DMM) in North America. DMM is an in situ mixing process that breaks down the soil structure; injects bind

    Jan 1, 2016

  • DFI
    Piling Adjacent To Rail Tunnels At King’S Cross Central

    By David A. Hart, Barry P. Osborn, Richard J. Totty, Ana T. Carvalho, Max B. Elliott

    This paper addresses the experience designing and installing bored piles for the King’s Cross area. This includes continuous flight auger and rotary bored piles, with a range of diameters between 600

    May 1, 2022

  • DFI
    Bi-Directional Load Testing Of A Pile Bored Using Bentonite Mud In Guinea Bissau

    By Frédéric Rocher-Lacoste

    On July 2nd, 2007, LCPC and LOADTEST performed a static loading test with an Osterberg-cell on a bored pile of 1600 mm diameter. The 56.50 meters deep test pile constructed by Trevi Spa for Soares da

    Jan 1, 2008

  • DFI
    The Berkeley Art Museum: Repurposing a Historical Building

    By Timothy Nelson, Simon Burnworth

    "The Berkeley Art Museum and Pacific Film Archive (BAMPFA), which currently resides in a 1970s-era post-modern concrete structure just south of the University of California, Berkeley campus, was in ne

    Jan 1, 2016

  • DFI
    Execution Example of the Expanded Dry Jet Mixing (EX-DJM) Method (71db6e71-57a4-4d54-81bc-d746d501291d)

    By Kiyotaka Ohno, Nobushige Yasuoka, Yosuke Hioki

    "The diameter of improved columns adopted by the original DJM Method had been 1000 mm, however, in order to comply with the social need for construction cost reduction, the Expanded Dry Jet Mixing (EX

    Jan 1, 2015

  • DFI
    Hybrid Shoring Solutions for a Challenging Excavation Project Adjacent to a Subway – 21 Avenue Road, Toronto

    By Graeme Smart, Thomas Fiala

    "Yorkville Plaza II, a 40-storey signature condominium residence, is scheduled to open on Avenue Road in Toronto’s prestigious Bloor-Yorkville neighbourhood in spring 2017. In close proximity to Toron

    Jan 1, 2015

  • DFI
    Design, Construction, And Instrumentation Of An Atypical A-Frame Micropile Wall In Aspen, Colorado

    By Kyle Kershaw

    Micropiles are routinely used in the United States for foundation support and stabilization of slopes. In recent years, several retaining walls have been constructed using micropiles in an A-frame ty

    Jan 1, 2007

  • DFI
    Environmental Considerations Regarding The Danish Landworks For The Fixed Link Across The Øresund - Synopsis

    By Uwe Hess

    For the Danish landworks for the coming fixed link between Denmark and Sweden across the Øresund the focus has been on the environmental aspects of the construction and operation of the facilities. Th

    Jan 1, 1996

  • DFI
    Behavior Of Piled Raft Foundation Systems Under A Combined Set Of Loadings

    By Renato P. Cunha

    The paper explores a parametric analysis of a four-pile group in contact (hence piled raft) and without contact (hence standard pile group) with the superficial soil layer, under a combined set of loa

    Jan 1, 2006

  • DFI
    Optimization of Drilled Shaft Design for a Highway Bridge in Arizona Using Load Test Results (0a742001-9cf1-441f-b0fc-5890697ef97e)

    By John C. Niedzielski, A. Frances Ackerman

    The existing US-70 Bridge over the Gila River at Bylas, Arizona is planned to be replaced due to its current poor condition. The replacement bridge is planned to be a 15-span, 1,904-foot (580 meter) l

    Jan 1, 2017

  • DFI
    Grouting of an Artesian Zone in Advance of Powerhouse Excavation for the Red Rock Hydroelectric Project

    By Dewey W. Geary, Rachael V. Bisnett, R. Michael Bivens, Thomas G. Andrews

    "The powerhouse for the Red Rock Hydroelectric Project is being constructed at the toe of the existing U.S. Army Corps of Engineers’ Red Rock Dam immediately adjacent to the existing stilling basin re

    Jan 1, 2016

  • DFI
    Dynamic Pile Monitoring For Offshore Pile Acceptance

    By Scott Webster

    Dynamic pile Monitoring Services (DMS) have been used for testing of offshore piles for several decades. However, most of this testing was to measure hammer performance and pile stresses rather than

    Jan 1, 2010

  • DFI
    Deep Mixing for Levee Repair at Hurricane Protection Project, P-17A, Louisiana, USA

    By Peter Cali, David Yang, Rakshya Shrestha, Ralph Griffin, Sushil Kafle, Motoji Watanabe

    "As a part of the ‘US Army Corps of Engineers - New Orleans to Venice, Louisiana Hurricane Protection Project’, deep mixing ground improvement was designed to reinforce the soft ground for the emergen

    Jan 1, 2015

  • DFI
    Rammed Aggregate Pier Group Load Test Results For Large Infrastructure Project In The Middle East

    By Brian Metcalfe, Kord Wissmann, Gianni Martinez

    The Middle East consists of vast deserts that reach temperatures up to 50 degrees Celsius, with some areas characterized by endless sand dunes. When the project team selected the location for a large

    May 1, 2022

  • DFI
    Bi-Directional Testing Using Super Cells for the Jiaxing-Shaoxing River Crossing Bridge

    By Diane Reid, Antonio Marinucci, Robin Mao

    Super Cells are an innovative, open-shaped bi-directional static load testing device used to promote concrete flow during placement while utilizing greater cross-sectional area of the pile to achieve

    Jan 1, 2019

  • DFI
    DFI Europe Monitoring and Instrumentation Committee Objectives

    By Rob van Dorp

    "AbstractThe Monitoring & Instrumentation Committee (MIC) of DFI Europe has the objective to support DFI members in concern of risk management of geotechnical matters, where monitoring and instrumenta

    Jan 1, 2014

  • DFI
  • DFI
  • DFI
    Measurements of CDSM Strengths and Seepage Data Following Seismic Upgrades of San Pablo Dam

    By Atta B. Yiadom, A. David Miller, Robert C. Kirby, Sean M. Todaro

    "San Pablo Dam is a 170-foot (52-meter)-high earthfill embankment, located approximately 10 miles (16 kilometers) north of downtown Oakland, California, that impounds a 38,600 acre-feet (47.6 million

    Jan 1, 2015