Determination of Coefficient of Modulus of Sub-Grade Reaction for Free Head Short PileBy Sumit Kumar Biswas, Moyukh De, Sibapriya Mukherjee
"The piles often are also subjected to lateral (horizontal) forces and moments. In fact, there are some structures where the primary function of piles is to transfer lateral loads to the ground. Prope
Jan 1, 2015
-
Final Report – Workshop on Quality Assurance for Post-Grouted Drilled ShaftsBy Mary Ellen Bruce Large
"In partnership with California Department of Transportation (Caltrans), Federal Highway Administration (FHWA), and with support from International Association of Foundation Drilling (ADSC), Deep Foun
Jan 1, 2016
-
Workshop on Quality Assurance for Post-Grouted Drilled ShaftsBy Mary Ellen Bruce Large
"INTRODUCTIONIn partnership with California Department of Transportation (Caltrans), Federal Highway Administration (FHWA), and with support from International Association of Foundation Drilling (ADSC
Jan 1, 2016
-
Information Technology And Monitoring - Technologies De L'Information Et Monitoring - Innovations In Diaphragm-Wall Construction PlantBy Maurice Guillaud
The most striking innovations on diaphragm-wall construction plant are those associated with continuous real-time trajectory monitoring of the excavating tool (either a grab or a hydro-cutter). Th
Jan 1, 2002
-
Seepage Barrier at Bolivar DamBy Mohamed Elgouhary, Carol L. Tasillo, Daniel Koziol
"The Bolivar Dam, located near the Village of Bolivar, Ohio is one of a system of dams designed to provide flood control and water conservation in the Muskingum Watershed. The Bolivar Dam is a “dry da
Jan 1, 2016
-
An Unique Formula for the Stone-Column Group EfficiencyBy Abhijit Saha
"The stone columns improve the performance of foundations on soft and loose soil due to the ability of composite ground to sustain increased structural loads under reduced settlements. The interaction
Jan 1, 2015
-
Performance of Open-Ended Pipe Piles in Cretaceous Soils of BaltimoreBy Sanjeev Malhotra
"This paper presents the results of a pile installation monitoring and performance assessment program for pile foundations supporting 14 piers and 2 abutments of the 1700-ft long bridge crossing over
Jan 1, 2005
-
Non-destructive Testing Of Unknown Bridge Foundation Lengths Using Parallel Seismic TestingBy Chetan D. Savani, Mike K. Muchard
The necessity to evaluate undocumented foundation lengths is essential in assessing the useable life, need for scour protection, retrofitting, or full reuse of existing bridge foundations. For this pu
-
The World's Longest Directional Impact Driven PileBy Robert F. Stevens, Robin Givet, Kenneth Viking
"Summary This paper describes a case of a directional pile installation conducted from an existing oil platform in the Caspian Sea, offshore Baku. Results are presented for 660 mm outer diameter (660
Jan 1, 2014
-
Hybrid Shoring System for a Deep Temporary ExcavationBy Nadir Ansari, Brian W. Wilson, Marina S. W. Li
"A hybrid Deep Mixing (DM) shoring system was recently constructed for a high-rise development in downtown Vancouver, British Columbia, Canada for the temporary support of a five-level basement excava
Jan 1, 2017
-
Three Mass Stabilization Phases in the West Harbor of Helsinki, Finland – Geotechnical and Environmental Properties of Mass Stabilized Dredged Sediments as Construction MaterialBy Leena Korkiala-Tanttu, Noora Lindroos, Juha Forsman
"Construction works at the Helsinki city sea shoreline requires dredging and handling of contaminated sediments. Most of these soft dredged sediments are regarded as too poor quality material for eart
Jan 1, 2015
-
Accuracy of Low-Strain Pile Integrity Test ResultsBy Mahesh Hingorani
Integrity issues for bored cast-in-situ piles have raised the need for the use of non-destructive tests to verify pile integrity and detect possible anomalies in installed pile sections that could adv
Jan 1, 2019
-
Session 32 "Grout Mixtures and Materials 3"By Lois G. Schwarz
I did a project (Sungai Piah) as a consultant to your firm in Malaysia, where we were faced with a similar situation as sketched out in your question. The following is what we did for the grouting of
Feb 10, 2003
-
Piling In Calcareous Red Bed Soils and Weak Rock Formation – Design Development for a Gas Processing FacilityBy Rick Piovesan, Pramod Rao, Nihal Bohra, Mark Wahler
"This paper discusses the approach followed for the geotechnical design of 355 mm and 457 mm diameter driven open-ended steel pipe piles used for a gas plant at a green field site in Pilbara region in
Jan 1, 2015
-
Evaluation of Existing T-Z Models for Caliche Based on Numerical Analysis of Bi-Directional Load Tests Using NVShaftBy Ramin Motamed, Fahim M. Bhuiyan, Raj V. Siddharthan, Joseph Toth
The difficulty in material characterization and the erratic response of cemented soil layers, such as caliche in the Las Vegas valley, creates challenges for practicing engineers to reliably predict t
Sep 8, 2021
-
Deep Dry Soil Mixing Performance and Quality Control Acceptance CriteriaBy Patrick K. Wong, Richard Kelly
"The variability in strength and compressibility of in situ deep soil mixing products can be greater than the variability of the natural soil. However, satisfactory performance can be achieved by care
Jan 1, 2015
-
Excessive Pile Breakage, Gaylord National Resort And Conference Center, A Look Back 15 Years LaterBy Karl A. Higgins
In August 2004, the long-awaited National Harbor project in the DC metro area sprang to life with the design of Gaylord National Resort and Convention Center. When the project was in its final stages
-
Ground Improvement Using Stone Columns To Mitigate Liquefaction Potential Of Fine Sand By Wet Top Feed Vibro Replacement Method – A Case StudyBy Parameswaran V. S, Anshuman Singh
This is a case study on ground improvement using Stone columns at Kokrajhar in Assam which comes under seismic Zone V as per IS: 1893. The strata at site comprised of mostly fine sands with low SPTN v
Nov 1, 2022
-
“Borehole Stabilization” For Deep Excavation, An Essential Part In Bored Piling / Diaphragm Wall ConstructionBy Thomas Domanski
Any type of deep excavation whether for Bored Piling, Diaphragm Walls or Contiguous Bored Piling Walls depends on forming a stable borehole with a defined cross-section to receive safely the permanent
Sep 1, 2022
-
Design, Modelling And Construction Of A 12-Sided Diaphragm Walled ShaftBy Stephen Buttling
The construction of a water treatment plant in Dandenong, Victoria, required detention tanks and a pumping well. The design provided by the Engineer used conventional rectangular cast-in-situ reinforc
Nov 1, 2022