Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Team Organization in the Mining IndustryBy David M. Spatz
The way people interact, collaborate, learn and improve can have a profound impact on a company’s efficiency, performance, productivity and return on investment. This is the motive behind corporate e
Jan 1, 2000
-
Ground Improvements for CSO Connections to a Large Tunnel, Cleveland, OhioBy Narendra N. Khatri, Michael Deutscher, Jozef F. Zurawski
Five sewer connections were required to divert Combined Sewer Overflow (CSO)from existing outfalls to an old underutilized large diameter brick sewer (the Easterly Interceptor). The connections were p
Jan 1, 2005
-
Making Headway: All-Tool Carriers And Attachments Are Making An Impact On Advanced TunnelingBy Peter Bigwood
Whether drilling through tough clay or breaking rock, or facing the most severe conditions including mixed face ground, perched water and running and flowing sands, working under-ground certainly come
Jan 1, 2012
-
Diesel Emissions Control Strategies For The Use Of Diesel Engines In Underground Coal Mines – Preprint 97-144By N. Paas
Diesel powered equipment has been operated in underground coal fir mare than 50 years. According to the Mine Safety and Health Administration (MSHA), there are approximately 3,000 diesel units operati
Feb 24, 1997
-
Geologists Add Value at Newmont’s Nevada Mines – Part TwoBy Wayne Trudel, Eric Saderhold, Lloyd McEvers, Lori Clarke, Charles Lynn Bolin, Leroy Schutz
Editor’s note: This is the second part of a two-part series on how mine geologists added about 141t (4.53 million oz) at Newmont Mining’s gold operations in Nevada during 2003. Part one (ME, July2004
Jan 1, 2004
-
Modelling of Geomechanics and Geoecological State of Massif in Region of Large-Scale Mining Work with Using of Supercomputer TechnologyBy O. Konovalov, M. Zhuravkov
In report the results of performance of research works on building up of the connected geoecological and geomechanical monitoring system for modelling and study of a state of mining massif in a region
Jan 1, 2005
-
GIBE II Tunnel Project?Ethiopia: 40 Bars Of Mud Acting On The TBM ?Special Designs And Measures Implemented To Face One Of The Most Difficult Events In The History Of Tunneling?By Antonio De Biase
In October 2006, a 7m Double Shield TBM, boring through very poor volcanic formations, was pushed back by fluid mud, which presence had not been detected during previous field investigations, due to t
-
Techniques for Assessing and Mitigating Longwall Subsidence Effects on Interstate Highways Mining, Metallurgy and Exploration (02f14e56-44eb-4294-94a4-02fe73f626ca)By Yi Luo, Jian Yang, Hua Jiang
Surface subsidence induced by underground coal mining activities, especially longwall mining operations, can cause various problems to interstate highways ranging from structural integrity, drivabilit
-
Techniques for Assessing and Mitigating Longwall Subsidence Effects on Interstate Highways Mining, Metallurgy and ExplorationBy Yi Luo, Jian Yang, Hua Jiang
Surface subsidence induced by underground coal mining activities, especially longwall mining operations, can cause various problems to interstate highways ranging from structural integrity, drivabilit
-
Heap Leaching Discussed at RoundtableBy Kerry Lahti, Bryan Ulrich
On Feb. 11, 2005, more than 20 mining professionals gathered in Elko, NV for a day-long round-table discussion on heap leaching. Attendees included project managers, operators and environmental profe
Jan 1, 2005
-
Water Resources Development In The Arid Andean Antiplano Southern BoliviaBy S. A. Osterberg, J. L. Breckenridge, R. S. Popielak
Multidisciplinary investigations were completed to prove the availability of water resources for the proposed San Cristóbal silver-lead-zinc mine in the arid Altiplano of Bolivia. Surface water resour
Jan 1, 2002
-
Construction And Geological Engineering Of An Underground Ore BinBy J. F. T. Agapito, G. P. Bratton
A 16 m by 4.7 m by 24.5 m (52 ft by 15.5 ft by 80.5 ft) underground ore bin was constructed at an 810 m (2660 ft) overburden depth in poor quality, faulted and altered intrusive rocks at Molycorp&apos
Jan 1, 1985
-
Geotechnical And Structural Design Challenges Of The Fremont Central PARK Subway For The Bart WARM Springs ExtensionBy Mitchell L. Fong
The Bay Area Rapid Transit (BART) District will be extending BART service south along an 8.7-km (5.4-mile) -long corridor in the city of Fremont, California as part of the Warm Springs Extension (WSX)
-
Extensible Conveyor Systems For Long Tunnels Without Intermediate AccessBy Dean Workman
Long extensible conveyor systems are an important option for efficient tunnel excavation where intermediate access is impractical. The conveyor system designed for the Pula Subbaiah Veligonda Tunnel
-
Mining Cross Passages Using NATM/SEM on the Los Angeles Metro Eastside Extension TunnelsBy Christophe Bragard
The Los Angeles Metro Eastside Extension light rail project included a 1.5 mile underground segment, which consisted of twin 18'?10" ID tunnels, bored with two EPB-TBMs. One of the major project
Jan 1, 2008
-
Micro Tunneling 1.2-Mile, 72-In RCP With Crossings Of NJ Turnpike And CSX RailroadsBy Zhenqi Cai
The ongoing Overpeck Valley Parallel Sewer Project of Bergen County Utilities Authority (BCUA), New Jersey, is a US $65 million CSO improvement program to meet a State DEP consent order by 2010. One m
-
Engineering Geology and Cavern Design for New York CityBy Christopher Snee
??care has to be taken that the design is driven by sound geological reasoning and rigorous engineering logic rather than by the very attractive images that appear on the computer screen.??Hoek 1999
Jan 1, 2008
-
Performance Monitoring Of A Block Cave Mine Using Signal Processing And Waveform Analysis Of GPS DataBy D. Rutledge
Discrete (digital) signal processing techniques are proving to be very valuable tools for miners using the block cave method. Waveform analysis of different measured signals associated with active min
Jan 1, 2008
-
Moon Creek Reclamation Project Creative Solutions For An Historic Mine SiteBy B. A. Ridolfi, S. M. Alvarez
The Moon Creek Reclamation Project provides a case study in the development of creative cleanup solutions for an abandoned lead and zinc mine and mill site located in northern Idaho. Innovative design
Jan 1, 1999
-
Using Option Pricing to Predict Market Values of Publicly Traded Mining CompaniesBy Andrew K. Simpson
What will this deal do to the company’s stock price? This question arises when a publicly traded mining company is presented with a new mine project, or business combination. The standard tool fo
Jan 1, 2000